Forsys Metals Investor Presentation Q1 2015 Marcel Hilmer, CEO TSX: FSY | FSE: F2T | NSX: FSY.

Slides:



Advertisements
Similar presentations
Growing the Hope Brook Gold Project May 2013 TSX-V: CT OTCQX: CTIIF FRANKFURT: CY4 Member of Forbes & Manhattan Group of Companies.
Advertisements

2008 Second Quarter Results TSX: LUN NYSE: LMC OMX: LUMI.
1 China Petroleum & Chemical Corporation Q Results Announcement April 29, 2003.
Subsidised Studies – BOOTs and All Mark Berger – Director E+PC Engineering & Projects Company Limited South Africa Canada – South Africa Chamber of Business.
China Petroleum & Chemical Corporation Q1-Q Results Announcement 28 October 2005.
February 4, 2008, Atlas Copco Group Q4 Results February 4, 2008.
Atlas Copco Group Q4 Results February 2, Q4 - highlights  Order growth continued  Record operating profit –All business areas above 20% operating.
K ANCHANSOBHA F INANCE P VT. L TD. C ORPORATE P ROFILE A C OMPLETE F INANCIAL S OLUTION
Benz Capital Corp. (TSX.V – BZ) San Javier Copper Project Sonora, Mexico Jun, 2014 Acquire ǀ Execute ǀ Operate
October Disclaimer The views expressed here contain information derived from publicly available sources and have not been independently verified.
The Business Plan.
Mining in Latin America Ralph Lutes, Vice President, Asia, Executive Director & General Manager, Teck China October 22, 2014.
May 13, TSX-V:OCO, Frankfurt:OR6, US OTC: ORRCF.
1 NYSE MKT: REE & TSX: RES Bear Lodge Critical Rare Earth Project Technology Metals Summit – March 2013 A Year of Dramatic Change.
Brendan Flood Executive Chairman The World Leaders in Recruitment Conference London – September 24 th 2014.
April 16, TSX: RE Last Close: $1.20. About Company Rock Energy Inc. is a junior oil and gas (60% Oil & 40% Gas) company currently producing more.
1. Investor Presentation April Disclaimer DISCLAIMER: This presentation contains forward-looking statements including but not limited to comments.
© 2014 Focused on a World Class Discovery. © 2014 Forward Looking Information This presentation contains forward-looking statements, which represent the.
Understanding and Valuating Exploration Companies 24 May 2007 Shane Hunter.
4.7 Billion Rand Investment In South Africa Driefontein 9 Sub-vertical Shaft Depth Extension and Kloof Extension Area Decline Shaft System 7 September.
TSX: SGR OTCQX: SGRCF 1 SAN GOLD CORPORATION CORPORATE PRESENTATION TSX: SGR OTCQX: SGRCF JUNE 2013.
UK – ANGOLA INVESTMENT FORUM 2012 LONDON, 24 TH OF MAY 2012.
Redstar Gold Corp December 15, TSX-V:RGC. About Company Redstar is a Joint Venture model company designed to give shareholders multiple opportunities.
Wesizwe Platinum Limited “Wesizwe Platinum – a “first of its kind” Chinese/South African Platinum Mining Partnership” A Presentation at the African Mining.
NEVADO RESOURCES CORPORATION (TSX-V:VDO) Strategic Metals in Northern Quebec August 2013.
SLIDE 1 British Columbia. SLIDE 2 Economy SLIDE 3 Real GDP annual per cent change BC growth outperforms Canada and the US Forecast Sources: Statistics.
Investor Presentation
1.Excellent Infrastructure (Skilled Labour, Power, Rail & Port) A global resource focused merchant bank Corporate Head Office:
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
SMH Capital Houston, TX February 25, Forward Looking Statement The statements made by representatives of Natural Resource Partners L.P. (“NRP”)
Hale & Tempest Trends in the Pharmaceutical Industry and the Potential Impact on Future Innovation and Access to Medicines Dr. Brian W Tempest
A Capital Opportunity A Global Market for Companies.
CAHF CEO Conference May 31, Genesis HealthCare Overview “Go Private” Transaction Overview OPCO/PROPCO – REIT Transaction Questions and Answers Today’s.
