SEE Business Forum Istanbul, Turkey November 22 - 23, 2012.

Slides:



Advertisements
Similar presentations
1 Northern Opportunities Forum November 2013 TSX: CRJ.
Advertisements

Photo Book: The Deer Trail Mine Story Piute County Utah Q
2008 Second Quarter Results TSX: LUN NYSE: LMC OMX: LUMI.
1st Quarter 2012 Results May 10, 2012 Tom Mair President and CEO.
September 15, 2014 TSX: CGG | HKSE: 2099 China Gold International Resources Corp. Ltd. Sustainable Profitability and Growth.
Managing Timberlands Owned by a REIT. 2 Key Components of a REIT  REIT Background: Form of C-corporation Created in 1960 Vehicle for the multitudes Pass-through.
May 13, TSX-V:OCO, Frankfurt:OR6, US OTC: ORRCF.
A Growth Company Producing Rare Precious Metals Palladium & Platinum June 7, 2000.
The Rapu Rapu Project Lafayette Mining Limited. Overview People Project - Location - Description - Social and Political - Statistics Prospects - Schedule.
Understanding and Valuating Exploration Companies 24 May 2007 Shane Hunter.
Results & Outlook BVN LISTED NYSE Compañía de Minas Buenaventura S.A.A. September, 2004.
4/16/2017 SHERRITT INTERNATIONAL Ambatovy Nickel Project: A Progress Report March 2008.
AEA Annual Results 31 March 2007 Andrew McCree and Alice Cummings 14 th June, 2007 Linklaters, One Silk Street, London.
Recommendation: BUY Sandstorm Gold (SNDXF). Industry Overview 2 Gold mining is capital intensive Capital is very expensive for small exploration and production.
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
Financial Overview and 2004 Outlook Richard T. O’Brien Executive Vice President and Chief Financial Officer.
0 March 2009 Annual Results Announcement Agenda Financial Highlights Business Review Strategies and Plans Open Forum.
 El Capitan Precious Metals, Inc. Meeting of Shareholders November 20, 2012Scottsdale, AZ.
The Importance of Feasibility Studies for Project Financing FINEX 2012.
TSX-V: OCO Frankfurt: OR6
Corriente Resources Inc. Copper Growth Story Corriente Resources Inc. Copper Growth Story November 2006.
Forward Looking Statements This presentation contains “forward looking statements”. These forward-looking statements are made as of the date of this presentation.
Investor Presentation. 2 Cautionary Statement This presentation contains “forward-looking information” which may include, but is not limited to, statements.
1 Presented By: Neil McMillan President & CEO Q1 Financials May 14, 2012.
August DISCLAIMER The following information contains, or may be deemed to contain, “forward-looking statements” (as defined in the U.S. Private.
INVESTMENT COMMITTEE REVIEW: Shine Group Divestiture Opportunity July 8, 2010 Draft - June 25, 2010.
Ramping-up to Full Capacity Investor Presentation February 2009.
Agnico-Eagle Mines Limited Business Review 2005 Building from Strength Sean Boyd President and Chief Executive Officer.
Queensland - Overview Population – 4.56 million Land – million square kilometres (just over 3x size of France!) GSP – $A258 billion Capital City.
Natural Resource Partners L.P. Investor Meetings New York and Boston May 2007.
Department of Public Enterprises DATE - 5 October, 2015 Page 1 Transformation of Eskom Enterprises Presenter: JUSTICE MAVHUNGU:DIRECTOR ENERGY & TELECOMMUNICATIONS.
Natural Resource Partners L.P. Investor Meetings West Coast March 19-20, 2007.
ABLE LABORATORIES, INC.. Safe Harbor Statement Except for historical facts, the statements in this presentation, as well as oral statements or other written.
1 Why Budgeting Matters NC Local Government Budget Conference Wilmington, NC July 2007.
Natural Resource Partners L.P. RBC Capital Markets 2 nd Annual MLP Conference Dallas, TX November 16, 2006.
Issued and Outstanding M Fully Diluted M Options 0.4 M Cash $119 M USD Short-Term Debt $338 M USD Long-Term Debt $571 M USD Share Price $2.07.
NEW STRATEGY FOR TRANSPORT GOVERNANCE IN MONTREAL March EMTA Meeting, Madrid.
1 TELUS investor conference call Announcement of Income Trust conversion September 11, 2006.
ASG Group Limited FINANCIAL RESULTS PRESENTATION - FY2006 Geoff LewisMD and CEO Dean LangenbachChief Financial Officer.
Natural Resource Partners L.P. 17 th Annual Wachovia Equity Conference Nantucket June 26, 2007.
1 Tricorn Preliminary Results For year ended 31st March 2012 June 2012 Mike Welburn, Chief Executive Officer Phil Lee, Group Finance Director David Leakey,
St Barbara Mines Limited Tokyo Presentation Eduard Eshuys Managing Director & CEO 26 September 2004.
MINERALS CORPORATION The Beginning of Chapter 2… June 2009.
Full Year Presentation 31 July This presentation relates to the Freightways Limited NZX announcement and media release of 31 July As such.
World Leader in Platinum Expansion : November 2002 PRODUCTION PROFILE Anglo Platinum 28 November 2002.
Acquisition of NetBenefit (UK) Limited Analyst Conference Call June 6, 2012.
Investor Presentation November Forward Looking Statements This presentation may contain forward-looking statements which are subject to a number.
Full Year Presentation 8 August This presentation relates to the Freightways Limited NZX announcement and media release of 8 August As such.
Bulgarian Geology and Mining Ministry of Environment and Water.
Vp plc The Equipment Rental Specialist Final Results Year ended 31 March 2007 Rental and sale of specialist products and services to construction, civil.
DWS Investor Presentation Proven model > Spirited culture > Sustainable performance Investor Presentation: Six months to 31 December 2009 Results Released:
Copper Bay Limited Presentation March Copper Bay Limited – Investor Presentation – March Overview  A Chilean-focused resources company 
Berkeley County School District Debt Service & Referendum Millage Ms. Brenda Blackburn, Superintendent Brantley Thomas, CFO March 8, 2016.
Fourth Quarter / Full Year Earnings 2008 Kimberly Ross Chief Financial Officer March 2, 2009.
W ASTE C ONNECTIONS I NC. Connect with the Future Credit Suisse Industrial & Environmental Services Conference May 14, 2013.
TRANS-SIBERIAN GOLD PLC 30 June 2016 Annual General Meeting TRANS-SIBERIAN GOLD.
BVL: MIRL March 2017.
TRANS-SIBERIAN GOLD PLC Annual General Meeting
GREENHILLS PORTUGAL LDA
Developing a Canadian Gold Deposit
BVL: MIRL October 2017.
Q Earnings Call.
EV Battery Metals Nickel Copper Cobalt Lithium
Tsumeb Smelter and Environmental management
Parliament Portfolio Committee
NAMASAGALI COLLEGE STRATEGIC PLAN
Financing Stages (Mining)
Transportation vehicles
Liberty Interactive Corporation Q3-11 Earnings Call November 8, 2011
Capella Resources Ltd TSX.V: KPS December 15, 2009.
Presentation transcript:

