Onsala Space Observatory Present status and technical directions of the EVN Michael Lindqvist Onsala Space Observatory, Sweden Arpad.

Slides:



Advertisements
Similar presentations
05 – 10 September. Institute of Radio Astronomy - INAF Head-quarters in Bologna.
Advertisements

Dominik Stoklosa Poznan Supercomputing and Networking Center, Supercomputing Department EGEE 2007 Budapest, Hungary, October 1-5 Workflow management in.
SCARIe: Realtime software correlation Nico Kruithof, Damien Marchal.
Dominik Stokłosa Pozna ń Supercomputing and Networking Center, Supercomputing Department INGRID 2008 Lacco Ameno, Island of Ischia, ITALY, April 9-11 Workflow.
Baseband Processing and SKA Simulations using Supercomputers: Enhancing Australia‘s radio astronomy facilities and its bid for the SKA Steven Tingay Swinburne.
First e-EVN Science and Future Astronomy projects via EXPReS Michael Garrett Joint Institute for VLBI in Europe e-VLBI Workshop, Sydney, 13 July 2005.
DBBC3 Development - Digital Base-Band Converter 3
Electronic Transmission of Very- Long Baseline Interferometry Data National Internet2 day, March 18, 2004 David LapsleyAlan Whitney MIT Haystack Observatory,
E-RemoteCtrl: Concepts for VLBI station control as part of NEXPReS Arpad Szomoru (JIVE) Alexander Neidhardt (FESG), Martin Ettl (FESG), Matthias Mühlbauer.
VLBI in Africa Michael Bietenholz Hartebeesthoek Radio Observatory.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
DBBC Stutus Report November 2007 G. Tuccari, W. Alef, S. Buttaccio, G. Nicotra, M. Wunderlich.
An African VLBI network of radio telescopes as an SKA precursor Michael Gaylard Hartebeesthoek Radio Astronomy Observatory (HartRAO) P. O. Box 443, Krugersdorp.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The VLBA Sensitivity.
LOFAR AND AFRICA Daan du Toit DST – South Africa.
VLBA Sensitivity Upgrade Project Status Jon Romney NRAO, Socorro 7 th US VLBI Technical Coordination Meeting Haystack Observatory 2009 November 3–4.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array New VLBA capabilities.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The VLBA Sensitivity.
E-VLBI over TransPAC Masaki HirabaruDavid LapsleyYasuhiro KoyamaAlan Whitney Communications Research Laboratory, Japan MIT Haystack Observatory, USA Communications.
High Data Rate Transfer for HEP and VLBI Ralph Spencer, Richard Hughes-Jones and Simon Casey The University of Manchester Netwrokshop33 March 2005.
EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Recent eVLBI developments at JIVE Arpad Szomoru Joint Institute for VLBI in Europe.
An I3 funded by the EU through FP6 Alastair G Gunn University of Manchester Jodrell Bank Observatory OPTICON BOARD MEETING – 11 th /12 th October 2004,
Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) LOFAR Operations and Schedule.
VLBI/eVLBI with the 305-m Arecibo Radio Telescope Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman Jon Hagen.
Designing Experiments T. Venturi Istituto di Radioastronomia, Bologna, INAF ERIS, Manchester, 9 September 2005.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
RadioNet3 & SKA Franco Mantovani Project Scientist RadioNet3 Max-Planck-Institut für Radioastronomie, Bonn Istituto di Radioastronomia - INAF, Bologna.
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
An FX software correlator for VLBI Adam Deller Swinburne University Australia Telescope National Facility (ATNF)
76-m Lovell Telescope Jodrell Bank, UK Even big telescopes see no more detail than the naked eye High bandwidth data transfer - the future of European.
Large Area Surveys - I Large area surveys can answer fundamental questions about the distribution of gas in galaxy clusters, how gas cycles in and out.
Westerbork Netherlands Dedicated Gbit link Onsala Sweden Gbit link Jodrell Bank UK Dwingeloo DWDM link Cambridge UK MERLIN Medicina Italy Chalmers University.