Copyright 2009 Thoughts From a CPC Founder Mark Lawrence P.Eng.,CFA New York - June 5, 2012 Copyright 2012 Invigorating Company Growth ™
1 C u r r e n t D e v e l o p m e n t s MINING Surviving the Global Financial Crisis in the Mining Sector Session 3 – Understanding the Key Indicators.
Shea & Company, LLC Annual Enterprise Software Market Review Boylston StreetMichael H.M. Shea Floor 11Managing Director Boston, Massachusetts.
TSX-V: OCO Frankfurt: OR6
Corriente Resources Inc. Copper Growth Story Corriente Resources Inc. Copper Growth Story November 2006.
Investor Presentation. 2 Cautionary Statement This presentation contains “forward-looking information” which may include, but is not limited to, statements.
1 Presented By: Neil McMillan President & CEO Q1 Financials May 14, 2012.
Presentation to MineAfrica’s Investing In Africa Seminar March 4, 2008 By Don Willoughby, VP Corporate Development All financial.
NIUMINCO GROUP LIMITED. Important Information This presentation is not a prospectus nor an offer of securities for subscription or sale in any jurisdiction.
Natural Resources Reporting Workshop Dublin Castle, May 15, 2009
PT Mutuallink Indonesia. Founded by highly reputable professionals and highly skilled individuals with a solid local knowledge and international networks.
Calgary  Toronto  Moscow  Almaty  Caracas  Bogotá  Rio de Janeiro Mining in South Africa: A Canadian Assessment Co-Presented by:Marvin Singer, Partner,
v2 Climate Change Disclosure for Canadian Public Companies Barbara Hendrickson Corporate Reporting: Climate Change & Related Environmental Disclosures.
Natural Resource Partners L.P. A Successful Growth Story UBS Investor Meetings Las Vegas, Nevada September 18, 2007.
0  Introduction for Listing on AIM.
CARBON CONSCIOUS LTD (CCF) : COMPANY UPDATE, MAY 2012.
2012 NORTHEAST BRITISH COLOMBIA COMMUNITY COAL AND ENERGY FORUM Ann Marie Hann President, Coal Association of Canada OCTOBER 11, 2012.
St Barbara Mines Limited Tokyo Presentation Eduard Eshuys Managing Director & CEO 26 September 2004.
Gold Market Update Improving Fundamentals N EWMONT January 2002.
Gunnar Tryggvason Acting CEO. HKI objectives Background & owners HKI Targets
The Petroleum Oil and Gas Corporation of South Africa (Pty) Ltd Reg. No. 1970/008130/07 Annual Performance Review Mr Sipho Mkhize President & CEO Presentation.
Investor Presentation November Forward Looking Statements This presentation may contain forward-looking statements which are subject to a number.
Sian Gold Project – Ghana BRIEF SUMMARY June 2009.
Public-Private Partnership to Advance the Recovery and Use of Methane as a Clean Energy Source.
CERVUS LP nd Quarter Update. Outstanding units: 9,346,759 Unit price: $7.75 Market cap: $72 million Monthly distribution of: $0.09 Current annual.
Floris Waller - CFO and Member Executive Board Business Services Conference London June 26 th 2007 Corporate Express Overview.
Private Placements and Venture Capital Chapter 28 Tools & Techniques of Investment Planning Copyright 2007, The National Underwriter Company1 What is it?
Click to edit Master title style September Title Slide Annual Meeting of Shareholders RIFCO Inc.
Invigorating Company Growth ™ Thoughts From a CPC Founder
First Quarter 2014 Earnings Review
Developing a Canadian Gold Deposit
Macquarie Emerging Leaders Conference 2002
EV Battery Metals Nickel Copper Cobalt Lithium
Renewable Energy Solutions For A Growing Africa
……. Date. Disclaimer… Randgold reports its mineral resources and mineral reserves in accordance with the JORC 2012 code. As such numbers.
Gleichen Resources TSXV: GRL October 7th, 2009.
HERITAGE DIAMOND CONCESSION Marange
Presentation transcript:

Forsys Metals Investor Presentation Q Marcel Hilmer, CEO TSX: FSY | FSE: F2T | NSX: FSY

FORWARD-LOOKING STATEMENTS Investor Presentation | Q | Page 2 Some of the statements contained in the following material are forward looking statements and not statement of facts. Such statements are based on the current beliefs of management, as well as assumptions based on management information currently available. Forward looking statements are subject to various risks, uncertainties and other factors that could cause actual results to differ materially from expected results. Readers must rely on their own evaluation of these uncertainties. This presentation uses the terms, “Measured Resources,” “Indicated Resources” and “Inferred Resources.” The Company advises investors that although these classification terms are recognized and required by Canadian regulations (National Instrument —Standards of Disclosure for Mineral Projects “NI43-101”), they are not recognized by the U.S. Securities and Exchange Commission. Investors are also cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted to Mineral Reserves. Investors are also cautioned that “Inferred Resources” have a great amount of uncertainty to their existence and economic feasibility. Additional information identifying the Company’s risks and uncertainties is contained in its filings available at NI and Qualified Persons Mr. Martin Hirsch, M.Sc in Geology and a member of the British IMMM, Chief Geologist for Forsys Metals Corp., is the designated Qualified Person responsible for the Company’s exploration programs. He is familiar with the methods for Quality Assurance and Quality Control specifically applicable to uranium. Mr Hirsch has sufficient experience that is relevant to the style and mineralization, type of deposit and the use of radiometrics in resource estimates as well as to the activity he is undertaking to qualify as a Qualified Person under NI Mr. Dag Kullmann, M.Sc. Mining Engineering from the University of Alberta, a Fellow of the Southern African Institute of Mining and Metallurgy (SAIMM), Engineering Manager for Forsys, is the designated QP responsible for the reporting of Mineral Reserves. Mr. Kullmann has sufficient experience in the assessment and application of modifying factors required for the determination of reserves for open pit operations to qualify as a QP under NI

Advancing Africa’s most compelling uranium project Investor Presentation | Q | Page 3 Namibia

Norasa: A unique project and opportunity 79Mlbs of U Reserves at 202ppm 103Mlbs of M&I Resources + 22Mlbs of Inferred of Resources Long life mine with targeted annual production of 5.2Mlbs US$40M in exploration and development expenditure to date US$410M NPV post-tax 100% of off-take available 11.2MTPA plant with low Capex $34.76/lb Opex for first 5 years 6 th largest producer in world once in production in 2016 Namibia is the 5th largest producer of uranium. Fair tax / mining codes in a pro-business, stable democracy Located 35km from Rio’s Rossing mine & 90ms by sealed road to port Infrastructure for roads, water and power in place or arranged Relatively low environmental impact and favourable topography. Feasibility Study on schedule for release in Q Project financing in Q2/ Construction completed in 2016 Large U Project Strong Technical Report Economics Ideal Location and Infrastructure Upcoming Milestones Investor Presentation | Q | Page 4

Significant upside potential Investor Presentation | Q | Page 5 CAPITAL STRUCTURE Forsys Metals Shareholder Base Cash** $3.1M Share Price* $ months range $0.15 -$0.60 Avg. daily volume 3 Mths 24 K Market Cap (diluted) CAD $22 M Shares Outstanding* M Options* 2.5 M Fully Diluted* M * As at January 14, 2015**As of September 30, % Institutional 1% Insiders 33% Retail

URANIUM RECOVERY UNDERWAY 546 New reactors to be built or under construction * ChinaIndiaRussiaU.S.ASouth KoreaWorld Total* Under Construction Planned Proposed Total Operable Growth led by emerging countries without domestic supply Investor Presentation | Q | Page 6 *WNA 1 January 2015

URANIUM SUPPLY CRISIS BREWING Annual U 3 O 8 demand 180M lbs but current production supply 150M lbs Gap filled by declining secondary sources, e.g. concluded HEU agreement between U.S.A and Russia Strong fundamentals support $65 - $70/lb long-term analyst price forecasts * Graph Dundee Capital Markets – Q Investor Presentation | Q | Page 7

Long-term spot price forecast: $66/lb URANIUM POSITIVE FUNDAMENTALS Investor Presentation | Q | Page 8 Forecast trend drivers: Major global nuclear power expansion (30% growth by 2020) Japan reactor re-starts Looming supply imbalance Demand for affordable and clean electricity Global power consumption growing 4% p.a.

