3 February 2005 SYDNEY MINING CLUB. DISCLAIMER The information contained in this presentation has been prepared using the information available to Sino.

Slides:



Advertisements
Similar presentations
Comments on What are the constraints on inclusive growth in Zambia? Elena Ianchovichina and Susanna Lundström Arne Bigsten University of Gothenburg.
Advertisements

Olukunle Amoo BestKamco Resources, Toronto, Canada
KENTOR GOLD LTD PREDICTIVE GOLD DISCOVERY KYRGYZ REPUBLIC Presented by David Royle The CIS Precious Metals & Stones Summit, Moscow 14 February 2006.
2008 Second Quarter Results TSX: LUN NYSE: LMC OMX: LUMI.
Making Innovation Affordable Jo Derbyshire European Commercial Manager
Cleveland Mining Company Limited Management, Strategy & Projects August 2013 David Mendelawitz Managing Director ASX CodeCDG.
Babs property RKG Exploration. Babine Camp Bell Mine, past production and reserves 160MT grading 0.45% Cu and 0.34g/t Au. Granisle Mine, past production.
CHAMPION BEAR RESOURCES EXPLORING ADVANCED STAGE PRECIOUS METAL PROJECTS IN ONTARIO Exploration Update January 2010.
district development Tanzania – Lake Victoria Greenstone Belt.
Understanding and Valuating Exploration Companies 24 May 2007 Shane Hunter.
African Geology and Mineral Information Systems Expert Group Consultative Meeting.
4/16/2017 SHERRITT INTERNATIONAL Ambatovy Nickel Project: A Progress Report March 2008.
AEA Annual Results 31 March 2007 Andrew McCree and Alice Cummings 14 th June, 2007 Linklaters, One Silk Street, London.
Adrian Larking, Managing Director 26 November 2007 Green Rock Energy Limited Annual General Meeting.
International Cooperation in China’s Poverty Reduction Jiang Xiaohua Director General Foreign Capital Project Management Center Of LGOP October 19, 2007.
Developed by Cool Pictures and MultiMedia Presentations Copyright © 2004 by South-Western, a division of Thomson Learning, Inc. All rights reserved. Developed.
A Framework for Financial Statement Analysis Chapter 11.
1 Annual General Meeting November What we’ve done Where we are Barra Resources Ltd The Year in Summary  High Grade Wahloo Shoot discovered at.
Australian Perspective: EGSS Developments and Application Issues Peter Williams Assistant Director, Centre of Environment Statistics (P)+61 (0)
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
SMH Capital Houston, TX February 25, Forward Looking Statement The statements made by representatives of Natural Resource Partners L.P. (“NRP”)
AN INTRODUCTION TO ANGLO AMERICAN. 2 ANGLO AMERICAN Anglo American is a global diversified miner with a market capitalisation of more than $70bn and interests.
Anglo Coal Australia. Group Structure Anglo Coal Australia Australia’s third largest coal producer Investment in Australia totals USD 1.3bn Plans to.
WILDERNESS HOLDINGS – AUDITED YEAR END RESULTS 2010 INTERIM RESULTS ANNOUNCEMENT Six months ended 31 August 2012.
Copyright © 2014 All rights reserved, Government of Newfoundland and Labrador Earth Systems 3209 Unit: 5 Earth’s Resources Reference: Chapters 21; Appendix.
GOVERNMENT of Kazakhstan Mining assets of Samruk-Kazyna
International linkages and policy coordination Cambridge Endowment for Research in Finance (CERF)Alphametrics Ltd. The Cambridge Alphametrics Model LINK.
The Importance of Feasibility Studies for Project Financing FINEX 2012.
Corriente Resources Inc. Copper Growth Story Corriente Resources Inc. Copper Growth Story November 2006.
Implementing the EU’s Raw Materials Initiative across Europe Best practices in minerals planning Corina Hebestreit Athens, 29 February 2012.
Apollo Minerals Limited Iron ore and base metals in Australia and Africa Apollo Minerals (ASX: AON) is a minerals exploration company focused on identification,
Forward Looking Statements This presentation contains “forward looking statements”. These forward-looking statements are made as of the date of this presentation.
Heritage Gold NZ Limited Presentation AGM 23 September 2010 …..unlocking value.
Frome airborne electromagnetic survey, South Australia, workshop 30 November 2011 The Onshore Energy Security Program The Frome AEM Survey, South Australia.
NIUMINCO GROUP LIMITED. Important Information This presentation is not a prospectus nor an offer of securities for subscription or sale in any jurisdiction.
Ramping-up to Full Capacity Investor Presentation February 2009.
Chapter 8 – The Comprehensive Plan 10/3/ The Goals of Comprehensive Planning  Comprehensive plans are usually prepared for a period of 20 years.
ESPON Seminar 15 November 2006 in Espoo, Finland Review of the ESPON 2006 and lessons learned for the ESPON 2013 Programme Thiemo W. Eser, ESPON Managing.
INSPIRATION MINING CORP. JASPER PROPERTY. Jasper Property Jasper Property is located on Vancouver Island in British Columbia approx 120 km from Myra Falls.
Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011.
Exploration for and Evaluation of Mineral Resources: IFRS 6 Wiecek and Young IFRS Primer Chapter 12.
Rural Development Council 8 th December Contents Scottish Enterprise Focus Economic Downturn Implications & Actions Core Rural Objectives HIE Economic.
SYDNEY MINING CLUB CLUB 5 DECEMBER Outline of Presentation  the answer  the question  the explanation:  How we got here  Coal cash flow leverage.
February Project Location The Company ●Platinum exploration in the PGM rich, Bushveld Complex ●Bushveld Complex houses 75% of the world Platinum.
St Barbara Mines Limited Tokyo Presentation Eduard Eshuys Managing Director & CEO 26 September 2004.
Chamber of Mines in Zambia 24 November  Source of capital for:  Exploration  Pre-development activities  Mine Development  Investment/Expansion.
March Slide 1 Opportunities Exist The Region Is Vast, Under Explored And Undeveloped –Remote –Historical Lack Of Funds For Exploration Exploration.
Why a co-ordination action about Enhanced Geothermal Systems ? P. Ledru & A. Genter Engine Launching Conference February 2006 Orléans, France Opening.
1 Dilemmas in energy consumption, international trade and employment: Analysing the impact of embodied energy in traded goods on employment China University.
The Business Plan: Creating and Starting the Venture
1 Change in China’s Foreign Policy and The Belt and Road Initiative CHEN WENLING.
Moving Geothermal Sites from Exploration Prospects to Economic Projects Jim Lovekin GeothermEx, Inc. California Geothermal Summit 9 June 2005.
Bulgarian Geology and Mining Ministry of Environment and Water.
Mineral Exploration and Development
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Presentation Disclaimer Forward Looking Statements  This presentation may contain certain forward looking statements and projections regarding:  estimated,
Welcome to Precious Resources Limited. Our company name Precious Resources Limited symbolises our core belief, that our people are our principal asset.
INSPIRATION MINING CORP. JASPER PROPERTY. Jasper Property Jasper Property is located on Vancouver Island in British Columbia approx 120 km from Myra Falls.
Szilárd Árvay Ministry of Foreign Affairs of Hungary.
Mineral Resources EES – Chapter 19.
Railroad Projects Kingdom of Saudi Arabia Mr Andre Barbour Business Development Manager Australian Trade Commission - Jeddah Kingdom of Saudi Arabia AUSRAIL.
Council Improvement Plan Council Meeting 1 June
J. Mverecha Financing Mining Projects Risks and Opportunities.
TRANS-SIBERIAN GOLD PLC 30 June 2016 Annual General Meeting TRANS-SIBERIAN GOLD.
NT LITHIUM ASX code: CXO PROJECTS. | LITHIUM potential | July 2016 | Core Exploration Ltd 2 DISCLAIMER.
TRANS-SIBERIAN GOLD PLC Annual General Meeting
Developing a Canadian Gold Deposit
An introduction to ANGLO AMERICAN
BOARD Chris Creagh Mr Creagh is a geologist with more than 30 years of experience in the Australian and international mining industry. Chris brings significant.
MAZARS’ CONSULTING PRACTICE Helping your Business Venture Further
Presentation transcript:

