Session 8a. Decision Models -- Prof. Juran2 Overview Operations Simulation Models Reliability Analysis –RANK, VLOOKUP, MIN Inventory Order Quantities.

Slides:



Advertisements
Similar presentations
Introduction to LP Modeling
Advertisements

1. If the monopolist depicted in the graph produces at the profit-maximizing output, what will be the firm’s economic profit? Explain. 2. Lightly shade.
Chapter 18 If mathematical analysis is too difficult, we can try each possibility out on paper. That way we can find which alternative appears to work.
Session 9a. Decision Models -- Prof. Juran2 Overview Finance Simulation Models Forecasting –Retirement Planning –Butterfly Strategy Risk Management –Introduction.
1 COMM 301: Empirical Research in Communication Lecture 15 – Hypothesis Testing Kwan M Lee.
Slides 2c: Using Spreadsheets for Modeling - Excel Concepts (Updated 1/19/2005) There are several reasons for the popularity of spreadsheets: –Data are.
Session 8b Decision Models -- Prof. Juran.
Simulation Operations -- Prof. Juran.
Session 7a. Decision Models -- Prof. Juran2 Overview Monte Carlo Simulation –Basic concepts and history Excel Tricks –RAND(), IF, Boolean Crystal Ball.
Outline/Coverage Terms for reference Introduction
Spreadsheet Demonstration New Car Simulation. 2 New car simulation Basic problem  To simulate the profitability of a new model car over a several-year.
Engineering Economic Analysis Canadian Edition
Example 14.3 Football Production at the Pigskin Company
Spreadsheet Simulation
Spreadsheet Demonstration
Simulation II.
1 SIMULATION – PART I Introduction to Simulation and Its Application to Yield Management For this portion of the session, the learning objectives are:
Simulating Normal Random Variables Simulation can provide a great deal of information about the behavior of a random variable.
Session 7b. Decision Models -- Prof. Juran2 Example: Preventive Maintenance At the beginning of each week, a machine is in one of four conditions: 1 =
Example 11.1 Simulation with Built-In Excel Tools.
Session 10b. Decision Models -- Prof. Juran2 Overview Marketing Simulation Models New Product Development Decision –Uncertainty about competitor behavior.
Copyright © 2005 Brooks/Cole, a division of Thomson Learning, Inc. 8.1 Chapter 8 Continuous Probability Distributions.
CHAPTER 6 Statistical Analysis of Experimental Data
Lecture Slides Elementary Statistics Twelfth Edition
Data Analysis Statistics. Inferential statistics.
Nonlinear Pricing Models
SPSS Statistical Package for the Social Sciences is a statistical analysis and data management software package. SPSS can take data from almost any type.
Example 14.1 Introduction to LP Modeling. 14.1a14.1a | 14.2 | Linear Programming n Linear programming (LP) is a method of spreadsheet optimization.
Continuous Probability Distributions A continuous random variable can assume any value in an interval on the real line or in a collection of intervals.
Simulation.
EXAMPLE: 3.1 ASSEMBLING AND TESTING COMPUTERS
© 2008 McGraw-Hill Higher Education The Statistical Imagination Chapter 9. Hypothesis Testing I: The Six Steps of Statistical Inference.
Example 12.6 A Financial Planning Model | 12.2 | 12.3 | 12.4 | 12.5 | 12.7 |12.8 | 12.9 | | | | | | |
Example 16.1 Ordering calendars at Walton Bookstore
1 Statistical Analysis - Graphical Techniques Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7370/5370 STAT 5340 : PROBABILITY AND.
Spreadsheets in Finance and Forecasting Presentation 8: Problem Solving.
Spreadsheet Modeling of Linear Programming (LP). Spreadsheet Modeling There is no exact one way to develop an LP spreadsheet model. We will work through.
Copyright © 2010, 2007, 2004 Pearson Education, Inc. Review and Preview This chapter combines the methods of descriptive statistics presented in.
Example 5.8 Non-logistics Network Models | 5.2 | 5.3 | 5.4 | 5.5 | 5.6 | 5.7 | 5.9 | 5.10 | 5.10a a Background Information.
SIMULATION USING CRYSTAL BALL. WHAT CRYSTAL BALL DOES? Crystal ball extends the forecasting capabilities of spreadsheet model and provide the information.
We can make Product1 and Product2. There are 3 resources; Resource1, Resource2, Resource3. Product1 needs one hour of Resource1, nothing of Resource2,
Example 2.5 Decisions Involving the Time Value of Money.
Stats 95.
Chapter 6 The Standard Deviation as a Ruler and the Normal Model.
Example 2.3 An Ordering Decision with Quantity Discounts.
קורס סימולציה ד " ר אמנון גונן 1 ההתפלגויות ב ARENA Summary of Arena’s Probability Distributions Distribution Parameter Values Beta BETA Beta, Alpha Continuous.
IE241: Introduction to Hypothesis Testing. We said before that estimation of parameters was one of the two major areas of statistics. Now let’s turn to.
Crystal Ball: Risk Analysis  Risk analysis uses analytical decision models or Monte Carlo simulation models based on the probability distributions to.
Continuous Probability Distributions. A continuous random variable can assume any value in an interval on the real line or in a collection of intervals.
40S Applied Math Mr. Knight – Killarney School Slide 1 Unit: Statistics Lesson: ST-5 The Binomial Distribution The Binomial Distribution Learning Outcome.
Computer Simulation. The Essence of Computer Simulation A stochastic system is a system that evolves over time according to one or more probability distributions.
Chapter 8 Continuous Probability Distributions Sir Naseer Shahzada.
DECISION MODELING WITH MICROSOFT EXCEL Chapter 14 Copyright 2001 Prentice Hall Publishers and Ardith E. Baker Part 3 andand PERT CPM.
Advanced Simulation Methods. © The McGraw-Hill Companies, Inc., 2004 Operations -- Prof. Juran2 Overview Advanced Simulation Applications Beta Distribution.
Chapter 2: Frequency Distributions. Frequency Distributions After collecting data, the first task for a researcher is to organize and simplify the data.
Introduction to Spreadsheets and Microsoft Excel FSE 200.
Chapter 5 Probability Distributions 5-1 Overview 5-2 Random Variables 5-3 Binomial Probability Distributions 5-4 Mean, Variance and Standard Deviation.
1 Statistical Analysis - Graphical Techniques Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7370/5370 STAT 5340 : PROBABILITY AND.
Statistical Fundamentals: Using Microsoft Excel for Univariate and Bivariate Analysis Alfred P. Rovai Descriptive Statistics – Measures of Relative Position.
Chapter 8: Estimating with Confidence
CHAPTER 11 Mean and Standard Deviation. BOX AND WHISKER PLOTS  Worksheet on Interpreting and making a box and whisker plot in the calculator.
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Copyright © 2009 Pearson Education, Inc t LEARNING GOAL Understand when it is appropriate to use the Student t distribution rather than the normal.
Probability and Statistics
Hypotheses and test procedures
Chapter 9: Inferences Involving One Population
Continuous Distributions
Introduction to Crystal Ball (Part I)
Presentation transcript:

