E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 1 Low Power RF Tests (3) in S1-G.

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
Advertisements

of LFD Compensation Study S1 Global Cryomodule
Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
Capture Cavity 2 Update Tim Koeth April 3 rd Testing at 4.5K.
Shuichi Noguchi, KEK6-th ILC School, November Auxiliary Components  Input Power Coupler  HOM Dumping Coupler  Frequency Tuner  He Jacket  Magnetic.
1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
TILC09 AAP Review Lutz Lilje Global Design Effort 1 Cavity Gradient R&D.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 1 Cavity string assembly at KEK for S1-Global Eiji Kako (KEK, Japan)
Global Design Effort - CFS 1 DRAFT CFS Global Meeting 29 July 2009 CONVENTIONAL FACILITIES AND SITING GROUP : Safety documents Safety documents 3d modeling.
Cold Tuner test overview S1-Global at KEK 5-9 July 2010.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 1.
E.Kako (KEK) 2009.Dec. 26 1 S1-Global Cryomodule Overview No connection No beam tube No gate-valve Closed by Blind Flange Gate-valve Pumping system Pumping.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
ALCPG11 1 Comparison of Tuner Performance in S1-G Cryomodule Rocco Paparella, on behalf of S1-Global team.
Longitudinal HOM power estimations for pulsed beams.rev W. Weingarten 31 May 20101SPL Cavity WG Meeting.
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)
GDE 4/Mar/20081 Lorentz Detuning Calculation for the transient response of the resonant cavity Introduction “Two modes” model Method of the.
2014/3/25TTC Meeting Beam Operation Experience at Quantum Beam Project in STF Kirk.
20 October 2010 – C.Pagani IWLC S1-Global Tuner Performance Study Carlo Pagani, on behalf of INFN Milan team.
E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi,
Detail plan of S1-Global H. Hayano (KEK),
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
Warren Schappert Yuriy Pischalnikov FNAL SRF2011, Chicago.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
SRF Cavities Resonance Control FNAL experience Presented by Yuriy Pischalnikov for Resonance Control Group Fermilab- Los Alamos MaRIE Project Meeting March.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
Shuichi Noguchi, KEKTTC Meeting at IHEP Beijin, Slide Jack Tuner.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
SRF Cavities Resonance Control. CW mode of operation (FNAL’s experience). Yu. Pischalnikov W. Schappert FNAL TTC CW SRF Meeting, Cornell University, 12June,
N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Task 5.1 BPM-HOM 4 th Quarter (Apr.-Sep. 2010) Activity this period Participation to.
S1G Experiment Schedule Plan
HOM-BPM study in STF for cavity miss-alignment detection
ILC10 Beijing Global Design Effort
Yuriy Pischalnikov Warren Schappert (FNAL)
SCRF 21-25/Apr/2008 Measurement & Calculation of the Lorentz Detuning for the transient response of the resonant cavity Introduction “Two.
S1-G for TTC meeting Global Design Effort
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Performance of Slide-jack tuner in STF-2 Cryomodule
Cavity resonance control
2. SCRF General Preparation for the AD&I Preparation for AAP Review
WG 3 : Cavity Data Banks 9:00 ~ 10:30 Session-I 4 Talks
Vertical Test System and T-mapping/X-ray-mapping at KEK-STF
Performance of Large Grain TESLA cavities
Construction and First Coo-down Test of cERL Injector Cryomodule
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
0L04 Microphonics Test R100 in SL vs 0L04 slot 0L04 trip investigation
TTC meeting at Milano, 2011' Feb. .28
TTC meeting, Milano Global Design Effort
Cavity Degradation Experience at S1-Global
Cavity & Cavity Integration; recent KEK activities
Presentation transcript:

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 1 Low Power RF Tests (3) in S1-G