SEE Business Forum Istanbul, Turkey November , 2012

2 Dundee Precious Metals Highlights TSX:DPM $1.3B gold producer 2 operating mines in Bulgaria & Armenia Strategic complex concentrate smelter in Namibia 2012 gold production of 132,000 to 145,000 oz Low cash cost/ounce gold produced Growing pipeline of growth opportunities Experienced management team Attractive value proposition Operating assets Development assets Exploration assets Canada Namibia Custom Smelter Deno Gold Chelopech Krumovgrad Avala 51% Dunav 47% Sabina 11%

3 Portfolio of Assets TSX:DPM Avala 51% Krumovgrad 100% Chelopech 100% Dunav 47% Kapan 100% Tsumeb Smelter 100% Operating assets Development assets Exploration assets Canada Sabina 10.7%

4 Strong Balance Sheet Cash on June 30, 2012 (excluding AVZ & DNV) Significant Operating Cash Flow Annualized H TSX:DPM June 30, 2012 Total Debt:Total Capital = 10% Capital October 10, 2012 Share PriceC$9.13 Shares Outstanding125M Fully diluted shares Additional cash on dilution 147M C$66M 52 week high - low$ $5.82 $115M $83M $110M Gross Revenue by Metals Sold 6% 5% 41% 48% 36% 5% 4% 55% 64% 24% 6% 2011A 2012E 2016E Gold Copper Silver Zinc

5 Corporate Strategy TSX:DPM Build DPM into an intermediate, low-cost gold producer: Optimize value of existing operating assets Grow business beyond existing operating assets Sustain low quartile operating cost position Chelopech – production expansion and pyrite recovery project Smelter – complete Project 2012 upgrades & expansion Deno Gold Mine - open pit evaluation and underground extension Maintain a solid financial position Develop Krumovgrad Gold Project Establish deep pipeline of greenfield exploration opportunities Complete acquisitions that offer accretive growth, diversity and gold exposure

