Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.

Slides:



Advertisements
Similar presentations
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) HOMODYNE AND HETERODYNE READOUT OF A SIGNAL- RECYCLED GRAVITATIONAL WAVE DETECTOR.
Advertisements

September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Locking improvements after the end of VSR1 Gabriele Vajente for the Locking Group 14 th ILIAS WG1 meeting Cascina – March 6 th 2008.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
Virgo commissioning update - VSR1 first month summary E. Tournefier WG1 meeting, Cascina June 20 th,2007.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
Virgo Control Noise Reduction
Stefan Hild 1Ilias WG1 meeting, Sep 2005, Perugia Title GEO 600 Commissioning progress Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut)
September 22, 2005 ESF Workshop-Perugia 1 Virgo Control Electronic upgrade Annecy/Pisa/EGO B.Mours.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.
Interferometer Control Matt Evans …talk mostly taken from…
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
1 Noise sources at high frequency in Virgo E. Tournefier (LAPP-CNRS) ILAS WG1 meeting, Hannover December 12 th,2005 Recycled ITF sensitivities Noise sources.
ILIAS – WG1 Hierarchical suspension control G.Losurdo INFN Firenze.
Gabriele Vajente ILIAS WG1 meeting - Perugia Couplings of angular noises into dark fringe Diffused light studies.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
Status of VIRGO Francesco Fidecaro (after Lisa Barsotti) - University and INFN Pisa – on behalf of the VIRGO collaboration Aspen - January 19 th, 2005.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Harald Lückfor the GEO600 Comissioning team 1ILIAS Meeting, Palma, Oct Title GEO 600 Commissioning Status Based on a talk of Stefan Hild for the.
1 1.Definition 2.Deliverables 3.Status of preliminary design 4.Risks 5.Tasks to be done 6.Decisions to be taken 7.Required simulations 8.Planning ISC workshop:
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
MSC - 18 Oct 071 LOW FREQUENCY SEISMIC NOISE: LOCKING AND SENSITIVITY ISSUE Paolo Ruggi noise meeting.
Paolo La Penna ILIAS N5-WP1 meeting Noise analysis in Virgo Cascina, 7-8 July 2004 Analysis of noise in VIRGO.
Lisa Barsotti - University and INFN Pisa – on behalf of the Virgo Collaboration CASCINA - January 24 th, 2005 ILIAS  Locking of Full Virgo Status of VIRGO.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
Virgo+ Commissioning Status. Main upgrades and activities Laser system: from 10  25 watt output power at the IMC TCS: ring + Central Heating Electronics:
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
VIRGO LAPP – Annecy NIKHEF – Amsterdam INFN – Firenze-Urbino INFN – Frascati IPN – Lyon INFN – Napoli OCA – Nice LAL – Orsay ESPCI – Paris INFN – Perugia.
Analysis of the Virgo runs sensitivities Raffaele Flaminio, Romain Gouaty, Edwige Tournefier Summary : - Introduction : goal of the study / Overview on.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
The control of the Virgo Superattenuator: present and future Giovanni Losurdo - INFN Firenze/Urbino on behalf of the Virgo Collaboration.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
M. Mantovani ILIAS Cascina March 2008 Automatic Alignment system Improvements after the VSR1 M. Mantovani for the Alignment team.
Gabriele Vajente ILIAS WG1 meeting - Frascati Noise Analysis Tools at Virgo.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
1 DC readout for Virgo+? E. Tournefier WG1 meeting, Hannover January 23 rd,2007 DC vs AC readout: technical noises Output mode cleaner for DC readout.
1 Frequency Noise in Virgo by Matt Evans. 2 The Actors  Noise Sources  Input Mode Cleaner length noise  Sensing noise on IMC lock  Frequency Servo.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
The VIRGO detection system
1 ILIAS WG1 meeting, Hannover The 2 nd modulation frequency project.
Automation of the Lock Acquisition of the 3 km Arm Virgo Interferometer F. Carbognani for The Virgo Collaboration ICALEPCS - Geneva 14 October, 2005.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
(Some) noise hunting issues at Virgo
Status of Virgo GWDAW Dec 13-16
Alignment status & plans
Virgo Update B. Mours LIGO-G Z August 15, 2006 LSC meeting.
Homodyne readout of an interferometer with Signal Recycling
GEO – VIRGO joint noise hunting project
Commissioning progress Stefan Hild Ilias WG1 meeting, Sep 2005
Frequency Noise in Virgo
Virgo Update – LSC meeting
Status at the Prague meeting
Homodyne detection: understanding the laser noise amplitude transfer function Jérôme Degallaix Ilias meeting – June 2007.
Presentation transcript:

Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 2 Since last meeting…  ‘Jumps’ disappeared  Two runs: –C6 run: 29 Jul-12 Aug –C7 run: Sep  Big improvement in stability and sensitivity

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 3

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 4

C6 and before (June-July 05)

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 6 Actions before C6  IB aligned on the position of May (when no jumps were present). No more changes since then (except ABP offset during C6)  B2_3f phase detuned by 75° from “optimal” phase  Photodiode centering  Jumps disappeared  NE autoalignment using B1p (HH talk)  Alignment drift control  Improvement of SSFS loop  ITF more stable  ‘  technique’ implemented

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 7 Laser Control of the differential mode B5 BS B5_ACp B5_ACq B1_ACp B2_3f_ACp Subtraction of BS control noise by the correction sent to the end mirrors + -  ”  technique”

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 8 Actions during C6 C6 sensitivity has been improved twice:  Spurious beam damped on NE bench  Change of power stabilization setup (use error signal after MC)

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino days Recycling cavity power C6

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 10 C6 vs C5 (PR pwr *BS_AR)/(injected pwr*10) C5 (no drift control) C6 (drift control)

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 11 Duration: 336h Locking: 89.3% Science mode: 86.2% C6 Duty cycle

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 12 C6 lock statistics

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 13 C6 sensitivity

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 14 C6 inspiral range 04/08(15:00 LT): spurious beams damped on NE bench 04/08(15:00 LT): spurious beams damped on NE bench 10/08 (14:00LT): laser beam re-aligned on the IMC 10/08 (14:00LT): laser beam re-aligned on the IMC 11/08 (15:30LT): laser power stabilization reconfigured 11/08 (15:30LT): laser power stabilization reconfigured GPS: ( 297kPc) GPS: ( 300kPc) GPS: ( 297kPc) GPS: ( 300kPc) 04/08(15:00 LT): spurious beams damped on NE bench 04/08(15:00 LT): spurious beams damped on NE bench 10/08 (14:00LT): laser beam re-aligned on the IMC 10/08 (14:00LT): laser beam re-aligned on the IMC 11/08 (15:30LT): laser power stabilization reconfigured 11/08 (15:30LT): laser power stabilization reconfigured GPS: ( 297kPc) GPS: ( 300kPc) GPS: ( 297kPc) GPS: ( 300kPc) 04/08(15:00 LT): spurious beams damped on NE bench 04/08(15:00 LT): spurious beams damped on NE bench 10/08 (14:00LT): laser beam re-aligned on the IMC 10/08 (14:00LT): laser beam re-aligned on the IMC 11/08 (15:30LT): laser power stabilization reconfigured 11/08 (15:30LT): laser power stabilization reconfigured GPS: ( 297kPc) GPS: ( 300kPc) GPS: ( 297kPc) GPS: ( 300kPc) Best range: 0.4 Mpc

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 15 Improvements during C6 Sensitivity from Jul 29 Sensitivity from Aug 12 Suppression of the non stationary bump Power noise reduction Improvement of B1 optical gain (better alignment conditions ?) B1 electronic noise reduced by  2 (all the power sent to only one photodiode) Slight reduction of frequency noise (alignment ?)

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 16 Stray light Stray beams in the NE external bench. 3 dumped, the bump disappeared ! Effect of stray beams dumping on B1_ACp RMS (in the bump region) Coherence of dark fringe and NE bench photodiode: before and after dumping

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 17 Mode Cleaner transmission Power stabilisation loop July 29 : Sensitivity limited by power noise due to beam jitter before the IMC  Improvement of the beam alignment on the IMC  Improvement of the power stabilisation loop (error signal taken after the IMC) End of the run : the coherence between B1 & angular error signals of MC mirror disappears. Jul 29 Vs Aug 12 Power noise

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 18 Noise budget

After C6 (mid Aug-mid Sep 05)

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 20 Actions after C6  10 AA loops closed (HH talk)  Full hierarchical control implemented  New B5 setup (more power on B5, less frequency noise)  Tidal control on BS  Coil driver upgraded to reduce DAC noise  New PR control filter Important achievements: Anderson technique demonstrated SA control design demonstrated ITF left locked during night !