VLBA Implementation of the ROACH Digital Backend Jonathan Romney on behalf of the VLBA Upgrade development team NRAO / Socorro First International VLBI.
Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of Technology Next Generation correlator meeting, JIVE 27 -
A real-time software backend for the GMRT : towards hybrid backends CASPER meeting Capetown 30th September 2009 Collaborators : Jayanta Roy (NCRA) Yashwant.
Prof. Steven Tingay (ICRAR, Curtin University) Workshop on East-Asian Collaboration on the SKA Daejeon, Korea, November 30 – December 2, 2011 A long baseline.
03/6/121 Using the VLBA for Spacecraft Navigation Jonathan Romney National Radio Astronomy Observatory VLBA 10 th Anniversary 2003 June 9 – 12.
E. Momjian, T. Ghosh, C. Salter, & A. Venkataraman (NAIC-Arecibo Observatory) eVLBI with the 305 m Arecibo Radio Telescope ABSTRACT Using the newly acquired.
, EVN Users Meeting Tom Muxlow Cagliari, 9 th October 2014.
1 eVLBI Developments at Jodrell Bank Observatory Ralph Spencer, Richard Hughes- Jones, Simon Casey, Paul Burgess, The University of Manchester.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Astrochemistry with the Upgraded Combined Array for Research in Millimeter-wave Astronomy D. N. Friedel Department of Astronomy University of Illinois.
NEXPReS Period 3 Overview WP8 FlexBuff High-Bandwidth, High-Capacity Networked Storage Ari Mujunen Aalto University Metsähovi Radio Observatory Finland.
Single Dish Summer School, Green Bank 2007 Things to do with Single Dish: VLBI Tapasi Ghosh NAIC/Arecibo Observatory Outline: Interferometry Basic.
EVN Performance and Reliability Iván Agudo. Collection of Highlights A large improvement of the EVN in terms of new stations & sensitivity! First fringes.
SA1: second year overview Arpad Szomoru JIVE January 30EXPReS Board Meeting, Utrecht, the Netherlands: SA1Slide #2 Outline Accomplishments in 2007.
PRESENTATION DATEEXPReS- TITLE OF YOUR PRESENTATIONSlide #1 What is EXPReS? EXPReS = Express Production Real-time e-VLBI Service Three year project (March.
NEXPReS Period 3 Overview WP5 Cloud Correlation Arpad Szomoru, JIVE.
WP7: Computation in a shared infrastructure Mark Kettenis JIVE Presented by Norbert Meyer PSNC.
TOG, Torun, April 2009 Arpad Szomoru, JIVE EVN/JIVE Technical developments.
NEXPReS Period 3 Overview WP2 EVN-NREN Richard Hughes-Jones, DANTE.
The UniBoard a RadioNet FP7 Joint Research Activity Arpad Szomoru, JIVE.
NEXPReS WP5 - Cloud Correlation Work Package Overview Arpad Szomoru JIVE.
What is FABRIC? Future Arrays of Broadband Radio-telescopes on Internet Computing Huib Jan van Langevelde, JIVE Dwingeloo.
SA1: Production e-VLBI service Period 2 Overview Arpad Szomoru JIVE EXPReS is made possible through the support of the European Commission (DG-INFSO),
FP6 and research infrastructures Main instruments Integrated infrastructure initiative (I3), several M€/year, 4-5 years communication network development,
Your name Your title, institution. RI READ ME To modify “Event – Location – Date” footer on all slides, go to Insert > Header & Footer. Change.
SA1: overview, first results
Technical Operations and R&D at JIVE
EXPReS, NEXPReS, UniBoard
The UniBoard Generic Hardware for Radio Astronomy Signal Processing
The UniBoard A RadioNet FP7 Joint Research Activity, 9 partners
EVN TOG-meeting Onsala Space Observatory
JIVE UniBoard Correlator (JUC) Firmware
SA1: third year overview
Astro Space Center of Lebedev Physical Institute, Moscow
The e-EVN Arpad Szomoru, JIVE.
Correlator Growth Path
DBBC Stutus Report November 2007
Technology and the Future of the EVN
Presentation transcript:

Onsala Space Observatory Present status and technical directions of the EVN Michael Lindqvist Onsala Space Observatory, Sweden Arpad Szomoru JIVE, The Netherlands