6 Chelopech Mine Low Cost, Long Life Producer TSX:DPM DPM Ownership100% LocationBulgaria AcquiredSept Resources Measured & Indicated (at Oct. 31, 2011) Gold (oz) (4.09 g/t)3,930,000 Copper (lbs) (1.31% Cu)862,840,000 Reserves Jan. 1, 2012) Gold (oz) (3.66 g/t)2,660,000 Copper (lbs) (1.15% Cu)572,600,000 Mine TypeUnderground Deposit Type High sulphidation epithermal deposit Estimated Mine expanded rate10 + yrs Complete expansion to 2 mtpy Q Continue to replace depletion and increase Mineral Resources and Mineral Reserves through exploration Complete feasibility study on the pyrite gold recovery project Strategy

7 Namibia Custom Smelter A Unique Strategic Asset TSX:DPM DPM Ownership100% LocationNamibia Acquisition March 2010$50M Capital expenditures to date$57M Project 2012 Costs$75M TechnologyAusmelt ProductCopper blister bars 2011 concentrate throughput180,403 tonnes Expanding smelter capacity240k – 310k tpy Sulphuric acid capture plant FSComplete Build a one of a kind asset to treat DPM and third party complex concentrate Upgrade operation to meet global standards Increase capacity and lower costs Contract other third party sources of complex concentrate to optimize throughput Strategy Tonne (000s) Smelter Capacity E Chelopech con Third party con 2013E: +O 2 H1 2012

8 Namibia Custom Smelter Environmental & Production Upgrades TSX:DPM Upgrade InitiativesStatusCosts Emissions control (Project 2012) Fugitive emissions (arsenic)Completion Q4 2012$75M Sulphur emissions (acid plant)Completion Q4 2014$167M Further Production Facility Optimization Initiatives Additional oxygen for Ausmelt furnace All primary smelting in Ausmelt furnace 3 blocks of dust-capturing chambers installed in the new baghouse New vehicle designed to vacuum dust off the ground for disposal New dust disposal site New oxygen plant

9 Deno Gold Mine Potential to Increase Size and Life of Mine TSX:DPM DPM Ownership100% LocationArmenia AcquiredAugust 2006 Mine TypeUnderground ProductAu/Cu & Zn concentrate Deposit TypePolymetallic vein deposit (swarms) Open Pit ResourceQ Underground ResourceQ Strategy Define the potential open pit and underground resource for the Shahumyan deposit Complete open pit and underground studies based on the new resources Explore regional license to define additional Mineral Resources Continue operational improvements & cost reductions

10 Krumovgrad Gold Project Low Cost, High Return Project TSX:DPM LocationBulgaria; 100% DPM ownership Proposed Mine TypeOpen Pit; low-sulphidation epithermal Au deposit Gold Recoveries & Grade85%; 3.4 g/t Annual ore production850,000 tpy Annual gold production74,000 ounces Annual silver production35,000 ounces Mine Life9 years Capital Cost to completeUS$127M* Total cash cost per oz AuEq$404* WasteSmall integrated tailings and mine waste facility Recovery processConventional crushing, grinding & flotation Advance project to a 2014 production date – subject to appeals Achieve 74,000 ounces of annual gold production Seek opportunities to further increase recoveries Evaluate other exploration opportunities within existing licenses Strategy Achievements Status 30 year mining concession Definitive Feasibility Study & NI Final EIA approval granted Nov. 2011Appeal decision pending Detailed engineering scheduleQ – Q Estimated construction timeline Estimated production timeline2014/2015 * As per NI technical report filed on SEDAR January 13, 2012

11 Forecast Significant Growth Over Next Three Years Growing Pipeline of Development Opportunities TSX:DPM Gold Production (000 oz) Pyrite Stream Krumovgrad Deno Chelopech Source: Cormark Securities, July 26, 2012

12 Partially Owned Exploration Investments Source of Additional Value & Growth TSX:DPM SECURITIESHOLDINGS% Oct. 10, 2012 Sabina Gold & Silver Corp. (TSX: SBB)18.5M10.7%$54M Special Warrants10M 29M Warrants (strike C$1.07)5M10M Total SBB$93M Avala Resources Ltd. (TSX-V: AVZ)110M51.4% $57M Special Rights50M 26M Total AVZ*$83M Dunav Resources Ltd. (TSX-V: DNV)56M47.3%14M Warrants (strike C$0.42)27.5M 0 Total DNV*$14M Total shares and other securities~$190M *AVZ and DNV are consolidated

13 Compelling Investment Opportunity Compelling Investment Opportunity TSX:DPM Solid operating assets with overall cost profile Significant cash flow and capital available to fund growth Strong balance sheet Proven Management and Board Attractive Value Proposition Underground at ChelopechNamibia Custom Smelter Entrance to Deno Gold MineKrumovgrad Growing pipeline of development/investment opportunities

14 Dundee Precious Metals Dundee Place 1 Adelaide St. East Suite 500 Toronto, ON, M5C 2V9 The Toronto Stock Exchange DPM – Common Shares DPM.WT.A – 2015 Warrants