“Critical Chain” Project Management Presentation for KCMPUG March 19, 2003 Dave Higgins Consulting, Inc. Website: www.davehigginsconsulting.com Email:

Slides:



Advertisements
Similar presentations
Course ILT Information overload Unit objectives Identify the causes of information overload and reduce it by screening Control paperwork by organizing.
Advertisements

Extreme Programming Alexander Kanavin Lappeenranta University of Technology.
6-1 Goldratt’s Critical Chain  In 1997, Goldratt introduced the Critical Chain Project Management (CCPM) methodology to apply the theory of constraints.
Critical Path and Gantt
Critical chain project management edina nagy lajos kiss szabolcs hornyák.
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
Critical Chain Project Management
11-1 Critical Chain Project Scheduling Chapter 11 © 2007 Pearson Education.
Critical Chain Project Scheduling. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall11-2 Theory of Constraints (ToC) A constraint limits.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 21.
March 20, Dixie Crow Symposium, Warner Robins, GA Slide 1 Critical Chain Management - Reducing Depot Maintenance Flow Days Scott R. Schultz Mercer.
Theory of Constraints. IF: Clients never changed their minds And Vendors always supply, whatever we ask for, on time, And We do not have any absenteeism.
Project Management Workshop By Jonathan W. Powell, CGFM, PMP.
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
4.0 CRITICAL CHANGE IN PROJECT MANAGEMENT 4.1 Why should there be need other methods for Project Management to replace or change? Given the level of project.
1 Software Maintenance and Evolution CSSE 575: Session 1, Part 1 Course Introduction Steve Chenoweth Office Phone: (812) Cell: (937)
Quality Systems Frameworks
James R. Holt, Ph.D., PE. Constraints Management Washington State University’s Engineering Management Program
© Washington State University Fundamental Exam Review Overview the TOCICO Exams The Theory of Constraints
© Washington State University An Expert’s Conflict The Problem with Knowing James R. Holt, Ph.D.,
Applied Software Project Management 1 Introduction Dr. Mengxia Zhu Computer Science Department Southern Illinois University Carbondale.
IT Project Management, Third Edition Chapter 11 Chapter 1: Introduction to Project Management.
INFO 638Lecture #41 Software Project Management Resource availability and critical chain INFO 638 Glenn Booker.
1 Chapter 1: Introduction to Project Management. 2 Learning Objectives Understand the growing need for better project management, especially for information.
PowerPoint Presentation for Dennis, Wixom, & Tegarden Systems Analysis and Design with UML, 3rd Edition Copyright © 2009 John Wiley & Sons, Inc. All rights.
THEORY OF CONSTRAINTS (TOC) BY AMAR P. NARKHEDE. INTRODUCTION The theory of constraints is an overall management philosophy that aims at continually achieving.
AELDP ACADEMIC READING. Questions Do you have any questions about academic reading?
Operations and Production Management
Midterm Review SE503 Advanced Project Management.
Critical Chain From “Theory of Constraints” Developed by Elihu Goldratt in 1984 Goldratt – Many of his key ideas were first explained via “business novels”
Quick Recap.
File:CCPGS05 CC present Page: 1 ETXPGS
IS 556 Enterprise Project Management 1IS 556 -Spring 2008 Lecture 2 Apr 7, 2008 //48.
 Dr.Eliyahu Goldratt applied his theory of constraints(TOC) to the pratice of project mgt producing called critical chain.
Chapter 7 The Project Schedule and Budget Copyright 2012 John Wiley & Sons, Inc. 7-1.
1 Critical Chain From “Theory of Constraints” Developed by Elihu Goldratt in 1984 Goldratt – Many of his key ideas were first explained via “business novels”
TOC 1 Theory Of Constraints. TOC 2 Theory of Constraints How does TOC differ from the conventional shop control theory? Throughput definition * Emphasis.
Course: ETLS Managing for Improved Performance Professor: George G. Gleeson Student: Kou Song.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #3.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #2.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Chain Scheduling, PERT, and MS Project 2003.
Theory Of Constraints
Theory of Constraints Part I: Introduction. Theory of Constraints (or TOC) Relatively recent development Looks at the practical aspect of making organizational.
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
1 Allocating Resources to the Project Expediting a Project Fast-Tracking a Project Resource Loading Allocating Scare Resources.
Critical Chain A Novel by Eliyahu Goldratt Copyright 1997.
Critical Chain A Novel by Eliyahu Goldratt Copyright 1997.
Drum –Buffer-Rope Based on : R. Holt, Ph.D., PE. Traditional Approach: Divide and Conquer Division of Labor breaks down linkages complex systems into.
Abstracting.  An abstract is a concise and accurate representation of the contents of a document, in a style similar to that of the original document.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Critical Chain Project Management.
11-1 Critical Chain Project Scheduling Chapter 11 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
9-1 ELC 347 project management Day 22. Agenda Integrative Project –Part 5 Feedback Posted –Part 6 (page 378) Due Dec 9 –Completed project plan and presentation.
QUALITY OF MANAGEMENT GURUs : DR ELIYAHU M. GOLDRATT BY KLUANG MAN GROUP’S MEMBER: ROSMALINA BT HUSSIN (PA13014) NUR HIDAYAH BT AHMAD (PB13062) NOOR FAAIRA.
By Oliver Arnold. WHAT IS A PROJECT? WHAT IS PROJECT MANAGEMENT?  Projects are anything which involve change.  Projects have a beginning and an end.
ERP (21-550) Sharif University of Technology Session #6
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
The Project Schedule and Budget
Advanced Technical Writing
Critical Chain Project Scheduling
Fast, Agile, Simple Decemebr 2017 Think Simple, Run Faster.
ELC 347 project management
Critical Chain Project Scheduling
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
Technical Writing Abstract Writing.
Goldratt Research Labs
Project Scope Management
Theory of Constraints An Introduction
Theory of Constraints An Introduction
Presentation transcript:

“Critical Chain” Project Management Presentation for KCMPUG March 19, 2003 Dave Higgins Consulting, Inc. Website:

Dave Higgins Dave Higgins has been a student of systems development and improvement methods for nearly 30 years. Together with Ken Orr (of The Ken Orr Institute) and the late Jean- Dominique Warnier, Dave was one of the principal architects of the Warnier/Orr systems development methodology back in the 1980’s. During the course of his career he has performed hundreds of seminars on various topics from program design and modification, to systems and data base design, to requirements definition, to planning and project management. Dave has written five books on various aspects of software development and is the author of numerous articles and white papers. His first book, published in 1979, was one of the first on developing quality software for personal computers, and was translated into over a dozen languages. In recent years, Dave has focused on the strategic uses of technology to improve business processes, specializing in business process reengineering, strategic planning, data warehousing and knowledge management. Recent projects include the reengineering of document scanning and records retention systems for a big-three auto maker, and developing an electronic publication strategy for a national engineering standards organization.

CCPM Research… Article on CCPM for Cutter Consortium

Origins of CCPM Eliyahu Goldratt, Israeli physicist & PhD The Goal, 1984 Theory of Constraints, 1990 The Critical Chain, 1997 Website:

Theory of Constraints Identify the system’s constraints Decide how to exploit the system’s constraints Subordinate and synchronize everything else to the above decisions Elevate the performance of the system’s constraints, If any of the above steps shift the constraints, go back to step 1

CCPM Key Objectives Develop a realistic plan Develop a reliable plan Keep it simple Show the Critical Chain Minimize Schedule Change Optimize Globally, Minimize work-in-process and multitasking

Developing the CCPM Schedule Create the initial plan Level the resources Determine the Critical Chain, Add buffers to the schedule

What’s A Critical Chain? Consider a “vanilla” project plan…

What’s A Critical Chain? We all know about the critical path…

What’s A Critical Chain? First, resource contention is ID’d… R2R1R3R4 R1R2 R4R1

What’s A Critical Chain? Identify the critical chain… R2R1R3R4 R1R2 R4R1

What’s A Critical Chain? Add buffers to the schedule… R2R1R3R4 R1R2 R4R1 Feeding Buffers Project Buffer

What’s A Critical Chain? The Critical Chain Project Schedule… R2R1R3R4 R1R2 R4R1 Customer Commitment Date Project Start Date

What’s A Critical Chain? The Critical Chain Project Schedule… R2R1R3R4 R1R2 R4R1 Customer Commitment Date Project Start Date

And the advantage is? R2R1R3R4 R1R2 R4R1 R2R1R3R4 R1R2 R4R1 Original Plan CCPM Plan

And the advantage is? R2R1R3R4 R1R2 R4R1 R2R1R3R4 R1R2 R4R1 Original Plan CCPM Plan

The question becomes… If CCPM is better, why isn’t everyone doing it? Projects will be shorter Projects will be easier to manage, Projects will be more successful

CCPM Assumptions Tasks are estimated at 50% vs. 90% Resource contention is eliminated Buffers are easier to manage Multitasking is minimized Projects are staggered, Time is money

Project facts of life Time Resource Scope After Larry Putnam,

Project facts of life Time Resource Scope Smaller ProjectBigger Project

Project facts of life Time Resource Scope When resource is fixed… time can vary.

Project facts of life Time Resource Scope When time is fixed… resource can vary.

Project facts of life Time Resource Scope When time & resource are fixed… scope can vary.

Project facts of life Time Resource Scope When time, resource and scope are fixed… Oopsie!

Project facts of life and CCPM Time Resource Scope If projects get shorter… don’t costs increase?

Self-fulfilling prophecy? Only progressive organizations have generally tried it Requires a commitment from management to change Scheduling Multitasking Begging the question: How much is CCPM?

Conclusion Some good ideas Not a radical departure If you try it, you’ll probably have some success… If you work at an organization that will let you try it, you’ll probably have success even if you don’t.