Onsala Space Observatory Outline Description of the EVN Present status Future directions and possibilities Summary

Onsala Space Observatory Difficult to predict the future The operational performance of the European VLBI Network depends on the effective collaboration of national observatories, the large collecting areas available at those observatories, and its success in incorporating the advances in technology. Target-of-opportunity capability and e-VLBI operation will contribute to robust and flexible operational procedures. Seamless EVN-MERLIN integration as the short baseline core of EVN can be achieved by adding EVN antennas to MERLIN and connecting the e-Merlin telescopes into the EVN correlator at JIVE. The increased correlation capability at JIVE of up to 256 Gb/s per radio telescope for routine operations with 32 stations will facilitate innovative research with EVN2015.

Onsala Space Observatory From the 60’s to real-time VLBI First transatlantic VLBI, Onsala, Sweden, 1968Real-time demo during opening ceremony of IYA, January 2009 in Paris O. Rydbeck J. Elldér B. Hansson

Onsala Space Observatory Description of the EVN The European VLBI Network (EVN) was formed in 1980 –MPIfR (Germany), IRA (Italy), ASTRON (The Netherlands), OSO (Sweden), JBO (UK) Today it includes 15 major institutes, including the Joint Institute for VLBI in Europe (JIVE) EVN has no central funding

Onsala Space Observatory

Onsala Space Observatory Description of the EVN EVN CBD EVN PC EVN Scheduler EVN TOG T. Muxlow A. Gunn M. Lindqvist A. Zensus

Onsala Space Observatory Description of the EVN EVN CBD EVN PC EVN Scheduler EVN TOG T. Muxlow A. Gunn R. Porcas M. Lindqvist A. Zensus

Onsala Space Observatory The EVN wheel Correlation TOG- meeting CBD- meeting EVN symp. EVN prop. PC- meeting EVN schedule EVN Session

Onsala Space Observatory Proposal trend across 9 years Introduction of Mark 5 recording system (game changer) Emergence of high bandwidth optical fibre networks (EXPReS, NEXPReS) Muxlow 2014 final figures assume an average of 11 ToOs/year

Onsala Space Observatory Current status Array90 cm18 cm6 cm3.6 cm1.3 cm0.7 cm EVN EVN (inc. SH/Ur) EVN+VLBA Maximum Angular Resolution in milliarcseconds Telescopes, 14 – 300 m Data rate 1 Gbps (2x128 MHz, 2-bit sampling) Global 1 Gbps Disk recording/e-VLBI Digital backends (DBBC2, CDAS, RDBE, R1002, DVP), recorders (mostly Mark 5) Typically Tb/station per session. Record > 1000 TB for a session Record: A 23−station global experiment. EVN Software Correlator at JIVE (SFXC)

Onsala Space Observatory Observing sessions The EVN observes during: – 3 EVN sessions (3x3 weeks) –10 e-VLBI sessions (10x24 hours) –Target of Opportunity –Out of Session The VLBI friends performs the observations

Onsala Space Observatory Typical EVN Session Frequency block 1 Network Monitoring Experiment (NME) (fringe tests) Calibration (rxg-file) User experiment ANTAB-, UVFLG- files Frequency block 2 Network Monitoring Experiment (NME) (fringe tests) Calibration (rxg-file) User experiment ANTAB-, UVFLG- files CorrelatorUsers

Onsala Space Observatory TOG-meetings Reports from JIVE –Calibration! Discussion about previous sessions Current & new instrumentation Technical priorities Reports from NRAO and Haystack Development: e.g. 64 Gbps with ALMA SRT, October 5, 2014 CBD

Onsala Space Observatory What does the user want? Average rankIn which direction should the EVN develop? 2.73Improved uv-coverage (more telescopes, more short spacings) 3.50Increased bandwidth to improve sensitivity 4.57Improved calibration in general (phase, amplitude, bandpass, polarization) 4.60Improved resolution (more long baselines) 4.73Frequency agility for spectral index imaging 6.06Real-time e-VLBI capabilities for more telescopes 6.34Extended observing time to be able to carry out big surveys 6.42Real-time e-VLBI capabilities for a larger fraction of observing time 6.71Improved astrometry 6.89Larger field of view

