Dale McMaster, President & CEO Alberta Electric System Operator November 2006 Alberta: Canada’s First Competitive Electricity Market.

Slides:



Advertisements
Similar presentations
1 The Changing Fortunes of the EUs Energy Market Antony Froggatt.
Advertisements

NERC Policies Introduction
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Smart Grid: an Ontario Perspective Brian Hewson, Senior Manager Regulatory Policy Hamilton May 8, 2013.
The Midwest ISO from a Transmission Owner Perspective.
Reliability in British Columbia
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
Setting a New Course for Electricity in Ontario Presented to the WNA Annual Symposium by Milton Caplan 2004 September 8.
1 Energy Efficiency and Iowa Utilities Presentation to the Energy Policy Advisory Forum, convened by Governor-Elect Chet Culver January 4, 2007 Presented.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Single Buyer and Ontarios Electricity Supply Structure presented by Jan Carr, CEO, Ontario Power Authority to the workshop on Reforming Electricity Industry.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
PERSPECTIVES OF THE COMMON BALTIC ELECTRICITY MARKET Prof. Inna Steinbuka, Chair, Public Utilities Commission, Latvia The Institute of Economic Affairs.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Highlights of the 2003 New York ISO State of the Market Report David B. Patton, Ph.D. Potomac Economics Independent Market Advisor April 14, 2004.
SAS 70 Third Party Report on Controls Overview and Timetable Finance / Audit Committee Meeting Austin, Texas January 14, 2003/ February 18, 2003.
Canada Committed to a Nuclear Future Presented to the 15 th Pacific Basin Nuclear Conference by Milton Caplan President, MZConsulting Inc October.
© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
New England Developments in Demand Response and Smart Grid 2010 National Town Meeting on Demand Response and Smart Grid Henry Yoshimura, Director, Demand.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Regional Energy Markets Assistance Program Kazakhstan November 8-11, 2010.
Cost Ranges for the Development and Operation of a Day One Regional Transmission Organization PL
Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Reliable Power Reliable Markets Reliable People Future Demand and Energy Outlook (2008 – 2028) Assumptions, Methodology and Processes April 2, am.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
“Investment in Transmission” Economics of Electricity Markets – IDEI Toulouse, 2-3 June 2005 Jon Carlton – Director of Network Strategy.
2011 Contribution Policy AESO Tariff Applications October 17 th, 2011.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
Towards Regional Independent Operators – a main driver for successful market integration.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
The Continuing Evolution of U.S. Electricity Markets
NATIONAL GRID Market Evolution in Ireland APEX 2004 Annual Conference Ann Scully Manager, Market Operations ESB National Grid.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
ENTELA SHEHAJ Albanian Energy Regulator (ERE) DOES MONITORING METHODOLOGY MATTERS? Electricity Market Monitoring in Albania.
The Transmission Imperative November 3, 2011 Jay Caspary.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
1 Are We Ready For The Future? 2005 NIPPC Annual Meeting September 8, 2005 Michael R. Niggli President, Sempra Generation.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
Powering Alberta AESO Annual General Meeting May 14, 2009 Reliable Power Reliable Markets Reliable People.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Sec. 5 RE-REGULATION- EPAct 1992 FERC Orders 888 and 889 (1996) EPAct 2005 In short these three laws move the power industry towards an increase in competition.
Reliable Power Reliable Markets Reliable People Demand Response in Alberta’s Wholesale Electricity Market Demand Response Working Group Kick Off Meeting-
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Updated 1/28/2011.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
SAFIR WORKSHOP: MARKET DEVELOPMENT AND REGULATORY PROCESSES Craig Glazer Vice President—Governmental Policy PJM Interconnection, L.L.C. Washington, D.C.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
California Product Offerings
Wind Management at MISO
Regional Transmission Organizations
Strategies of Reliable Transmission of Energy In A Competitive Market
New England Resource Adequacy
1/16/2019 Univ. of Chicago/Argonne Agents 2002, Oct. 12, 2002 Introduction to Electricity Regulation Randal C. Picker Leffmann Professor of Commercial.
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

Dale McMaster, President & CEO Alberta Electric System Operator November 2006 Alberta: Canada’s First Competitive Electricity Market

2 Presentation Overview  An introduction to Alberta  The structure of the electricity industry  Transmission Policy and its implementation

3 Alberta the Centre of Western Canada

4

5 Alberta’s Electric Industry  More than 21,000 km transmission  Single control area of 660,000 km²  Interties to B.C. (up to 780 MW) & Sask. (up to 150 MW)  Over 280 generating units  9,580 MW system peak  About 200 market participants  11,734 MW internal generation capacity net to grid BC Alta Sask

6 Alberta’s Electricity Generation Net to grid % % % Wind % Wood waste % Other % Total 11,734 (MW) (year-end 2005)

7 Transmission Interconnections Import Export  British Columbia MW  Saskatchewan MW Note: Intertie capability varies with system operating conditions including the generation pattern

8 Alberta Outlook: Load and Supply  A Bit of History:  More than 3,000 MW of new generation added to the system since 2001  4.2% average annual growth rate over the past five years for energy and peak demand  4.9% year-to-date growth in energy  10-year Outlook: 2007 to 2016  3% average annual growth rate in energy and peak demand  requirement for about 3,800 MW of new generation by 2016

