14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.

Slides:



Advertisements
Similar presentations
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Advertisements

Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
MONITOR AND CONTROL EXECUTOR REAL TIME PROGRAM.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
1 National Radio Astronomy Observatory EVLA Status -- Jim Ulvestad, for Mark McKinnon, Rick Perley, and the EVLA Team.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Author George Peck EVLA System PDR December 4-5, EVLA Monitor and Control Hardware.
Hichem Ben Frej 5-Dec-2006 EVLA M&C Transition Software CDR CMP: Control Monitor Processor 1 Hichem Ben Frej Kevin Ryan.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
R MoeserCorrelator f2f Meeting1 MCAF (Metadata Capture and Formatting) Rich Moeser.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
EVLA Monitor & Control Transition System Software
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
EVLA Monitor & Control EVLA Advisory Committee June 10 – 11, 2002.
Output Formats Part I Bryan Butler NRAO Oct-31EVLA Correlator f2f2 Overview 2 types of data: –Monitor data - of interest to engineers and system.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Interim Data Capture & Format (IDCAF) Walter Brisken 2006 Dec 6.
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Bill SahrNSF Review May , EVLA Monitor & Control.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
EVLA M&C CDR EVLA Monitor Data Archive System John Benson, Chunai Cai NRAO Dec 6, 2006.
Software Overview Sonja Vrcic
EVLA Availability - or - When Can I Use It?
EVLA Archive The EVLA Archive is the E2E Archive
Monitor and Control Software
EVLA NSF Mid-Project Review System / Antenna Status
EVLA Computing Software Overview.
EVLA NSF Mid-Project Review System / Antenna Status
Antenna Monitor & Control Subsystem Engineering Requirements
Software Requirements
Rick Perley National Radio Astronomy Observatory
EVLA M/C Software PDR, 14 May 2002
VLA to EVLA Transition Plan
Bryan Butler (for Bill Sahr)
EVLA Advisory Committee Meeting
Science Commissioning
Software Requirements
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
Charge to the Review Panel
EVLA Monitor & Control System
Gustaaf van Moorsel September 9, 2003
Software Requirements
Operations Software Bryan Butler.
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA M&C Components Observation Executor, Interim & Final Obs2script
Correlator Growth Path
EVLA Monitor & Control Bill Sahr NSF Review May , 2006
EVLA Construction Status
Requirements Bryan Butler.
Presentation transcript:

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 2 Hybrid Array The Hybrid Array is the VLA with a mix of VLA & EVLA hardware and software –VLA antennas with EVLA antennas –VLA correlator with prototype WIDAR correlator –VLA correlator with WIDAR correlator subset –VLA correlator with full WIDAR correlator

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 3 Transition Plan The Transition Plan is the plan by which –Control of EVLA hardware is implemented as EVLA software –Control of VLA hardware is moved to EVLA-hosted software –With no significant periods of downtime on the array Hybrid Array operation ends when all VLA hardware and software has been replaced by EVLA hardware and software

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 4 Required Functionality –Control of EVLA antennas –Control of VLA Correlator To do so via EVLA-hosted software requires the new VLA Correlator Controller –Control of VLA antennas –Science data archiving in VLA format –Control of prototype WIDAR correlator –Control of WIDAR correlator –Science data archiving in EVLA format

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 8 New Correlator Controller

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 9 New Correlator Controller Phase I –Replaces present correlator controller (including the FPS array processor) –Provides visibility data to present, Modcomp-based VLA monitor & control system –Accepts commands over the Ethernet Phase II –Add a 2 nd CPU card to handle archiving & Antsol/Telcal functionality –Allows for parallel operation of Modcomp-based VLA software and Linux/Wintel-based EVLA software –Can retire the Modcomps without disturbing the EVLA

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 11 Milestones, Near Term mid-June 2004 First Fringes on Ant 13 at L band (done) mid-July 2004 Routine test observing using Ant 13 (VLA Operators controlling the antenna) mid-July 2004 Ant 13 moved into the array, 2 IFs, Bands L, X, K, & Q usable Early Sept 2004 Ant 14, first fringes Late Sept 2004 Ant 14 moved into the array Late Sept 2004 Ant 16, begin retrofit to EVLA design, full production electronics Q Inclusion of EVLA antennas in VLA observing (on a regular basis)

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 12 Milestones, Mid-term, Revision Q Control of new VLA Correlator Controller by Modcomp hosted software Q WIDAR Correlator PDR (3/29-3/30/2005) Q Control of new VLA Correlator Controller by EVLA-hosted software Q Archiving and Telcal functionality added to new Correlator Controller Q Control of VLA antennas by EVLA- hosted software End of Modcomps retired Q4 2005

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 14 Milestones, Long Term Q1-Q2 Assembly, HW tests, On-Sky tests of 2006 prototype WIDAR correlator at VLA site Q WIDAR Correlator CDR (6/19-6/20/2006) Q Acceptance of WIDAR Correlator subset Q Science data archiving, EVLA format Late Q4 Start of “shared-risk” observing with 2007 WIDAR Correlator subset

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 15 Milestones, long term End of Turnover of full WIDAR Correlator Q End of Earliest possible date to retire the VLA Q Correlator Q Last VLA antenna retrofitted to the EVLA design End of Hybrid Array Operations Late Q2 Last EVLA receiver installed 2012