C. Dimopoulou A. Dolinskii, T. Katayama, D. Möhl, F. Nolden,

Slides:



Advertisements
Similar presentations
Mitglied der Helmholtz-Gemeinschaft Beam Cooling at HESR in the FAIR Project 12 th September 2011 Dieter Prasuhn.
Advertisements

Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
The FAIR Antiproton Target B. Franzke, V. Gostishchev, K. Knie, U. Kopf, P. Sievers, M. Steck Production Target Magnetic Horn (Collector Lens) CR and RESR.
March 14-15, 2007ECloud Feedback, IUCF1 Electron-Cloud Effects in Fermilab Booster K.Y. Ng Fermilab Electron-Cloud Feedback Workshop IUCF, Indiana March.
Application of cooling methods at NICA project G.Trubnikov JINR, Dubna.
Intensity Limits and Beam Performances in the High-Energy Storage Ring
ALPHA Storage Ring Indiana University Xiaoying Pang.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
FFAG-ERIT Accelerator (NEDO project) 17/04/07 Kota Okabe (Fukui Univ.) for FFAG-DDS group.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
Paul Derwent 18-Oct-15 1 Stochastic Cooling in the Fermilab AntiProton Source Paul Derwent Beams Division/Pbar/CDF Sunday, October 18, 2015.
Eric Prebys, FNAL. USPAS, Knoxville, TN, January 20-31, 2014 Lecture 20 - Cooling 2 Anti-protons are created by hitting a target with an energetic proton.
Research in Particle Beam Physics and Accelerator Technology of the Collaboration IKP Forschungszentrum Jülich & JINR A.N. Parfenov for the Collaboration.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
MEIC Staged Cooling Scheme and Simulation Studies He Zhang MEIC Collaboration Meeting, 10/06/2015.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Beam loss and longitudinal emittance growth in SIS M. Kirk I. Hofmann, O. Boine-Frankenheim, P. Spiller, P. Hülsmann, G. Franchetti, H. Damerau, H. Günter.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
Paul Derwent 14 Dec 00 1 Stochastic Cooling Paul Derwent 14 Dec 00
Electron Model for a 3-10 GeV, NFFAG Proton Driver G H Rees, RAL.
Oliver Boine-Frankenheim, HE-LHC, Oct , 2010, Malta Simulation of IBS (and cooling) Oliver Boine-Frankenheim, GSI, Darmstadt, Germany 1.
Accumulator Stacktail Cooling Paul Derwent December 18, 2015.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
M. Steck, RUPAC 2006, Novosibirsk Cooling of Rare Isotope Beams in the ESR Cooling by: Stochastic cooling (pre-cooling) Electron cooling (final cooling)
NICA start-up scenario + questions of instabilities A.Sidorin For NiCA team NICA Machine Advisory Committee at JINR (Dubna) October 19-20, 2015.
Collective effects in EDM storage ring A.Sidorin, Electron cooling group, JINR, Dubna.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
1 Electron Cooling of Proton Beam in COSY and S-LSR A.Kobets, Yu.Korotaev, I.Meshkov, A.Sidorin, A.Smirnov JINR, Dubna J. Dietrich, V.Kamerdjiev, R.Maier,
Harmonic lasing in the LCLS-II (a work in progress…) G. Marcus, et al. 03/11/2014.
CERN F. Ruggiero Univ. “La Sapienza”, Rome, 20–24 March 2006 Measurements, ideas, curiosities beam diagnostics and fundamental limitations to the performance.
By Verena Kain CERN BE-OP. In the next three lectures we will have a look at the different components of a synchrotron. Today: Controlling particle trajectories.
Debuncher Stochastic Cooling Paul Derwent March 3, 2016.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
RMS Dynamic Simulation for Electron Cooling Using BETACOOL He Zhang Journal Club Talk, 04/01/2013.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F f Quadrupole Pick-Ups at CERN & Fermilab A.Jansson FNAL.
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
Marcel Schuh CERN-BE-RF-LR CH-1211 Genève 23, Switzerland 3rd SPL Collaboration Meeting at CERN on November 11-13, 2009 Higher.
 NICA is being constructed  For heavy ions we need very highluminosity level – 10 cm s  For keeping up such level we inevitably need cooling  Stochastic.
Schottky signals for long and tr. bb diagnostics F. Caspers (AB/RF); Jocelyn TAN ( AB/BI) 11-Dec-07, Chamonix, 1 Schottky signals for longitudinal and.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Marina Dolinska 28 th August, Cooling methods Electron (SIS18, ESR, RESR, NESR, HESR) Stochastic (ESR, CR, RESR, HESR) Laser (ESR ??, HESR ??).....other.
Helical Accelerating Structure with Controllable Beam Emittance S.V. Kuzikov 1, A.A. Vikharev 1, J.L. Hirshfield 2,3 1 Institute of Applied Physics RAS,
CR: status and activities at BINP I.Koop, BINP, Novosibirsk O.Dolinskyy, GSI,Darmstadt , MAC, GSI, Darmstadt.
ELENA RF Manipulations S. Hancock. Apart from debunching before and rebunching after cooling, the principal role of the rf is to decelerate the beam and.
Oleksiy Dolinskyy 23 rd October, FAIR layout of accelerators Collector Ring.
Mitglied der Helmholtz-Gemeinschaft Stochastic Cooling System for HESR - theoretical and simulation studies - Hans Stockhorst Forschungszentrum Jülich.
Mitglied der Helmholtz-Gemeinschaft Stochastic Cooling System for HESR - theoretical and simulation studies - Hans Stockhorst Forschungszentrum Jülich.
Coupled bunch Instabilities at ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University Refer to.
Alexei Fedotov, December 7, Beam parameters and collective effects for pEDM ring (December 7, 2009)
Interpretation of beam signals for high intensities
Stochastic cooling system: Start-up and project modes
Accumulation Experiments with Stochastic Cooling in the ESR
Oleksiy Dolinskyy December 1st, 2014
Status of the PS TFB Hardware Overview Machine results To be done
Calculation of Beam Equilibrium and Luminosities for
HIAF Electron Cooling System &
Simulation of Luminosity Variation
Electron Cooling Simulation For JLEIC
Large Booster and Collider Ring
Sabrina Appel, GSI, Beam physics Space charge workshop 2013, CERN
Limits on damping times
Summary of Beam Cooling Parallel Session
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
Parameters Changed in New MEIC Design
Presentation transcript:

Simulations of stochastic cooling of antiprotons in the collector ring CR C. Dimopoulou A. Dolinskii, T. Katayama, D. Möhl, F. Nolden, C. Peschke, M. Steck, L. Thorndahl TUIOB02 @ COOL'11 Alushta, Ukraine, September 2011

Required performance of CR stochastic cooling Short bunch of hot secondary beam from production target into the CR After bunch rotation and adiabatic debunching the δp/p is low enough to apply stochastic cooling Fast 3D stochastic cooling required to profit from production rate of secondary beams Antiprotons 3 GeV, 108 ions Rare isotopes 740 MeV/u, 109 ions δp/p (rms) εh,v (rms) π mm mrad Before cooling 0.35 % 45 0.2 % After cooling 0.05 % (*) 1.25 (*) 0.025 % 0.125 Phase space reduction 9x103 1x106 Cooling down time ≤ 9 s ≤ 1 s Cycle time 10 s 1.5 s (*) 20% lower (if possible) for HESR as accumulator ring (instead of RESR) C. Dimopoulou, COOL'11

Overview of the CR stochastic cooling systems Systems in frequency band 1-2 GHz Pickup Kicker pbars RIBs Method PH KH hor. hor., final stage difference PU PV KV vert. vert., PH+PV KH+KV long. long., Sum PU + notch filter PP ----- hor. + long., first stage Palmer: difference PU at high D ---- System in frequency band 2-4 GHz (future option) P2-4 K2-4 -------- Main issue for pbars: increase ratio C. Dimopoulou, COOL'11

