Individual Meter Point Reconciliation. What? Calculation of actual energy used at meter point level for all supply points Allow sites to be accurately.

Slides:



Advertisements
Similar presentations
MOD 326 – Allocation of Unidentified Gas Following the Appointment of the AUGE August 2010.
Advertisements

PN UNC Workgroup (AQ topic)
1 Project Nexus Modelling costs and benefits Andrew Wallace, Cesar Coelho Ofgem Project Nexus IA Subgroup 25 July 2012.
12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
© 2007 E.ON Nexus AQ Requirements To support the current business processes We need to maintain performance and enable market operation as is using current.
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
Mod 232 Anna Taylor Pricing Manager. 1 Mod 232 An alternative methodology for allocating unidentified energy Currently allocated by RbD entirely in SSP.
Gas Consumer Forum Project Nexus xoserve update 27th July 2009
Senior Stakeholder Forum 04/02/2014. Agenda UK-Link Programme Update –Including Data Cleansing Update Nexus Modification Update Faster Switching EU Reform.
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
1 Modification 422 Creating the permission to release data to Meter Asset Provider organisations A presentation by the Community of Meter Asset Providers.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
Code Administrators Working Group Introduction 28 August 2008.
Draft Review Proposal 175 Encouraging Participation in the elective DM Regime Phil Broom 25 October 2007.
Nexus Workgroup CSEP Transition Topic June
Gas Performance Assurance Framework 11 th January 2013 Confidential.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
1 Performance Assurance Workgroup January 2014 A proposal by Xoserve for a Performance Assurance methodology.
Code Governance Review Major Policy reform Proposals Gas Customer Forum 26 January 2009.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
Total xoserve income £(a)m (ASA services – includes element for transporter funded changet) Transporter funded change budget built into service charge.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
PN UNC Workgroup Settlement Issues 1 st November 2011.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal February 2010 Karen Kennedy ScottishPower.
Connected System Exit Points Options for strategic regime change Chris Warner.
Restricted Invoice Period Criteria Rochelle Hudson.
IGT and Shipper Workgroup meeting 28 th February 2011.
CONFIDENTIAL - Modification Proposal 0395 © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
UNC Modification Proposal 0202 National Grid Distribution
Options for Mod 640 Replacement
MOD570 Obligation on Shippers to provide at least one valid meter reading per meter point into settlement once per annum 25th February 2016 Angela Love.
Review Group 178 SSP as Domestic only.
Incentives 26 September 2018.
Modification th July 2008.
Project Nexus Workgroup
Connected System Exit Points Administration Options
CSEPs Reconciliation Proposals
Rolling AQ Review Group 177.
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Connected System Exit Points Administration Options
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
Nexus Requirements To support the current business processes
Project Nexus Workgroup
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Genuine Reconciliation
AUG Query Responses 21st November 2013.
PROJECT NEXUS FUNDING – THE CUSTOMER’S VIEW
Connected System Exit Points - Update
Project Nexus Workgroup
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Modification 421 – Updates and Benefits Case
Project Nexus Workgroup
Modification Proposal 136
Modification 440 Project Nexus iGT Single Service Provision
REVIEW GROUP 178 – AN ALTERNATE SOLUTION
PN UNC Workgroup (AQ topic)
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Xoserve Draft UIG Incentives Modifications 20 May 2019
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

Individual Meter Point Reconciliation

What? Calculation of actual energy used at meter point level for all supply points Allow sites to be accurately reconciled Incentives on shippers to obtain reads Transparent supporting data

Why? RbD was essentially an interim step to enable competition amidst data, process and system limitations RbD works with one dominant shipper, however, there are now six shippers with large RbD portfolios Approx 400TWh of unreconciled energy p.a. Huge potential cost misallocations Support for reform from RbD shippers The industry has evolved, as has technology, no excuse for acceptance of imprecise settlement arrangements UK Link replacement system due in 2012 Electricity has worked for almost a decade ???

When? Jul ’07 – Review proposal to Panel Aug ’07 – Initial review group meeting Oct ’07 – Report to Mod Panel Nov ’07 – Raise mod & consultation Jan ’08 – Panel recommendation Q1 ’08 – Ofgem determination

Benefits More certainty for RbD shippers Incentives to get meter readings Less potential for ‘gaming’ on AQ review Smaller AQ review process More correct cost allocation to shippers Improved data quality Will emphasise extent of other ‘leakage’ points and increase incentives on market to address Reduced risk for RbD shippers Incentives for smart metering

Issues Type of Model – LSP / electricity / other Establish an accurate view on costs Funding arrangements Resistance from neutral participants Timing Shipper performance targets Reconciliation periods Impact on settlements Data aggregation Inclusion of IGT meter points