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 2 Low power rf tests in S1-G Cryomodule-A&C. Damping of mechanical vibration modes (1 & 5 pulse, 5 Hz). Mechanical vibration (cw mode meas.). FFT analysis of mechanical vibration. Cross-talk of vibration between two cavities Measurement time at 2 K ; Tue. – Fri. for 4 days 13:00 ~ 19:00 for 6 h 24 h per week Cryomodule-A&C. HOM external Q

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 3 Mechanical Vibration Modes (Cryo-A) A1/MHI-05A2/MHI-06 A3/MHI-07A4/MHI-09 Pt  Vpiezo 10 o /div. 500V 250V 5 Hz 250 Hz 5 pulse 250 Hz 5 pulse 250 Hz 5 pulse 250 Hz 5 pulse Pt  Vpiezo

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 4 Mechanical Vibration Modes (Cryo-C) C1/AES004C2/ACC011 C3/Z108C4/Z109 Pt  Vpiezo 10 o /div. 25 o /div. 10 o /div. 25V 5 Hz 250 Hz 5 pulse 250 Hz 5 pulse 250 Hz 5 pulse 250 Hz 5 pulse Pt  Vpiezo

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 5 Mechanical Vibration Modes (Cryo-A&C) CW mode measurementSingle-pulse mode measurement C4/Z109: Vpiezo = +40V, 1kHz A2/MHI-06: Vpiezo = +200V, 1kHz 5 o /div. FFT Analysis FFT Analysis 100ms/div. 4ms/div. Vpiezo = +100V, 100Hz, cw A4/MHI-09: Pt   Frequency sweep, manually

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 6 Mechanical Vibration Modes (Cryo-A) Vpiezo = +200V (CW) 536Hz 351Hz 246Hz Vpiezo = +200V, 1 kHz (1 pulse) 227Hz 318Hz521Hz 378Hz 535Hz 516Hz 323Hz 225Hz A1/MHI-05 A2/MHI-06

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 7 Mechanical Vibration Modes (Cryo-A) Vpiezo = +200V (CW) 206Hz 298Hz Vpiezo = +200V, 1 kHz (1 pulse) 571Hz 382Hz 330Hz 326Hz 459Hz 561Hz 194Hz 297Hz A3/MHI-07 A4/MHI-09

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 8 Mechanical Vibration Modes (Cryo-C) Vpiezo = +15V (CW) 201Hz 354Hz 504Hz 345Hz 168Hz126Hz 529Hz Vpiezo = +40V, 1 kHz (1 pulse) 345Hz 179Hz 509Hz 356Hz 204Hz C1/AES004 C2/ACC011

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 9 Mechanical Vibration Modes (Cryo-C) Vpiezo = +15V (CW) 320Hz 261Hz 246Hz 332Hz Vpiezo = +40V, 1 kHz (1 pulse) 260Hz 322Hz 448Hz 245, 252Hz 313Hz 436Hz C3/Z108 C4/Z109

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 10 Mechanical Vibration by Hammer C1/AES004 (FNAL)C3/Z108 (DESY) A1/MHI-05 (KEK)A4/MHI-09 (KEK) 5 o /div. 10 o /div. 100ms/div.

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 11 Mechanical Vibration by Hammer C1/AES004 (FNAL)C3/Z108 (DESY) A1/MHI-05 (KEK)A4/MHI-09 (KEK) 194Hz 250Hz 127Hz 112Hz 298Hz

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 12 Propagation of Mechanical Vibration Pt  Vpiezo Pt  Vpiezo  A1/A2 (KEK) C3/C4 (DESY) C1/C2 (FNAL) A3/A4 (KEK) 10 o /div. 250Hz, 40V 200Hz, 40V 330Hz, 400V 535Hz, 400V A1 A2 C3C1 A3 A4 C2C4 100ms/div. 1 o /div.

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 13 Microphonic vibration A1/MHI-05 (KEK)A3/MHI-07 (KEK) C1/AES004 (FNAL)C3/Z108 (DESY) 222Hz326Hz 25Hz252Hz

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 14 TESLA-like Cavity (KEK) STF-1 experiment Analysis of Mechanical Vibration Modes

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 15