Principle of betatron cooling & basic ingredients Phase advance PU-K ≈ 900 High amplification needed, electronic gain ~ 10 7 (140 dB) 1925-2011 ''rms'' theory (analytical model) ( Fokker-Planck equation for ) System gain g = PU response x Electronic gain x K response ~ 10-2 Coherent term= cooling force x undesired mixing (PUK) Diffusion= heating from Schottky noise (desired mixing (KPU)) + from thermal noise C. Dimopoulou, COOL'11

Principle of betatron cooling & basic ingredients Phase advance PU-K ≈ 900 High amplification needed, electronic gain ~ 10 7 (140 dB) Good cooling for overlapping Schottky bands i.e. M=1 and low ratio thermal noise/Schottky signal U To cool all the particles within the initial momentum distribution B ≥ 0 B and M depend in a contradictory way on the spread ΔT/T= - Δf/f ~ - ηring/pk Δp/p of the beam particles, they vary during momentum cooling In reality: choose ηring/pk for a compromise between B and M C. Dimopoulou, COOL'11

Principle of momentum cooling with notch filter The response of the notch filter well-separated Schottky bands M>1 B ≥ 0 for increased undesired mixing very small |η|≈1% i.e. ring almost @ γtr Fokker-Planck equation (solved with CERN code) provides the cooling force, induces extra undesired mixing Coherent term= cooling force x undesired mixing (PUK) System gain G = PU response x Filter response x Electronic gain x K response C. Dimopoulou, COOL'11

Features and developments for the 1-2 GHz system Beam PU/Kicker tank consists of 2 plates (up+down or left+right) with 64 electrodes/plate PH/KH=PV/KV rotated by 900 Plunging of PU electrodes i.e. moving closer to beam during cooling No plunging of KI electrodes Slotline PU electrodes at 20-30 K Cryogenic low-noise preamplifiers at 80 K (open option of preamplifiers in UHV at 20 K) Kickers at 300 K Effective noise temperature at preamplifier input Teff =73 K Optical notch filter (< 40 dB deep notches within 1-2 GHz ) C. Dimopoulou, COOL'11

Longitudinal PU/K impedance, sensitivity, PU plunging circuit convention: HFSS simulations, absolute values: at yPU= ±60 mm at yPU= ±20 mm Plunging of PU electrodes: factor 1.8 in sensitivity (3.4 in Zp) from yPU=±60 mm ±20 mm Relative measurements on prototype PU: Simplify: C. Dimopoulou, COOL'11

Input parameters & requirements CR Circumference 3 GeV antiprotons 221.45 m β=0.9712, γ=4.197, rev. frequency f0=1.315 MHz Ring slip factor η, slip factor PU-K ηpk Distance PU-K/circumference -0.011, -0.033 0.378 Beam intensity Initial rms momentum spread Initial rms emittance εh,v 108 3.5 10-3, Gaussian/parabolic 45 π mm mrad System bandwith 1-2 GHz Number of PU, K (longitudinal cooling) Number of PU, K (transverse cooling) 128, 128 64, 64 PU, Kicker impedance at midband 1.5 GHz PU/K sensitivity S(y)=1+slope* y PU/K sensitivity vs. frequency S(f) no plunging considered, PU electrodes at ± 60 mm 11.25 Ohm, 45 Ohm slope= 24.5 m-1 Effective temperature for thermal noise 73 K ideal, infinitely deep notch filter + 900 phase shifter Total installed power at kickers (limited by funding, can be upgraded) 4.8 kW Goal: Cool longitudinally from σp/p= 3.5 10-3  4 10-4 in 9 s Simultaneous transverse cooling from εh,v = 45  ≈ 1 π mm mrad C. Dimopoulou, COOL'11

Momentum cooling: Cooling force and diffusion G|| = 150 dB (3.2 107); t=10 s Coherent term: linear notch filter response around Δp/p=0  cooling force momentum acceptance of system (undesired mixing ≥ 0) > total initial Δp/p  Cooling of all particles t=0, 2.5, 5, 7.5 and 10 s Schottky noise dominates  long. cooling time ~ N Notch filter cuts thermal noise around all harmonics C. Dimopoulou, COOL'11