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 21  Frequency noise limits the sensitivity above 1kHz  It is due to B5_d1 shot+electronic noise which is introduced by the SSFS  This noise can be reduced if a bigger fraction of B5 is sent to B5_d1 Sensitivity Aug 12th B1 shot noise B1 elec noise Frequency noise Incoherent sum Frequency noise

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 22 B5 setup modification 50 % 2f 50 % Data in W Pr_B5_DC,AC d1 d2 50 % 90 % quadrants 10 % Data in W Pr_B5_2f 10 % 2f 90 % Data in W Pr_B5_DC,AC d1 d2 90 % 10 % 95 % quadrants 5 % Data in W Pr_B5_2f Old setup New setup  Now B5_d2 is used for SSFS, with 3 times more power (80% instead of 25%)  Expected reduction of the frequency noise by a factor 2

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 23 B5 electronic and shot noise converted into a laser frequency noise by the SSFS loop  New optical setup : the SSFS error signal receives 3 times more power  Laser frequency noise should be decreased by 2 wrt C6 - B1_ACp, end of C6 - B1_ACp, Aug 23 (new setup) - Shot + electronic noise - Electronic noise Edwige Tournefier Aug 27  Laser frequency noise has been reduced but coherence with B1 still visible Laser 0 B5_ACp Laser frequency control loop (SSFS) B5: results

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 24 DAC noise  “Simple” DAC noise estimation does not explain the noise ( Hz) in the 27 Aug sensitivity  DAC noise larger when correction applied R.Gouaty

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 25 Hierarchical control

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 26 zCorr reduction  Marionette/RM Hz  After reallocation zCorr rms reduced by  100 Without marionette 700 nm rms With marionette 7 nm rms

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 27 Automation 5 mins Lock to DF variable finesse AA ON OMC lock Marionette Low noise CD  technique Lines ON

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 28 M9 – Aug 25 Marionette + NE/WE coil driver upgrade New PR filter New B5 setup Turbo pump DET switched OFF

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 29 BS DAC noise  BS DAC noise limits the sensitivity  Reduction of coil driver gain requires tidal control  Tidal control required!

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 30 M9 inspiral range MPc Best range: 0.6 Mpc

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 31 Reliability  ITF stayed locked for 28 hrs with 10 dof AA ON, full hierarchical control, tidal control on BS

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 32 After M9 BS coil driver upgrade Low gain LC Aug 27

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino Aug inspiral range Best range: 0.85 Mpc Mpc

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 34 Non stationarity  Probably due to diffused light on the end benches

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 35 Sensitivity from Aug 12 (End of C6) Sensitivity from Aug 27 Improvement due to Linear Alignment (4 loops closed instead of 2) DAC noise reduction PR z control noise reduction (Neo filter with 100 Hz) BS z control noise : alpha tuning New optical setup for B5  Reduction of laser frequency noise 2kHz bump due to detection tower pump (exciting external bench resonances) August summary

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 36 Modulation depth  Modulation depth has been increased by a factor 2 (now m = 0.3)  PRCL control noise reduction expected  Tuning of the locking parameters needed

C7 run September

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 38 C7 run  Many new features: –AA –Hierarchical control –Tidal control on BS –Coil driver upgraded –New B5 setup –Modulation depth increased  We decided to make a short run (5 days) before shutdown

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 39 C7 vs C6 sensitivity

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 40 C7 inspiral range Best range: 1.65 Mpc

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 41 C7 duty cycle Locked: 70% Science mode: 64%

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 42 C7 lock statistics

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 43 Hardware injections

ILIAS WG1 – Perugia, September 19, 2005 G.Losurdo – INFN Firenze-Urbino 44 Progress summary