3 February 2005 SYDNEY MINING CLUB

DISCLAIMER The information contained in this presentation has been prepared using the information available to Sino Gold Limited (Sino Gold) at the time of preparation of the presentation. External or other factors may have impacted on the business of Sino Gold and the content of this presentation since its preparation. In addition, all relevant information about Sino Gold may not be included in this presentation. Accordingly, you should not rely on the content of this presentation in relation to any further action including investment in Sino Gold. For further information about Sino Gold, you can obtain a copy of all recent ASX announcements made by Sino Gold at Any person considering an investment in Sino Gold is advised to obtain independent financial advice prior to making an investment decision.

year of the rooster The roosters  1933, 45, 57, 69, 81 or 93  Outstanding performers – shine when centre of attention What to expect  nonsensical plans with simple things made complicated  overconfidence and disappointments  hard-line politics The best strategy  do not fuss  keep your eyes open and mouth shut  stick to practical and proven paths  check all facts and figures  avoid speculative ventures

China - the case for consolidation China’s Major Gold Deposits Sino Gold plans to rule the roost

The world’s 4 th largest gold producer … Fractured, small scale operations  Average production approximately 16,000oz pa  No comprehensive development plan  Mining by explorers with orebodies mined to provide cashflow  Hand-to-mouth existences  Little attention to safety and environment  No exploration expenditure  Few lasting community benefits Little modern exploration carried out Geological prospectivity is high  Country structural issues are the main inhibitor to development  Ranked 10th (top quartile) on Fraser Institute 2003 survey