Momentum cooling: Feedback by the beam Feedback by the beam included: It deforms the cooling force and suppresses Schottky noise within the distribution, cooling loop is stable (Nyquist plot) G|| = 150 dB (3.2 107); t=10 s C. Dimopoulou, COOL'11

Momentum cooling: Results Optimization: For a given signal/noise ratio there is a gain so as to reach the desired σp/p in the desired time. Lower gain leads to lower σp/p but cooling takes longer.  For ultimate σp/p : increase signal/noise by plunging the PU electrodes during cooling Required installed power = 4 Pmax ( to account for signal fluctuations) Total cw power in bandwidth at kicker: Pmax = Ps(t=0)+ Pn , decreases as σp/p shrinks Schottky filtered thermal C. Dimopoulou, COOL'11

Betatron cooling rate: details Simultaneous notch filter momentum cooling ON Ansatz from Fokker-Planck results at Interplay between betatron & momentum cooling Optimum gain C. Dimopoulou, COOL'11

Betatron cooling: First results Initially: and grows...  M dominates the heating at all t: M~10 U in principle, need long cooling at very low gain (plunging helps only at the end) Reached εh = 4 π mm mrad in 9 s Beyond power limits...cw Pmax= 950 W ! For precise treatment, feedback by the beam must be included C. Dimopoulou, COOL'11

Conclusions I Pbar filter momentum cooling from σp/p= 3.5 10-3  4 10-4 in 9 s is possible in the 1-2 GHz band: with a gain around 150 dB (3.2 107), required max. installed power ~ 2.6 kW (cw ~0.7 kW), assuming unplunged PU electrodes (conservative case), plunging expected to help reaching lower σp/p, feedback by the beam not negligible but loop stable. The design η=-0.011 of CR is optimum for both 1-2 and 2-4 GHz bands (undesired mixing) C. Dimopoulou, COOL'11

Conclusions II Preliminary results show that betatron cooling is possible with separately optimized simultaneous filter momentum cooling (150 dB,~2.6 kW), down to εrms ~ 4 π mm mrad within 9 s, with an electronic gain at midband around 140 dB (107), with max. required installed power ~ 4 kW (cw ~1 kW) per plane h/v i.e. beyond the foreseen available power, assuming unplunged electrodes. As expected, betatron cooling suffers from large desired mixing M (required by filter momentum cooling) dominating the diffusion at all t. Way out: slow-down momentum cooling in the beginning C. Dimopoulou, COOL'11

Outlook Include feedback by the beam into betatron cooling model Time-optimization of momentum and betatron cooling together, distribution of available power accordingly, e.g., Initially, slower filter cooling to help the betatron cooling, then inversely to reach ultimate emittances and momentum spread. Apply initially time-of-flight and later notch filter momentum cooling, with simultaneous betatron cooling. Include plunging of PU electrodes, expected to reduce diffusion by factors 4-9, especially transversally Additional filter momentum cooling in the 2-4 GHz band, study handshake between 2 bands C. Dimopoulou, COOL'11

CR Parameters Circumference 221.45 m Max. magnetic rigidity 13 Tm Antiprotons Rare Isotopes Isochronous Mode   Max. particle number 108 109 1-108 Kinetic energy 3 GeV 740 MeV/u 790 MeV/u Velocity v 0.971 c 0.830 c 0.840 c Lorentz γ 4.20 1.79 1.84 Transition γT 3.85 2.82 1.67 – 1.84 Frequency slip factor η -0.011 0.186 Betatron tunes Qx and Qy 4.28, 4.84 3.19, 3.71 2.23, 4.64 Revolution frequency 1.315 MHz 1.124 MHz 1.137 MHz

Fokker-Planck & Formulae I [D.Möhl et al., Physics Reports 58 (1980)]

Fokker-Planck & Formulae II