Intertie Restoration Update September 15, 2010. Intertie Restoration Recommendation Paper Expected to be released by the end of September Will be released.

Slides:



Advertisements
Similar presentations
In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
Advertisements

Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Introduction of an Intraday market on the Italian borders for the year 2011 Terna proposal Electricity Regional Initiative – CSE Region 15th Implementation.
The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
Load Shed Service for Import Information Session Market Services April 17, 2014.
Info Day on New Calls and Partner Café Brussels, 8 September 2010 How to apply – Budget and Reporting.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Wind Power in Ireland: Treatment of wind in the Single Electricity Market APEx Conference, Paris 16 th October 2007.
Reliable Power Reliable Markets Reliable People ISO Rules Update – – Outage Cancellation – Long Lead Time Energy Dispatch Compliance.
Reliable Power Reliable Markets Reliable People Rule 6.6 Recommendation Update January 29, 2009.
ERCOT Billing, Settlement Disputes & Data Extracts
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
An Overview of the Australian National Electricity Market Brian Spalding Chief Operating Officer.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
Demand Response in Midwest ISO Markets February 17, 2008.
NPRR 209 Presentation Adrian Pieniazek – NRG Texas Technical Advisory Committee May 6, 2010.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Market Services Stakeholder Session January 12, 2011.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
Power Exchanges in the extended EU The experience in Czech Republic APEx Conference 2004 October 11 th, Leipzig Miroslav Marvan Operator trhu s.
CMSC Rules Changes under Consideration Market Operations Standing Committee December 3, 2003 PUBLIC.
Powering Alberta AESO Annual General Meeting May 14, 2009 Reliable Power Reliable Markets Reliable People.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
Proposed CMSC Amendments - Imports & Exports Intertie Trading Sub-committee November 24, 2003 PUBLIC.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Reliable Power Reliable Markets Reliable People Market Services Operating Reserve Redesign Project April 28, 2008 Working Group Session.
Reliable Power Reliable Markets Reliable People Losses and Ancillary Services: Volume Analysis 2007 Budget Review Process August 28, 2007 Operations Planning.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Market Operations Standing Committee of the IMO Market Operations Standing Committee April 23, 2003.
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
PJM © 2006 The Institute for Regulatory Policy Studies Illinois State University Conference May 12, 2006 Jeff Bladen PJM Interconnection.
Reliable Power Reliable Markets Reliable People AESO Integrated Market Roadmap March 2009 Stakeholder Session.
Final Report Weather Sensitive Emergency Response Service (WS ERS) Pilot Project Carl Raish, ERCOT Technical Advisory Committee November 7, 2013.
Sep 22, 2003Market Operations Standing Committee of the IMO1 Change Management: Market Rules Update John MacKenzie, IMO.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
QMWG Report to WMS S. Looney April 9, NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Transmission Rights. The Markets EnergyForwardTransmissionRightsAncillaryServices Must Run Contracts Energy OperatingReserveCapacityReserve Procurement.
Revisions to the Information Confidentiality Catalogue Presentation to the Market Operations Standing Committee April 23, 2003.
Philippine Feed-In Tariff System Implementation 1.
Market Working Group Update Presentation to CAWG March 29, 2011 Jim Sanderson, KCC.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
CO – CART Project Status Protocol Revision Subcommittee Update 08/17/2006.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
CAISO Market Design Initiatives Update Donald Tretheway Senior Market Design and Policy Specialist CPUC Storage Proceeding January 14, 2013.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
DS3 and Qualifier Trials Update
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Briefing on 2017 CAISO Policy Initiatives Roadmap
PJM & Midwest ISO Market-to-Market Coordination (APEx Conference 2007)
Overview of Northwest Wind Integration Action Plan
Technical Committee Meeting March 18, 2016
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

Intertie Restoration Update September 15, 2010

Intertie Restoration Recommendation Paper Expected to be released by the end of September Will be released at the same time as the overall Intertie Framework Recommendation Paper Intertie restoration initiatives fit within the context of the overall intertie framework Intertie Restoration paper addresses both import and export restoration Both initiatives will be pursued by the AESO LSSi is the first step in restoring import capacity It is expected other import initiatives will be pursued

Intertie Restoration Policy Interpretations Intertie Restoration services will be treated as a system service with costs allocated to load Consistent with government transmission policy Treats imports and exports similarly to internal loads and generators LSSi or any other import restoration services will not confer transmission rights Infrastructure solutions for further import restoration will also be examined

Recommended LSSi Product Design Procurement to be done through term contracts (1-3 years) Three part price mechanism recommended (similar to standby market price structure) Availability payment – Fixed $/MW payment based on actual consumption and willingness to be armed Arming payment – Indexed to pool price based on volume actually armed Trip Payment – Fixed $/MW payment based on volume tripped when frequency drops below 59.5 Hz

Recommended LSSi Product Design Availability payment is paid only when service is physically available No payment when the load is not available due to reduced consumption and/or unwillingness to be armed Arming payment is paid when the service is dispatched on to support import flows Indexed to pool price Once armed, the service is firm for the hour to support import schedule

Implementation Activity Dispatch tool being developed Arm and disarm signal to be sent using SCADA Participants will send the AESO armed status, current availability and future availability (next and next + 1) AESO will arm providers as required to support scheduled import flow Settlement to be a ‘shadow settlement’ system Providers submit monthly invoice to the AESO AESO performs shadow settlement to verify accuracy

Implementation Activity OPP Changes Required to OPP 312 Arm and disarm duty for the system controller Update import capability (Revised ATC table) AESO will initiate consultation process on this change in the near future

Next Steps Finalize product design and initiate procurement process Contract being developed Procurement process will begin in the later part of Q4 Consultation initiated on required rule changes LSSi targeted to be in place and operational for Q2 2011

Questions?