Projects to be fully funded Overall development plans to be implemented Modern and efficient processes to be used Systematic extraction of deposits through planned and coordinated operations Safety and environmental standards to improve Ongoing exploration expenditure to occur Profitable operations to deliver social benefits Government slogan “Scientific development” Ideally, what is required …

Foreign Direct Investment Largest recipient of FDI globally Other industries are receiving investment

Global Exploration Expenditure Less than 1% of FDI into mining The mining industry is missing out

Combine economic growth with social progress Promote coordinated, balanced development Aim to eliminate regional disparities – “Go West” Eliminate waste of resources Minimise environmental damage Sustain economic development Chinese Government policy and direction MLR 2004 White Paper supports consolidation and foreign investment

Similar to Australia in 1970/80s – largest operation (1974) Tennant Creek 171,000 oz p.a 4-5 growth oriented, well capitalised groups 2-3 may well be Chinese Sino Gold will be there   unique platform   10 years experience in China   world class asset being developed   intermediate scale gold production   strong operating cash flow What will emerge?

JINFENG is no turkey

37 Global Development Assets > 3.5m oz  Jinfeng Hatching a big one

19 deposits not held by majors and a number are not being developed due to social, environmental or economic issues  Jinfeng Hatching a big one

 JinfengTelfer Hatching a big one 2 development deposits >3.5M ozs not held by majors in Australiasia Jinfeng is one of them

Jinfeng project overview   refractory ore type, using Biox ® process, ~85% recovery   12 year mine life   capital cost approx. US$70M   operating costs approx. US$183/oz   US$40 million project loan facility finalised – Stand Bank & HVB   1.2 million tpa, approx. 180,000oz pa   Ore Reserves of 2.1Moz – 88% conversion ratio   ~1Moz in open cut; 1.1Moz from underground Aug grade 5gpt   Mineral Resources of 3.5Moz upgrade of ~1.1Moz Inferred expected   Likelihood of more at depth Equity of 82% in project Will be China’s second largest gold mine Phase 1 gold production in mid-2006 Jinfeng has entered the development & construction phase

Jinfeng phase 2 expansion study Scoping study completed by Ausenco U/G development brought forward to start year 2 (end of commissioning year) Plant upgrade from 1.2Mtpa to 1.8Mtpa at cost of US$14 million (±30%) No increase in operating costs per tonne Gold production of approx 300,000oz pa from open pit and underground Will be China’s largest gold mine

Jinfeng project timetable All Development Permitscomplete Relocation of Affected Families complete Access Road Upgradingcommenced Evaluate Site Earthworks Tenderscommenced   Start ConstructionQ1 05   Complete Detailed DesignQ2 05   First Gold Pour mid-06   Ramp-up to Design Capacityend-06

Over 50,000m of diamond drilling completed Deposit defined over 750m strike length and to 700m depth Average true thickness of 11m but is up to 30m thick Contained gold ranges between 5,000 and 7,000oz per vertical metre in the well-defined central part of the deposit Geometry controlled by structural framework Single mineralisation event with high grade continuity and low nugget effect F3 fault is dominant ore domain Largest domains at F2-F3 fault intersection F3 splays (eg F20) are secondary mineralised structures Open at depth 700m below surface, plunging to ESE Jinfeng is a world-class deposit

Jinfeng’s “Deep-East” extension Deep potential shown by strong intensity and widening anomalous arsenic values (shown by green lines) Broad arsenic zone outlines fluid flow and structurally controlled Au (in red lines) Drill rig being mobilised

Aero-Magnetics with Geological Interpretation Trenching Samples 442km 2 ground contracted in JV’s Geological mapping, geochemical sampling and ground geophysics is focused on near-mine prospects Extensive regional database being built US$2M exploration program underway Jinfeng’s near-mine opportunities Series of “near-mine” targets within the structural corridor High-grade trench values indicate immediate drill targets Series of “near-mine” targets within the structural corridor High-grade trench values indicate immediate drill targets Targets => anomalous geochemistry (up to 1.2gpt Au), rock chips and some IP Strongly anomalous gold soil geochemistry on dome contact to be investigated Soil Geochemistry Exploration focus on supporting decision to proceed with Phase 2

Sino Gold’s pipeline strategy JCL (86%) JINFENG (82%) Operation Development Exploration    WHITE MOUNTAIN SE GUIZHOU SHANDONG CHINA REVIEW

Unique country franchise   1 st mover advantage World class Jinfeng deposit   Currently 3.5Moz and potential for much more Jinfeng   Phase 1 to generate approx US$25-30M p.a operating cash flow   Phase 2 to generate approx US$45-50M p.a operating cash flow Portfolio of exciting assets   able to continue growth Sino Gold in summary SINO GOLD - the only substantial foreign producer in the world’s 4th largest gold producing country

Finally, Sino Gold’s advice about China … Never Winston Churchill Never Give Up!