Session 8a

Decision Models -- Prof. Juran2 Overview Operations Simulation Models Reliability Analysis –RANK, VLOOKUP, MIN Inventory Order Quantities –Single Product (MAX) –Multiple Products with Correlated Demand Project management –PERT Analysis

Decision Models -- Prof. Juran3 Example 1: Reliability Consider a device that requires two batteries to function. If either of these batteries dies, the device will not work. Currently there are two brand new batteries in the device, and there are three extra brand new batteries. Each battery, once it is placed in the device, lasts a random amount of time that is lognormally distributed with mean 20 hours and standard deviation 5 hours. When any of the batteries in the device dies, it is immediately replaced by an extra (if an extra is still available). Simulate the time the device can last with the batteries currently available. What is the estimated probability that the device will last longer than 50 hours?

Decision Models -- Prof. Juran4

5

6 B3:B4 contain the parameters for the random lifetimes of batteries. D1:I6 keep track of all five batteries, including when they start (and in what order) and when they fail (and in what order). Note that the random variables are G2:G6, which will be simulated by Crystal Ball. These are the “lifetimes” of the batteries.

Decision Models -- Prof. Juran7 We calculate the fail time of a battery by using the formula: Fail time = Start time + Lifetime

Decision Models -- Prof. Juran8 For example, in this realization, Batteries A and B both start at time 0. Battery B fails at time 26.41, and is replaced by Battery C (see row 10). Battery A fails at time and is replaced by Battery D (row 11). Battery D fails at time and is replaced by E (D started at time and lasted 22.52; see row 12). Finally, Battery C fails at time (it started at time and lasted 25.67; see row 13). At this point the device fails, having lasted hours.