PROVEN URANIUM JURISDICTION Pro-business, stable democracy Fair and balanced tax code Metals: uranium, gold, diamonds, zinc, copper and lead 5 th largest global producer of uranium GDP derived from mining 11.5% Investor Presentation | Q | Page 9 NAMIBIA

35km from Rio Tinto’s Rossing Mine NORASA | IDEAL LOCATION SWAKOPMUND ARANDIS NORASA URANIUM PROJECT RIO TINTO’S ROSSING MINE PALADIN’S LANGER HEINRICH MINE Mine Sites Towns NAMIBIA N AREVA’S TREKKOPJE MINE Investor Presentation | Q | Page 10

* Total Measured & Indicated Resources and Proven and Probable Reserves estimate at cut-off of 100ppm for Valencia and 160ppm for Namibplaas – October 2013 and Q Resources include Reserves Consolidation of 3 zones: Valencia Main / Satellite Pit & Namibplaas Estimated Inferred Resource: 50Mt grading 198ppm for 22Mlbs of U 3 O 8 Open pit environment NORASA | WORLD CLASS U3O8U3O8 Reserves Total P&P: Grade: Investor Presentation | Q | Page 11 Resources Total M&I: 103 Mlbs* Grade: 197 ppm 79 Mlbs* 202 ppm

INFRASTRUCTURE: #1 IN AFRICA* Water Supply Power Supply Roads Buildings Short and medium term supply of water from Areva’s desalination plant NamWater’s own desalination plant to provide long term requirements of up to 20 million cubic metres per annum Namibia signed electricity import agreement with Mozambique in 2013 for 122MW NamPower to construct its own 800MW gas power station in co-operation with Zambian power company 26 km of new access road linking Valencia mine to highway completed in mid Some internal service roads have also been constructed Semi-permanent village will be established 8 km from process plant Investor Presentation | Q | Page 12 * Fraser Institute Report 2012/13

NORASA IN PERSPECTIVE Future Global Producer Investor Presentation | Q | Page 13 6 annual production in tonnes U 3 O 8 Data from the World Nuclear Association and Forsys NI Technical Report March 27, 2014 Top

$245m Post-tax NPV $36.43/lb Cash Costs 3 Investor Presentation | Q | Page 14 Norasa: Compelling Economics 1 Snowden, Valencia Uranium (Pty) Ltd: Addendum to June 2009 Technical Report; Project No 696 dated January Compliant NI Technical Report released on March 27, 2014 based on Q upgraded reserves estimate 3. Cash costs for the first 5 years of operation. LoM in 2010 is $37.76 and for 2014 is $ $410m Post-tax NPV $34.76/lb Cash Costs

Progress through optimization and consolidation Capital cost USD$392M Plant throughput Mtpa11.2 Production MLb/pa5.0 Cash costs - 5 Yrs - LoM $/lb$34.76 $38.20 Average grade ppm202 Recoveries %89.1 Revenue (LoM) USD$4.4B EBITDA $1.8B IRR %36.0 NPV (discount rate 8%) USD$410M * 2014 NI Technical Report released on March 27, 2014 and available for download on See also Appendix and News Release: March 27, 2014 for details Investor Presentation | Q | Page 15 NORASA | 2014 Technical Report*

Permit Summary PermitIssued ByStatus Mining Licence (ML149)Ministry of Mines and Energy Accessory WorksMinistry of Mines and Energy Environmental Clearance —Valencia VillageMinistry of Environment and Tourism Environmental ClearanceMinistry of Environment and Tourism Petroleum Consumer InstallationMinistry of Mines and Energy DesalinationMinistry of Agriculture, Water & Forestry Investor Presentation | Q | Page 16 VALENCIA ZONE | FULLY PERMITTED

