LBT Q4 2007 Engineering Review ALPC – Primary Mirror Aluminum Shooting.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
Advertisements

OVMS M3 Accelerometer Pictures 16 August, 2010 Esguerra - LBT.
© Nintendo Game Document Game Development - Spring
Software engineering Olli Alm Lecture 2: requirements, modelling & representation.
Project Management and MS Project. The project management triangle: Time Resources Scope.
ECE 480 Gantt Charts Revisited. Keys to Successful Gantt Charts USE the default, finish-to-start, constraints obtained by specifying predecessors, unless.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
J. Large Binocular Telescope (LBT) Operational Readiness
August DISCLAIMER The following information contains, or may be deemed to contain, “forward-looking statements” (as defined in the U.S. Private.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Slide 1 CIM Implementation Strategies Sheng Ma CIM IMPLEMENTATION STRATEGIES Sheng Ma IEM 5303 Dec. 6, 2000.
LBT Q Engineering Review TAL Telescope Alignment.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
When Things Go Right Cornell’s PeopleSoft 8.9 Upgrade Lisa Stensland Manager, CIT Project Management Office May 15, 2008.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
Gathering Background Information and the Role of Technicians for the Blackfeet Water Compact With Gerald Lunak.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
GOALS Key to Motivation What are Goals? Goals are things we want – they mean something to us – they have value.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBTI Program Management Review Phil Hinz S.H. (Hop) Bailey 9 July
LBT Q Engineering Review Instrument Cooling.
Simple Machines Do now: Clear your desk except for ISN and pencil. BE READY to take a few notes. BE READY to take a few notes.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Engineering Review SAB Static Balancing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
Operating Systems Lecture 15 Disk Scheduling Adapted from Operating Systems Lecture Notes, Copyright 1997 Martin C. Rinard. Zhiqing Liu School of Software.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
11/15/11 - L16 Professional TalksCopyright Joanne DeGroat, ECE, OSU1 Professional Talks.
Microscope Notes. Eye Piece Also called the Ocular The part of the microscope you look through to see an image. The eye piece magnifies what you are.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
Lavin: Chapter 7 CTVT: pp
Advantages Programmers like it because they are able to change the programming to fit their preferences Great for small business because it is free Open.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
LBT Q Engineering Review ENGG – Engineering General.
Program Shutdown Update
Allocation of Unidentified Gas Statement - Update
Rural Electric Cooperative, Inc.
Quicken technical support number SDFGFFGGDF. QUICKEN TECHNICAL SUPPORT NUMBER QUICKEN TECHNICAL SUPPORT NUMBER
Centralized Classroom and Event Scheduling: Fall 2018
Chapter 9 Implementation.
We provide an affordable option that is both safe and clean:
Time & Priority Management
Overview of small drafting group output on Interpretation documents
Juniper Class of Service
Presentation transcript:

LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting

21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) None None

21-Dec-2007LBT Q Engineering Review Open Issues Technical Technical Documentation for Aluminization System from OSU improved but needs more work Documentation for Aluminization System from OSU improved but needs more work Upgrade of Aluminization System Upgrade of Aluminization System Cleaning/Stripping System Cleaning/Stripping System Glow discharge ? Glow discharge ? Locking devices unreliable Locking devices unreliable Crane needs to move ~1 meter farther forward to safely clear adaptive secondaries Crane needs to move ~1 meter farther forward to safely clear adaptive secondaries M3 swing arms need to be retracted farther than normal to clear belljar M3 swing arms need to be retracted farther than normal to clear belljar LBT personnel can do most of the process now, as long as nothing goes wrong LBT personnel can do most of the process now, as long as nothing goes wrong Something always goes wrong Something always goes wrong Schedule Schedule Aluminize SX August 08 (not 17 Aug) Aluminize SX August 08 (not 17 Aug) Financial Financial None None Resources Resources How much effort do you put into medium priority tasks? How much effort do you put into medium priority tasks?

21-Dec-2007LBT Q Engineering Review Progress (Q4/2007) Planning From Q3 Review Planning From Q3 Review Nothing planned for Q4 √ Nothing planned for Q4 √

21-Dec-2007LBT Q Engineering Review Planning (Q1/2008) Nothing planned for Q1 Nothing planned for Q1