Onsala Space Observatory Enhancing EVN capabilities New observing modes –EVN+LBA –Out-of-Session (up to a maximum of 144 hours/year) –Triggered/interrupted e-VLBI observations –Disk recording and e-VLBI simultaneously (NEXPReS) A successful 4 Gbps recording/streaming demonstration was done on September 18, 2013, during the final review of NEXPReS New telescopes and collaborations –e-Merlin with all out stations at 1 Gbps (and beyond) –KVN, RadioAstron, Irbene, SRT, China, AVN, MeerKAT –Sub-arrays, more observing time with smaller telescopes –1 APERTIF beam of 12 WSRT dishes added to the EVN –SKA

Onsala Space Observatory Enhancing EVN capabilities e-VLBI/e-transport –High speed connectivity to, KVAZAR, KVN, Urumqi, … –Diskshipping-less operations in the EVN (1 Session – TB /station) see poster, H. Verkouter –100 Gbps technology rolled out –Bandwidth on Demand (BoD) standard to be implemented by NRENs –Clocks, frequency via commercial networks Next generation receivers, backends and recording systems –Broadband receiver 1.6 – 5 GHz (RadioNet3 JRA DIVA) –DBBC3 32 Gbps (DIVA, next talk by Alef) –Mark 6, Flexbuff (NEXPReS) –Observations at 2-4 Gbps (and beyond) Next generation correlators, SFXC, UniBoard

Onsala Space Observatory New observing modes Triggered/interrupted e-VLBI observations –Shortening the trigger timescales would be valuable to probe a new transient parameter space in the EVN –We have (soon) a system in place that can interrupt/trigger a new observation within 5-10 minutes (or so) –Will open up generic triggered interrupt programmes –The aim is to offer this mode in 2015

Onsala Space Observatory Gbps in the EVN Mixed mode tests –Different backends, February 2013 Bottlenecks? –Disk media –Field System: (DDC/PFB/FILA10G) –DBBC2: software (DDC 32 MHz) –2 Gbps, 2015 Discussion at users meeting –Which band(s) first? C-, X-, K- and Q-band. –Science impact?

Onsala Space Observatory EVN Software Correlator at JIVE (SFXC) The birth of SFXC - tracking of Huygens probe during descent to Titan First science project correlated in fall 2011 SFXC primary correlator for disk recorded data since summer 2012 Hardware correlator was closed down 2012 First real-time e-VLBI in December 2012 No MarkIV correlation since then e-VLBI with 13 1 Gbps Main Features –Data formats: Mark4, VLBA, Mark5B, VDIF –Pulsar gating –Possibility to combine gating and binning –(practically) Unlimited spectral resolution –Multiple phase centres (under development, real time) –Phased array mode (see EVN Newsletter #37, January 2014) See Poster, M. Kettenis

Onsala Space Observatory JIVE UniBoard Correlator (JUC) UniBoard: EC-funded, led by JIVE –JRA in RadioNet FP7 (also in RadioNet3) –Create generic, high performance computing platform for radio astronomy –FPGA –One board roughly equivalent to the MarkIV correlator –Real results –Close to commissioning

Onsala Space Observatory SXFC vs JUC Software: Fantastically flexible “Easy” to modify, improve, extend, expand, upgrade Hardware gets cheaper as time goes by Development effort and the effort needed to make it into an operational system grossly underestimated Definitely not suited for heavy lifting ~13 stations on current SFXC cluster at 1 Gbps 16 stations at 4 Gbps: factor of ~5 more hardware needed FPGA: Once it works, it goes like the clappers Perfect for “simple” operations Not nearly as flexible Hard(er) to develop/debug/modify/upgrade firmware 16 stations on 2 available UniBoards at 2 Gbps 4 Gbps: factor 2

Onsala Space Observatory Summary Development can come either bottom-up (new technology looking for astronomical uses) or top -down - (defining astronomical problems first and finding technical solutions afterward). EVN does both. Communication and scientific interaction between engineers and scientists involved in the development and operation of radio astronomical instruments, such as the EVN, is very important. EVN is making use of and drive technical progress The future for the EVN is looking bright and it will complement the SKA