NORASA PROJECT SCHEDULE Investor Presentation | Q | Page 17

SENIOR MANAGEMENT An experienced team – successfully delivering projects on time and within budget Investor Presentation | Q | Page 18 Marcel Hilmer CEO & Exec. Director 30 years of senior management experience with global public and private organizations, specifically with international mergers and acquisitions in Africa, Europe, Asia and Australia. A long standing fellow of the Institute of Chartered Accountants in Australia. Previously, with First Quantum Minerals Limited as a business development executive. Rowen Colman CFO A Chartered Accountant with over 25 years of successful senior financial management experience in various global industries and holds a Bachelor Degree in Commerce from the University of NSW, Australia. Previously, was the Development Director for a major sovereign wealth fund in the Middle East and guided the fund from start-up to a global powerhouse. Mark Frewin VP Legal Affairs & Director Was a partner at the international law firm of McCarthy Tétrault, and based in their London England office. Focuses on energy and in particular mining and metals. Has participated in numerous international mine financings including several for companies which do business in Africa. Mr. Frewin is also a director of the Company and of IC Potash.has been a director of Caledonian Consultancy Kimited since June 2013 and a director of Giyani Gold Corp. since June Dag Kullmann General Manager & Project Engineer A Mining Engineer (M.Sc. University of Alberta, Canada, 1989) with over 20 years of experience in the precious, base metals, diamonds, coal and uranium mining industry throughout Africa and within Asia and Europe. Acted as Qualified Person for several large and small mining companies for the completion of reserve reporting and listing documentation for the JSE, AIM, ASX and TSX. Martin Hirsch Chief Geologist An experienced and professionally registered Geologist with a Master’s Degree in Geology from the Johan Wolfgang-Goethe University in Frankfurt A.M, Germany. Has more than 20 years of mining industry experience in opencast mining and exploration project management in uranium and diamonds. Previously with Rio Tinto’s Rössing Uranium Mineas Chief Geologist and Areva Resources Namibia.

DIRECTORS 100+ years of experience in African mining Martin R. Rowley Independent Director & Chairman Graduated from the University of Western Australia with a Bachelor of Commerce degree in He worked as executive assistant to the Board of Directors of a large Australian public company from 1980 to He then established his own resource consulting and investment company and was involved as a shareholder, Director and Chairman of a number of Australian public resource companies before co-founding First Quantum Minerals Ltd in Since November 2013 he has been a non-executive Chairman of Galaxy Resources Limited Thomas Allen Independent Director A counsel to Norton Ross Canada LLP, an international law firm, and has extensive experience advising numerous corporations on corporate affairs, corporate governance, corporate financings and reorganizations. Paul Matysek Independent Director Served as President and Chief Executive Officer of Lithium One Inc. and Nevada Copper Corp. Has over 35 years of exploration and development experience and has been involved in raising over $200 million for various exploration and development projects since Has been CEO of Goldrock Mines Corp since November Claudio Cornini Independent Director Founder and current Executive Director of Cornhill and Harvest Ltd. (C&H). Since 2008, C&H has focused on providing small cap and larger private companies with investment, corporate finance and M&A advisory services Prior to this, between 2004 – 2008, He served as Chairman of AAA Bank in Milan, Italy and concurrently, from 2007 to early 2008, he was in charge of the Network Desk at ABN AMRO in Italy. Marcel Hilmer & Mark Frewin Details on previous management slide Investor Presentation | Q | Page 19

VALUATION AGAINST PEERS Current EV and expected sector recovery provide attractive entry point Average $0.82/lb EV/lb ($) Investor Presentation | Q | Page 20

Investor Presentation | Q | Page 21 FORSYS INVESTMENT SUMMARY  Poised to capitalize on emerging uranium sector recovery  Mining friendly jurisdiction  Forecast annual production of 5Mlbs of uranium  Updated Feasibility Study on schedule for Q1/15  Large Reserves and strong economics in a low cost environment  Advancing towards production in 2016  Fully permitted with excellent infrastructure and low Capex  Proven management with track record of creating value through successful discovery, development and production

CONTACT INFORMATION Investor Presentation | Q | Page 22 Australian Representative Office Marcel Hilmer, CEO 18 Richardson Street West Perth WA (0) Namibian Operations Dag Kullmann, General Manager 1st Floor, Makarios Centre Cottage Avenue Swakopmund +264 (0) Canadian IR and Corporate Services Joe Racanelli, VP, TMX Equicom 31 Adelaide Street East Toronto, Ontario M5C 2K ext

APPENDIX

RESOURCES & RESERVES Investor Presentation | Q | Page 24 Measured and Indicated Resources based on updated and released Estimate of Resources – 7 October Resources include Reserves. Reserves based on updated and released Estimate of Reserves – February 2014

OPEN PIT DESIGNS Investor Presentation | Q | Page 25 Namibplaas Valencia Main & Satellite Valencia pit design, isometric view with the higher grade resource blocks within the pits. Mining licence boundary shown in red. (view NNE) Namibplaas pit design, isometric view with the higher grade resource blocks within the pit. (view N)

NI Technical Report* Investor Presentation | Q | Page 26 * 2014 NI Technical Report released on March 27, 2014 and available for download on See also Appendix and News Release: March 27, 2014 for details Planned Annual Uranium Production