StormingForce.com Motion. StormingForce.com StormingForce’s technology is significantly increasing productivity and quality of manual repetitive tasks.

Slides:



Advertisements
Similar presentations
Configuration management
Advertisements

Configuration management
Test process essentials Riitta Viitamäki,
What is On Time Booking? Reservation and distribution system for passenger transport companies (airlines and ferries ) Tool that helps you to manage the.
This presentation contains forward-looking statements. Because such statements deal with future events and are based on KCS’s current expectations, they.
JinkoSolar Holding Co., Ltd. Q Earnings Call Presentation June 7, 2013.
1 Eurostat Unit B1 – IT Systems for Statistical Production IT outsourcing in Eurostat – our experience Georges Pongas, Adam Wroński Meeting on the Management.
© 2013 Sri U-Thong Limited. All rights reserved. This presentation has been prepared by Sri U-Thong Limited and its holding company (collectively, “Sri.
Hedge fund flows on pace to nearly double 2012
2013 LUXOFT AND/OR ITS AFFILIATES. ALL RIGHTS RESERVED.1 1 SOFTWARE ENGINEERING TECHNOLOGY AUTOMOTIVE TRAVEL AND AVIATION ENERGYTELECOM FINANCIAL SERVICES.
Chapter 2 – Software Processes
Innovations in Structured Products October 25, 2010 An Innovator’s Dilemma?
Acquire Foundational Knowledge Of Marketing Information Management To Understand Its Nature & Scope.
Aker Exploration: Rig for oil Status and Outlook Bård Johansen, President & CEO.
Managing the Information Technology Resource Jerry N. Luftman
Saxo Bank OUTLOOK 2011 Saxo Bank’s HQ in Copenhagen June 24, 2015.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Hi, I’m Dave Vellequette, CFO of Avaya
SDLC. Information Systems Development Terms SDLC - the development method used by most organizations today for large, complex systems Systems Analysts.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Examine Quality Assurance/Quality Control Documentation
Bulgaria “How to make a business plan”. The business plan is written document describing the nature of the business, the sales and marketing strategy,
About Waterloo website Project report June Outline Overview of process Project deliverables Lessons learned.
E Marketing E Newsletter and E-Surveys Are They For You???
John Locke Locke In Your Success, LLC
Mike Zenker Barclays Capital Research (415) November 12, 2007
Small Business Management
Instructore: Tasneem Darwish1 University of Palestine Faculty of Applied Engineering and Urban Planning Software Engineering Department Requirement engineering.
OHTO -99 SOFTWARE ENGINEERING “SOFTWARE PRODUCT QUALITY” Today: - Software quality - Quality Components - ”Good” software properties.
Configuration Management (CM)
1 Derivatives, Contingencies, Business Segments, and Interim Reports.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
OHTO -99 SOFTWARE ENGINEERING “SOFTWARE PRODUCT QUALITY” Today: - Software quality - Quality Components - ”Good” software properties.
Dunedin Enterprise Investment Trust PLC General Meeting – October 2013, Voting Analysis.
Mr. Amit Chheda (Strategist)
During the course of this meeting, we may make projections or other forward- looking statements regarding future events or the future financial performance.
Arihant Financial Services Tejas Shah
Primer Briefing “Brand Name or Equal” Purchase Descriptions Ask a Professor - # Date:
Chapter 2 – Software Processes Lecture 1 Chapter 2 Software Processes1.
Application Center 2000 at Microsoft A solution for managing high availability Web applications built on Windows 2000 Published April 2002.
Configuration Management CSCI 5801: Software Engineering.
Oracle Fusion Applications 11gR1 ( ) Functional Overview (L2) Manage Inbound Logistics (L3) Put Away Loads.
Internal and Confidential Cognos CoE COGNOS 8 – Event Studio.
Oracle Fusion Applications 11gR1 ( ) Functional Overview (L2) Manage Inbound Logistics (L3) Manage Supplier Returns.
SWE 513: Software Engineering
Oracle Fusion Applications 11gR1 ( ) Functional Overview (L2) Manage Inbound Logistics (L3) Manage and Disposition Inventory Returns.
2009 Coal Seam Gas Safety Forum Paul Zealand, Executive General Manager Upstream Oil & Gas Friday 14 August 2009.
Outlines Overview Defining the Vision Through Business Requirements
FY 2006 results presentation X5 Retail Group N.V. March 1, 2007.
FOURTH QUARTER AND YEAR END 2012 RESULTS. The following is a Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995: This press.
January 21, 2004 First Fiscal Quarter Earnings Conference.
Chapter 5 Becoming the Owner of a Small Business University of Bahrain College of Business Administration MGT 239: Small Business MGT239 1.
Fourth Quarter / Full Year Earnings 2008 Kimberly Ross Chief Financial Officer March 2, 2009.
THIRD QUARTER 2012 RESULTS.  Year-over-year revenue growth of 5.5% to $32.0 million, at the high end range of guidance  Adjusted fully diluted EPS of.
The secure site rendering issue (all navigation crushed together as a list at the top of the page) is a compatibility issue with Internet Explorer only.
FOURTH QUARTER AND FULL YEAR 2013 RESULTS March 13, 2014.
Copyright © 2012, Oracle and/or its affiliates. All rights reserved. Oracle Proprietary and Confidential. 1.
This document contains certain forward looking statements with respect to the Group’s financial condition, results of operations and business, and our.
Payments in the Digital age
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Market linked debentures
Baisc Of Software Testing
Cambria Armor Dividend Strategy Cambria Armor Growth Strategy
Environmental Upgrade Finance
A Guide to Unicorn Hunting
4Q 2018 Earnings Presentation
TITLE Source: Footnotes:. TITLE Source: Footnotes:
© 2013 Sri U-Thong Limited. All rights reserved
Presentation transcript:

StormingForce.com Motion

StormingForce.com StormingForce’s technology is significantly increasing productivity and quality of manual repetitive tasks or tasks requiring exact instructions as well as reducing the cost and time needed for their completion.

Overview many manual activities are very difficult or very expensive to automate It is effective to automate approximately only 30 % of business processes by existing methods Up to 70% of business processes are possible targets for cost reduction!

What makes processes inefficient? Lack of information Missing information Incorrect information Outdated information The information is a key factor!

What’s the problem? Do you really need a problem to justify Better performance? Increased productivity? Higher profit?

Good book says we need a problem!

Currently the information flows in many different ways… Huston, We have a problem!

What’s the problem? Is any the most up to date information easily and instantly accessible to all participants? How much time is wasted by looking for some information? How much time is wasted by following wrong instructions? Are tasks results recorded? Is the information flow recorded? If some problem occurs is its solution recorded for further reference? Who is responsible for what happened? Is the report real? How old are these numbers?

Current information flow solutions Fixed Solutions (Bespoke applications) Too expensive and nonflexible Flexible large systems (Oracle E-Business Suite) Implemented and tailored by professional programmers who tend to fail in understanding particular business processes. Any change of business process requires an expensive update

Current information flow solutions In the end the business process owner is satisfied by neither of the two solutions!

StormingForce.com solution Radically changes the way information management systems are used Delivers scaleable, user-friendly Motion technology Provides results that are far more targeted and inexpensive than those obtained today Puts the definition of projects in the hands of project owners – not necessarily IT experts automates the business processes Significantly reduces the cost of repeated processes.

Motion technology Motion engine helps to formally design processes, defines their steps and requirements monitors their execution gathers all documentation, coordinates its storage and distribution monitors and reminds about the deadlines and completion allows a data exchange with other systems and applications The User Interface supported by all major web browsers. user friendly and intuitive - no special training required. Customized access System Architecture fault-tolerant low specification hardware

Motion approach (example) Project details Localization testing of mobile phones 100 people 24 languages 9000 test cases (27000 A4 pages) 9 months Motion approach ( savings against “standard solution”) finished 2 months ahead of scheduler (usually finished 3 months after!) Additional monthly saving of €135k Instant reports Very low set up cost Low maintenance

Motion family StormingForce.com offers different versions of Motion engine. Motion ™ Work flow module The basic version and the main module of other versions. PROM ™ Project Management The additional but also standalone module. PROMOTION ™ the full version with process and project management MOTION Academic ™ version supporting Questions & Answers projects HELIPORT ™ Internet help portal ONECLICK ™ Link and Information web portal

Industry Overview €(000) SAP (all segments) 2,430,717 (SAP annual report 2005) ORACLE (all segments) 2,832,006 Mercury Interactive (HP) (testing) 685 (annual report 2004) Motion unique technology won’t compete directly with business systems currently on the market because it covers different areas of business processes and will be able to interact with these system.