Decision Models -- Prof. Juran9

10

Decision Models -- Prof. Juran11

Decision Models -- Prof. Juran12

Decision Models -- Prof. Juran13

Decision Models -- Prof. Juran14

Decision Models -- Prof. Juran15 Using the frequency chart’s “certainty” feature, we can drag the lower “grabber” to a point where the left window reads 50 (or Crystal Ball will allow you simply to type 50 into the left window). The certainty window indicates the estimated area under the curve in the blue shaded region. In this case, we estimate a 89.89% probability that the device will fail before 50 hours.

Decision Models -- Prof. Juran16 Example 2: Blockbuster Publishers At present, 2000 copies of the book are in stock, and Blockbuster must determine how many copies of the book to print for the next year. Demand has a triangular distribution with parameters 4000, 6000, and Each copy sold during brings the publisher a revenue of $35. Any copies left at the end of the year can be sold for $5. The cost of printing the book is $50,000 plus $15 per book printed.

Decision Models -- Prof. Juran17

Decision Models -- Prof. Juran18 Somewhat arbitrarily, we have decided to consider possible order quantities of 0, 1000, 2000, 3000, 4000, 5000, 6000, and 7000 (B1:I1). For each possible order quantity, we have a fairly simple income statement-like analysis in rows 2 through 9. All columns get their demand number from B3. (Note that the demand level in B3 will be a random variable later.) The lower part of the spreadsheet (rows 11 through 16) contains the basic parameters of the problem.

Decision Models -- Prof. Juran19

Decision Models -- Prof. Juran20

Decision Models -- Prof. Juran21 We run for 1000 trials, and then click on the extract data button.

Decision Models -- Prof. Juran22

Decision Models -- Prof. Juran23 Does your answer change if 4000 copies are currently in stock?

Decision Models -- Prof. Juran24

Decision Models -- Prof. Juran25 Example 3: Walton Bookstore Consider two competing products sold by a company. Sales of either product tend to take away sales from the other product. That is, demands for the two products are negatively correlated. The company first places an order for each product. Then during a period of time, there is demand D 1 for product 1 and demand D 2 for product 2. These demands are normally distributed with means 1000 and 1200 and standard deviations 250 and 350. The correlation between D 1 and D 2 is , where  is a negative number between –1 and 0.

Decision Models -- Prof. Juran26 The unit cost of each product is $7.50, the unit price for each product is $10, and the unit refund for any unit of either product not sold is $2.50. The company must decide how many units of each product to order. Use simulation to help the company by experimenting with different order quantities. Try this for  = -0.3,  = -0.5, and  = What recommendations can you give about the “best” order quantities as the demands become more highly correlated (in a negative direction)?

Decision Models -- Prof. Juran27 We have laid out (somewhat arbitrarily) 16 different combinations of order quantities for the two products (B2:Q3). Each of the columns from B to Q represents a model of one order quantity strategy.

Decision Models -- Prof. Juran28

Decision Models -- Prof. Juran29 The random variables (demand D 1 for product 1 and demand D 2 for product 2) appear in rows 3 and 4. Note that the demand stream for all strategies is the same, because each value in rows 3 and 4 refers to B4:B5. The correlation between D 1 and D 2 (  ) appears in I18. Here are the two assumption cells:

Decision Models -- Prof. Juran30 For more than a few correlated green cells, it’s more efficient to use the matrix view. You can specify bivariate correlations in the Define Assumption window.

Decision Models -- Prof. Juran31 Click on “correlate” to enter the correlation information.

Decision Models -- Prof. Juran32 Switch to “list” view (not the default matrix view). Enter coefficient by typing, cell reference, or the slider.

Decision Models -- Prof. Juran33

Decision Models -- Prof. Juran34

Decision Models -- Prof. Juran35

Decision Models -- Prof. Juran36

Decision Models -- Prof. Juran37

Decision Models -- Prof. Juran38

Decision Models -- Prof. Juran39 Beta Distribution Parameter Description Characteristics Min Minimum Value Any number-∞ to ∞ Max Maximum Value Any number-∞ to ∞ Alpha (α) Shape Factor Must be > 0 Beta (β) Shape Factor Must be > 0 The Beta distribution is a continuous probability distribution defined by four parameters:

Decision Models -- Prof. Juran40

Decision Models -- Prof. Juran41 The Beta distribution is popular among simulation modelers because it can take on a wide variety of shapes, as shown in the graphs above. The Beta can look similar to almost any of the important continuous distributions, including Triangular, Uniform, Exponential, Normal, Lognormal, and Gamma. For this reason, the Beta distribution is used extensively in PERT, CPM and other project planning/control systems to describe the time to completion of a task.

