Review & Update of the Stormwater C.3 Guidebook Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.

Slides:



Advertisements
Similar presentations
SMP Sizing in Redevelopment Projects Scenarios are countless Tools –Simple method –CN back calculation –Peak Discharge Rate Chapter 10 Criteria List of.
Advertisements

Construction of Facilities Dan Cloak Environmental Consulting Construction Workshop, May 2, 2012.
Wetland Critical Areas - Draft Ordinance Overview 18.20: Definitions Many new definitions added for clarity when used in the regulations and several unnecessary.
Preparing a Stormwater Control Plan Stormwater C.3 Guidebook 6 th Edition.
What’s New in the Fifth Edition Dan Cloak Environmental Consulting May 23, 2011.
UW LID Workshop Permeable Pavement Modeling June 2008 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Simplified Sizing Tool for LID Practices in western Washington Alice Lancaster, PE Herrera Environmental Consultants.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR LID FACILITY DESIGN Prepared.
Where are the regulations going? Dan Cloak Environmental Consulting May 23, 2011.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Low Impact Development Best Management Practices
Low Impact Development for Stormwater Treatment and Hydrograph Modification Management in California Dan Cloak, Principal Dan Cloak Environmental Consulting.
Stormwater Management
Bioretention Design Getting the Details Right. Coordination of Plans Curb elevations, grade breaks, architectural plans consistent with delineation of.
Better Site Design Sustainability & Stormwater
Western Washington Hydrology Model Version 3 Vancouver, WA, Workshop October 17, 2007 PM.
Why and How; What’s Working and What Isn’t.  How Low Impact Development can mitigate effects of urban drainage  Applying design criteria for bioretention.
Smarter Stormwater Management Kelly Schmitt Rose Stenglein An example of Low Impact Design.
Coastal Smart Growth s/index.htmhttp:// s/index.htm
Stormwater Master Plan University of North Carolina Peter A. Reinhardt Sharon Myers, L.G. Department of Environment, Health and Safety.
UVM-AWRA CHARRETTE: designing an alternative stormwater treatment technique W h a t I s a C h a r r e t t e? A Charrette is a cross-disciplinary workshop.
C.3 in MRP 2.0 What to Expect (as of March 17, 2015) Dan Cloak.
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
Implementing MRP Provision C.3 Stormwater NPDES Compliance For New Developments.
6 th Edition CCCWP Management Committee February 15, 2012.
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling.
Horsley Witten Group, Inc. Rhode Island Stormwater Design and Installation Standards Manual Public Workshop Design Elements for BMPs January 19, 2011.
To Meet NPDES Retention and Hydromodification Management Requirements Tom Dalziel Program Manager, Contra Costa Clean Water Program Dan Cloak Dan Cloak.
STEP 3: SITING AND SIZING STORM WATER CONTROLS Section 6.
Background and Overview Stormwater NPDES Compliance For New Developments.
Dan Cloak, P.E. 18 September 2007 to achieve water quality benefits in Contra Costa County Implementing Low Impact Development.
Low Impact Development for Prince William Advanced Master Gardeners Frank Reilly.
VOLUME CONTROL using Inter-Event Dry Periods by Marty Wanielista, Josh Spence, and Ewoud Hulstein Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Leila Talebi (3/28/2012).  The existing land use of Cincinnati Zoo consists of various types including parking lot, open space areas, and steep wooded.
BPRD DISTRICT OFFICE AND RIVERBEND PARK Robin Laughlin, ALSA, RLA.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Stormwater Treatment and Flow Control Dan Cloak, P.E. Presentation to the San Diego Region Co-permittees Hydromodification Workgroup December 6, 2006 Contra.
What’s New in Stormwater Requirements for Development Projects? Jill Bicknell, P.E. EOA, Inc. New Development Workshop May 22, 2013.
Bernie Engel, Larry Theller, James Hunter Purdue University.
Stormwater Treatment and Flow Control Dan Cloak Presentation to the Citizens Advisory Committee November 13, 2006 Options for implementing new Phase II.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
For Bioretention Facilities Dan Cloak Environmental Consulting May 23, 2011.
VOLUME CONTROL using Inter-Event Dry Periods Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
Stormwater Water Quality Treatment Options Alvin Shoblom, P.E. Hydraulics Engineer.
Hydrograph Modification Management in Contra Costa County Dan Cloak, P.E. Dan Cloak Environmental Consulting.
Horsley Witten Group, Inc. Stormwater Management and Elements of Low Impact Development Protecting Our Water Resources – An Ecological Approach to Land.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Low Impact Development for Compliance with NPDES Treatment and Hydrograph Modification Management Requirements in Contra Costa County Tom Dalziel, Assistant.
For Bioretention Facilities Dan Cloak Environmental Consulting May 23, 2011.
Countywide Model SUSMP July 17, Topics SUSMP Timeline Goals Approach to Compliance NPDES Permit Requirements NPDES Permit Requirements Model SUSMP.
PSGB Ecosystem Conference The Effectiveness of LIDs in Reducing Stormwater Runoff February 9, 2009 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Low Impact Development [presenters name] [presentation date] Integrated Management Practices Controlling Stormwater Quality and Quantity using.
STORMWATER MANAGEMENT
Post-Construction Requirements Design Challenges Dan Cloak, P.E.
By: Dario and Donovan. Low impact development or LID is an approach to land development or redevelopment, that works with nature to manage storm water.
ASCE LID Conference LID Analysis Considerations in Western Washington November 17, 2008 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
 Holds water in the landscape so it infiltrates (drain) into the ground.
Analyzing a Development Site for Low Impact Development design.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
Dubin Environmental Consulting Santa Barbara County Stormwater Control Measure Sizing Calculator Introduction and Instructions (Beta Test Version) 12/13/2013.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Bernie Engel, Larry Theller, James Hunter
Central Coast Region Stormwater Control Measure Sizing Calculator
Central Coast Region Stormwater Control Measure Sizing Calculator
Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) November 18, 2018 Jay Dorsey.
MIDS Calculator Use - Intermediate
Presentation transcript:

Review & Update of the Stormwater C.3 Guidebook Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting

Topics Review: What hasn’t changed LID requirements Design procedure Dry wells, flow-through planters, and bioretention facilities Update: What has changed Two new IMP designs IMP Sizing Calculator

Chapters 1, 2, 3 and 5 Stormwater Control Plan required Consistency and completeness Delineate drainage areas on exhibits Describe drainage and facilities Integrate with site and landscape design submittals Consider operation & maintenance

Soils, Plantings, and Irrigation Appendix B published January 2009 Soils Detailed soil specification “Brand name” mixes by local suppliers Plantings Plant list Fertilization, weed control, pest control Irrigation Smart irrigation controllers Drip emitters

Chapter 4: LID Design Process Analyze Project for LID Develop and Document LID Drainage Design Specify LID Preliminary Design Details Coordinate with Site Design and Landscape Design

Analyze Your Project for LID 1. Optimize the site layout 2. Use pervious surfaces 3. Disperse runoff where possible 4. Drain remaining runoff to: Bioretention Facilities Flow-through Planters Dry Wells Cisterns + Bioretention Bioretention + Vault

1. Optimize the Site Layout Define the development envelope Set back from creeks, wetlands, and riparian habitats Preserve significant trees Minimize grading

1. Optimize the Site Layout Preserve and use permeable soils Limit roofs and paving Detain and retain runoff throughout the site Use drainage as a design element

2. Use Pervious Surfaces Green roofs Permeable pavements

3. Disperse Runoff

4. Direct Runoff to Facilities Bioretention facilities Flow-through planters Dry wells Cisterns + Bioretention Bioretention + Vault

LID Design Process Analyze Project for LID Develop and Document LID Drainage Design Specify LID Preliminary Design Details Coordinate with Site Design and Landscape Design

Document Drainage Design 1. Delineate drainage management areas (DMAs) 2. Classify DMAs and determine runoff factors 3. Tabulate DMAs 4. Lay out facilities

Only one surface type within each area Many-to-one relationship between drainage areas and facilities Four Types of Areas 1. Self-treating areas 2. Self-retaining areas 3. Areas draining to a self-retaining area 4. Areas draining to a treatment facilities Drainage Management Areas DMA

Self-treating DMAs Must be 100% pervious Must drain offsite Must not drain on to impervious areas Must not receive drainage from impervious areas Must not drain to treatment facilities No treatment or flow control required No further calculations required

Self-retaining DMAs Berm or depress grade to retain 1" rain Set area drain inlets above grade Amend soils Terrace mild slopes Have limited applicability in Dense developments Hillsides

Areas draining to self-retaining areas Impervious areas can drain on to self-retaining areas Example: Roof leaders directed to lawn or landscape Maximum ratio is 2:1 for treatment; 1:1 for flow control No maintenance verification required

Areas draining to self-retaining DMAs

Tabulating Areas Self-Treating Areas DMA NameArea (SF) Self-Retaining Areas DMA NameArea (SF) Areas Draining to Self-Retaining Areas DMA Name Area (SF) Post- project surface type Runoff factor Receiving Self-retaining DMA Receiving DMA Area (SF) Ratio

Areas draining to Bioretention Facilities Areas used to calculate the required size of the bioretention facility Where possible, drain only impervious roofs and pavement to bioretention facilities Delineate any pervious areas as separate Drainage Management Areas

DMA Name DMA Sq. Ft Surface Type Runoff Factor Area x runoff factor Sizing Factor Min. Size Size Planned Facility A-----  DMAs draining to facilities Treatment-only example

Calculating Facility Size A-2: Paving 10,000 SF A-3: Turf 20,000 SF A-1: 5,000 SF Roof Bioretention Facility A

DMA Name DMA Sq. Ft Surface Type Runoff Factor Area x runoff factor A Roof A Paved A Grass Sizing Factor Min. Size Size Planned Facility A-----  DMAs draining to facilities Runoff Factors from Table 4-2 on p. 42

Sizing Factors for Flow Control Surface Storage, V 1 Subsurface Storage, V 2 Area of soil flooded before overflow, A

Bioretention Design Options Edge Treatments Subsurface Storage Options Stepped-back side slope Using Shallow Flooding for Storage

Adjustment for Rainfall

Orifice Sizing for Flow Control

Calculation Format with Flow Control DMA Name DMA Area (square feet) Post- project surface type DMA Runoff factor DMA Area  runoff factor Soil Type:IMP Name IMP Sizing factor Rain Adjustment Factor Minimum Area or Volume Proposed Area or Volume TotalIMP Area V or V1 V2 Orifice Size:

Update Two new IMPs Sizing Calculator

Cistern + Bioretention

Bioretention + Vault

Sizing Calculator