9 Competitive Restructuring competitive forces competitive forces natural monopoly Generation Transmission Distribution Functional Separation Vertically Integrated Utility natural monopoly Retail

10 Evolution to Competition Timeline Electric Utilities Act passed May 1995 June 1995 Jan May 1998 June 1998 Aug Jan Power Pool Council (PPC) formed EUA takes effect Power Pool begins operation Independent PPC & Market Surveillance Administrator appointed Independent Transmission Administrator appointed Gov’t auctions rights to formerly regulated generator output (PPAs) PPAs go into affect Retail Competition begins June 2003 AESO formed

11 Electric Utilities Act Minister of Energy Appoints BP and AESO Boards, EUB Chairman & MSA Market Surveillance Administrator (MSA) Balancing Pool (BP) Wholesale Energy Market Alberta Electric System Operator System Operator Alberta Energy & Utilities Board (EUB) Regulates AESO’s Transmission business Alberta Industry Structure Transmission System Development and System Access Service

12 The AESO: Background  Created as part of electric industry restructuring  Our mandate is defined by legislation Do not own transmission or generation assets Independent of industry (no commercial interests) “not - for - profit” organization Act in the public interest  Our mission: The AESO facilitates a fair, efficient, openly competitive and sustainable market for electricity and provides for the safe, reliable and economic operation of the Alberta Interconnected Electric System.

13 The AESO: Core Business  Develop and operate Alberta’s real-time electric energy market Facilitate the fair, efficient and openly competitive market for electricity  Direct the operation of Alberta’s power grid to ensure reliability  Plan development of Alberta’s transmission system to ensure reliability and to facilitate the competitive market and investment in new supply  Provide system access for both generation and load customers

14 Transmission System Roles Responsible for system reliability Responsible for reliability of transmission facilities Directs system operation: Operating Authority Operates & maintains transmission facilities Plans transmission system development Builds and owns transmission facilities Develops and implements transmission tariff Revenue collected via AESO transmission tariff Provides system accessConstructs, owns, operates and maintains system facilities providing system access Procures ancillary services AESO Transmission Facility Owners

15 Energy & Utilities Board (EUB)  The EUB is an independent, quasi-judicial agency of the Alberta government  Regulatory oversight of: transmission system development transmission system access AESO transmission tariff - AESO “own costs” and cost of ancillary services and system losses - TFO facility and operating costs generation projects - environmental and siting approvals

16 Transmission Policy: Drivers for change…  Alberta relies on the competitive market to provide investment for new generation  Only one significant transmission line built in the last 20 years  A once robust transmission system becoming inadequate  Increasing transmission congestion: System losses and the associated costs System reliability – voltage stability Reliance on Transmission Must Run (TMR) generation – excessive costs and distortion of the price signal Compromising the competitive energy market  Impediment to the investment in new supply  Potential impact on the economy of Alberta

17 Why was this happening?  Expectation – “the market” would drive the development of the transmission system  The market signals weren’t adequate: Postage stamp transmission tariff “Energy only” real time pool market – single price No significant locational signals -- i.e. no LMP Ineffective system planning - Absence of decision making criteria - Chicken and egg conundrum  Resulted in an over reliance on location critical gas-fired generation and no new transmission  A clear government policy for transmission system development was required

18 The Policy – an overview  Transmission planning must be proactive leading load growth and generation development -- market signals and/or congestion pricing schemes will not result in timely construction of transmission facilities it is appropriate and necessary to align timelines, milestones and commitment of generation and transmission to ensure transmission is developed in a timely manner preconstruction activities (planning, engineering and ROW) to be proactive and aggressive -- costs deemed to be necessary and prudent actual construction to be timed with generation commitment and milestones to assure coincident completion

19 The Policy cont’d…  Transmission must facilitate a competitive wholesale market – system must be reinforced such that about 95% of expected wholesale transactions can be realized without congestion all in-merit generation can be dispatched and virtually all economic wholesale transactions may be realized without congestion under normal operating conditions

20 The Policy cont’d…  Transmission development should eliminate the need for most Transmission Must-Run (TMR) Generation TMR is not to be considered as a substitute for transmission development ISO to be given flexibility to consider TMR where economic or an acceptable alternative to transmission TMR costs to be based on “cost of service” model  Internal transmission should be reinforced to restore the existing inter-ties to their full import/export ratings transmission internal to Alberta should be reinforced so that under normal conditions the existing interconnections can import and export on a continuous basis in accordance with design capability

21 Since Policy Implementation…  AESO has about $1 billion in transmission investment approved and underway  Major Projects Approved: 500 kV Edmonton to Calgary SW System Reinforcement City of Edmonton Reinforcement NW System Reinforcement  Upwards of $3 billion in new transmission could be required in the next 10 to 15 years  Merchant Transmission – planning stage Montana Alberta Tie Line Northern Lights (major DC Transmission from Northern Alberta to the Pacific NW in USA)

22 Summary  Industry/market structure established in 1996 and enhanced in 2003 has served Alberta well  Merging of the market and transmission functions within the ISO provided efficiencies  Independence of the transmission function is essential to develop competition for generation  System operation has remained reliable  The Transmission Policy has proven effective in advancing the “needs” approvals  The “energy only” market structure has provided sufficient incentives for investment in new supply