Decision Models -- Prof. Juran42

Decision Models -- Prof. Juran43 The project management community has evolved approximations for the Beta distribution which allow it to be handled with three parameters, rather than four. The three parameters are the minimum, mode, and maximum activity times (usually referred to as the optimistic, most-likely, and pessimistic activity times). This doesn’t give exactly the same results as the mathematically- correct version, but has important practical advantages. Most real-life managers are not comfortable talking about things like probability functions and Greek-letter parameters, but they are comfortable talking in terms of optimistic, most-likely, and pessimistic. PERT Approximations

Decision Models -- Prof. Juran44 3-step Procedure

Decision Models -- Prof. Juran45 Beta Distributions in Crystal Ball

Decision Models -- Prof. Juran46 Beta Distributions in Crystal Ball

Decision Models -- Prof. Juran47 Operations Example: Project Management (PERT) Sharon Katz is project manager in charge of laying the foundation for the new Brook Museum of Art in New Haven, Connecticut. Liya Brook, the benefactor and namesake of the museum, wants to have the work done within 41 weeks, but Sharon wants to quote a completion time that she is 90% confident of achieving. The contract specifies a penalty of $10,000 per week for each week the completion of the project extends beyond week 43.

Decision Models -- Prof. Juran48

Decision Models -- Prof. Juran49

Decision Models -- Prof. Juran50 Here’s an activity-on-arc diagram of the problem:

Decision Models -- Prof. Juran51 To use a beta distribution, we would start a spreadsheet model like this, calculating the mean and standard deviation using the PERT formulas:

Decision Models -- Prof. Juran52 Calculating shape and scale parameters:

Decision Models -- Prof. Juran53 A section to keep track of each node and when it occurs A section to keep track of each path through the network, to identify the critical path in each simulated project completion A section for simulating the times of the activities Model Overview

Decision Models -- Prof. Juran54 Here’s the section keeping track of the activity times. The numbers in column I will be CB assumption cells.

Decision Models -- Prof. Juran55 For each of the random activities, we create an assumption cell, as shown here for Activity A:

Decision Models -- Prof. Juran56

Decision Models -- Prof. Juran57

Decision Models -- Prof. Juran58 Example: Activity C

Decision Models -- Prof. Juran59 Now we set up an area in the spreadsheet to track each of the paths through the network, to see which one is critical. This network happens to have six paths, so we set up a cell to add up all of the activity times for each of these paths:

Decision Models -- Prof. Juran60 Now we set up an area in the spreadsheet to track each of the paths through the network, to see which one is critical. This network happens to have six paths, so we set up a cell to add up all of the activity times for each of these paths:

Decision Models -- Prof. Juran61 Now, for each activity, we can set up an IF statement to say whether the activity was critical for any particular realization of the model. Note that Activity H (Procure Steel, in row 9) is part of two paths (A-B-D-E-F-H-K-L-M, in row 19, and C-E-F-H-K-L-M, in row 20). In this example, neither of those was the critical path, so Activity H is non-critical.

Decision Models -- Prof. Juran62 Here’s a cell to tell whether the project was completed by week 43: Here’s a cell to keep track of the penalty (if any) Sharon will have to pay. Note that we have assumed that the penalty applies continuously to any part of a week.

Decision Models -- Prof. Juran63 Now we create output cells to track: (a) the completion time of the whole project (B30), (b) the criticalities of the various paths (H19:H24) and (c) activities (N2:N15), and (d) whether the project took longer than 43 weeks, and what the penalty was (C30:D30).

Decision Models -- Prof. Juran64

Decision Models -- Prof. Juran65

Decision Models -- Prof. Juran66 What completion time should Sharon use, if she wants to be 90% confident? The best way to answer that is to look at the percentiles for the Project Time forecast cell:

Decision Models -- Prof. Juran67 Question 3: What is the probability of completion by week 43? We can answer that using the statistics from the “<= 43?” forecast cell, or by using the mean line on the frequency chart:

Decision Models -- Prof. Juran68 Another way would be to use the grabber on the frequency chart for the completion time:

Decision Models -- Prof. Juran69 Give an estimated probability distribution for the amount of penalties Sharon will have to pay. What is the expected value of the penalty? Here’s the frequency chart and the summary statistics:

Decision Models -- Prof. Juran70 Criticality indices for the paths:

Decision Models -- Prof. Juran71 Criticality indices for the activities:

Decision Models -- Prof. Juran72 Summary Operations Simulation Models Reliability Analysis –RANK, VLOOKUP, MIN Inventory Order Quantities –Single Product (MAX) –Multiple Products with Correlated Demand Project management –PERT Analysis