Motion – Tasks

Motion – Monitoring

Motion – Report - Users

Motion - Case

Disclaimer THE INFORMATION CONTAINED IN THIS CONFIDENTIAL BUSINESS PLAN (THE "BUSINESS PLAN") IS CONFIDENTIAL. BY ACCEPTING THIS BUSINESS PLAN, THE RECIPIENT AGREES TO KEEP CONFIDENTIAL ALL INFORMATION CONTAINED HEREIN. THE STATEMENTS 1N THIS BUSINESS PLAN ARE MADE AS OF THE DATE HEREOF AND ARE SUBJECT TO CHANGE, COMPLETION OR AMENDMENT WITHOUT NOTICE. THE DELIVERY OF THIS BUSINESS PLAN DOES NOT CREATE UNDER ANY CIRCUMSTANCES ANY IMPLICATION THAT THERE HAS BEEN NO CHANGE IN THE AFFAIRS OF THE COMPANY SINCE THE DATE HEREOF. THIS BUSINESS PLAN DOES NOT CONSTITUTE AN OFFER TO SELL OR A SOLICITATION OF AN OFFER TO BUY ANY SECURITIES OF THE COMPANY. THIS BUSINESS PLAN CONTAINS CERTAIN "FORWARD-LOOKING STATEMENTS". THESE FORWARD-LOOKING STATEMENTS RELATE TO THE PLANS, OBJECTIVES AND EXPECTATIONS OF THE COMPANY FOR FUTURE OPERATIONS. THESE STATEMENTS ARE STATEMENTS OTHER THAN HISTORICAL INFORMATION OR STATEMENTS OF CURRENT CONDITION, RELATE TO FUTURE EVENTS, AND CAN BE IDENTIFIED BY THE USE OF TERMS SUCH AS "MAY," "WILL," "SHOULD," "EXPECTS," "PLANS," "ANTICIPATES," "BELIEVES," "ESTIMATES," "PREDICTS," "POTENTIAL," "CONTINUE," THE NEGATIVE OF SUCH TERMS OR OTHER COMPARABLE TERMINOLOGY OR BY THE DISCUSSION OF STRATEGY. FORWARD-LOOKING STATEMENTS ARE SPECULATIVE AND UNCERTAIN AND NOT BASED ON HISTORICAL FACTS. BECAUSE FORWARD-LOOKING STATEMENTS INVOLVE RISKS AND UNCERTAINTIES, THERE ARE IMPORTANT FACTORS THAT COULD CAUSE ACTUAL RESULTS TO DIFFER MATERIALLY FROM THOSE EXPRESSED OR IMPLIED BY THESE FORWARD-LOOKING STATEMENTS. ALTHOUGH WE BELIEVE THAT THE EXPECTATIONS REFLECTED.IN THE FORWARD-LOOKING STATEMENTS ARE REASONABLE, WE CANNOT GUARANTEE FUTURE RESULTS, LEVELS OF ACTIVITY, PERFORMANCE, OR ACHIEVEMENTS. MOREOVER, NEITHER WE NOR ANY OTHER PERSON ASSUMES RESPONSIBILITY FOR THE ACCURACY AND COMPLETENESS OF SUCH STATEMENTS. WE ARE UNDER NO DUTY TO UPDATE ANY OF THE FORWARD-LOOKING STATEMENTS AFTER THE DATE OF THIS BUSINESS PLAN OR TO CONFORM SUCH STATEMENTS TO ACTUAL RESULTS. THIS BUSINESS PLAN CONTAINS MARKET DATA RELATED TO THE INTERNET GENERALLY AND OUR INDUSTRY SEGMENT SPECIFICALLY. THIS DATA WAS DERIVED, IN PART, FROM REPORTS GENERATED BY THIRD PARTY RESEARCH FIRMS. IN PREPARING THESE REPORTS, THE RESEARCH FIRMS ASSUMED CERTAIN EVENTS, TRENDS AND ACTIVITIES WILL OCCUR OR CONTINUE AND THESE FIRMS PROJECT INFORMATION BASED, IN PART, ON THOSE ASSUMPTIONS. IF THE MARKET RESEARCH FIRMS ARE WRONG ABOUT ANY OF THEIR ASSUMPTIONS, THEN THESE PROJECTIONS MAY ALSO BE WRONG. ALTHOUGH WE BELIEVE THAT THE EXPECTATIONS REFLECTED.IN THE FORWARD-LOOKING STATEMENTS ARE REASONABLE, WE CANNOT GUARANTEE FUTURE RESULTS, LEVELS OF ACTIVITY, PERFORMANCE, OR ACHIEVEMENTS. MOREOVER, NEITHER WE NOR ANY OTHER PERSON ASSUMES RESPONSIBILITY FOR THE ACCURACY AND COMPLETENESS OF SUCH STATEMENTS. WE ARE UNDER NO DUTY TO UPDATE ANY OF THE FORWARD-LOOKING STATEMENTS AFTER THE DATE OF THIS BUSINESS PLAN OR TO CONFORM SUCH STATEMENTS TO ACTUAL RESULTS. THIS BUSINESS PLAN CONTAINS MARKET DATA RELATED TO THE INTERNET GENERALLY AND OUR INDUSTRY SEGMENT SPECIFICALLY. THIS DATA WAS DERIVED, IN PART, FROM REPORTS GENERATED BY THIRD PARTY RESEARCH FIRMS. IN PREPARING THESE REPORTS, THE RESEARCH FIRMS ASSUMED CERTAIN EVENTS, TRENDS AND ACTIVITIES WILL OCCUR OR CONTINUE AND THESE FIRMS PROJECT INFORMATION BASED, IN PART, ON THOSE ASSUMPTIONS. IF TIHE MARKET RESEARCH FIRMS ARE WRONG ABOUT ANY OF THEIR ASSUMPTIONS, THEN THESE PROJECTIONS MAY ALSO BE WRONG.