Republic of South Africa IPP Procurement Programme

Slides:



Advertisements
Similar presentations
INVESTMENTS IN POWER SECTOR
Advertisements

1 Making Contract Opportunities and Awards More Transparent Ahmet Arif Sezgin Public Procurement Authority of Turkey Rabat 03 April 2008.
Joint WTO/WB Regional Workshop on Procurement Reform and Transparency Session 4: Objectives of Procurement Regimes and Non-Discrimination and Preferences.
INTELLIGENT ENERGY EUROPE Applying for funding where to focus? W. Gillett and V. Berrutto Heads of Unit Executive Agency for Competitiveness and Innovation.
1 EU Policies on Sustainable Energy Regions for Economic Change Workshop on Low-Carbon Economy: Energy Efficiency in Regions and Cities Brussels 21 May.
1 Contracts, Competitive Bids 2004 USAC E-rate for Beginners 2004 USAC E-rate from the Service Provider Perspective FCC Orders.
Addition Facts
Construction Engineering 221
Department for Work and Pensions 1 The Work Programme Tuesday 7th September 2010.
Bank Guarantees and Indemnities 26 th August 2013 Abdul Yassim Vice President Trade and Working Capital 1 Absa presentation title Date of presentation.
RENEWABLE ENERGY 29/03/2012 Green Industries, Department of Trade and Industry.
NIH RESEARCH CONTRACTS
EU Remedies Directives Update Florence Gregg figpc ltd, M:
- 1- Just enough. Just in time. Just for you March 24, 2011 Building a solid foundation: A new approach to ERP acquisition March 24, 2011 Mike Reyna Project.
Motivations for a Socially- Owned Renewable Energy Sector: A South African Case Study Dinga Sikwebu National Education Coordinator.
Foundations of Chapter M A R K E T I N G Copyright © 2003 by Nelson, a division of Thomson Canada Limited. Understanding Pricing 13.
Chapter foundations of Chapter M A R K E T I N G Understanding Pricing 13.
UK enabling Legislation Renewable Energy Strategy.
The Role of ESCO in Wholesale Trade of Electricity (Capacity) ( REVIEW OF WHOLESALE TRADE OF ELECTRICITY) KUTAISI September,
ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston
© The Treasury 1 Better Business Cases “Investing for change” Overview.
Target Costing If you cannot find the time to do it right, how will you find the time to do it over?
Global Entrepreneurship and Small Business Management
Tendering Yuck!.
Introduction to Public Private Partnerships
Winter 2013/2014 Reliability Solution Including LNG MWHs N. Jonathan Peress Conservation Law Foundation Greg Lander Skipping Stone NEPOOL Markets & Reliability.
Apprenticeship Grant for Employers of 16 to 24 year olds (AGE 16 to 24) Employer Update Presented by DMT Business Services.
Allocation of capacities between Portugal and Spain Madrid 30 th April 2013.
Colombia´s Offsets Program September 2007 Yaneth Giha Director of Planning & Budgeting.
Lora Duzyk Assistant Superintendent, Business Services.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
28 th of February, Romanian Power System – the right time to act Ph.D.(Eng) Carmencita CONSTANTIN, Director of Energy & Environment Strategies.
SOUTH AFRICA’S RENEWABLE ENERGY INDEPENDENT POWER PRODUCER PROGRAMME (REI4P) 2014 REVIEW REPORT:
Renewable Energy Program in Jordan
Overview of the South African Renewable Energy Independent Power Producer Programme (IPP Program) Bruce Linke Finance and Projects 30 April 2012.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
Longyuan Mulilo De Aar 2 WEF MW Onshore Wind Energy Facility
Black Business Council 7 June South African partner : 40 % 2. Local content, job creation & BEE: 30 % 3. Contribution towards local community.
Renewable Energy IPP Procurement Programme: Summary of Evaluation Findings 07 December
IRP – Commitments required now Our objectives – IRP alignment (water, security, emissions, cost etc.) – Legal diligence – Financial sustainability (buyer.
Viability Gap Funding By Ashok Chawla Additional Secretary Department of Economic Affairs, Government of India 20 th December, th December, 2006.
1 Role of the African Development Bank in Developing Clean Investments Mrs. Hela Cheikhrouhou – Manager Infrastructure Finance, Private Sector Operations,
Global Power Company of the Year 2001 Proudly South African Broad Based Black Economic Empowerment Programme 31 August 2005.
1 Hela Cheikhrouhou Manager, Private Sector Infrastructure Finance Africa Carbon Forum, Nairobi, March 2010 African projects and programs: Developing enhanced.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
Click to add title Policies to support local energy systems: do they go far enough? Jim Watson, Research Director UK Energy Research Centre EG&S KTN Annual.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
RIAAN VISSER GFIMFO Manager: Consulting Services SizweNtsalubaGobodo.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
6/8/12 PPC-Energy: Update on Window 1 RE-IPP Procurement Programme. 07 June
SMART ELECTRICITY Planning and building a modern infrastructure for South Africa SMART Electricity Planning a healthy, modern, affordable electricity supply.
Africa Utility Week 05 Challenges of Undertaking an IPP in South Africa as a PPP James Aiello 17 May 2005.
Background The Department has adopted an IRP with 42% target of electricity generation from renewable energy sources 03 rd August 2011 the Department.
Presentation to Select Committee on Economic Development
6 th Zimbabwe Mining and Infrastructure Indaba 8-10 October 2014 Harare, Zimbabwe.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
MINEM – April Undersecretariat of Renewable Energy Ministry of Energy and Mines - MINEM Republic of Argentina RENEWABLE ENERGY IN ARGENTINA New Regulatory.
Small Projects IPP Procurement Programme First Stage 2 Bid Submission Phase Preferred Bidders’ Announcement 4 October 2015.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
DECC Framework Contract for Innovation Delivery Support – presentation to potential contractors Thursday 20 October.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
Lesedi SMME Workhop Contents Introduction Terms of reference Qualification for benefit Elementary requirements Application process Methodology for.
IPP Bidders Conferance LICENSING OF IPP PREFERED BIDDERS DoE IPP BIDDERS CONFERENCE – Presented by TAMAI HORE.
Portfolio Committee- Trade and Industry – 11 March 2015
IPP Office: Role and Mandate
Progress on the Renewable Energy IPP Procurement Programme
OUTLINE RE Programme Objectives Integrated Resource Plan
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Republic of South Africa IPP Procurement Programme IPPs: An Investor & Community Perspective Maduna Ngobeni Department of Energy of South Africa

Introduction In August 2011, the Minister determined that 3725MW of renewable energy be procured by IPPs in five different rounds (“Bid Windows”), subsequent to which the DOE initiated the procurement process. In December 2012, in a trio of further determinations, the Minister determined that a further 3200MW of renewables generation capacity was to be procured from IPPs, as well as IPP procurement of coal, gas, hydro and cogeneration generation capacity under the Baseload Programme and the Medium Term Risk Mitigation Project.

Introduction (cont’d) To-date, the Department has: Under renewables Bid Window 1, entered into 28 agreements on 5 November 2012 totaling 1416MW generation capacity; Under renewables Bid Window 2, entered into 19 agreements on 9 May 2013 totaling 1044MW generation capacity. With regards to renewables Bid Window 3: Received 93 bids on the 19 August 2013 Appointed 17 preferred bidders totaling 1456MW generation capacity The Department was pleased to note the competitive pricing offered in the bids received

Introduction (cont’d) Technology MW capacity determined MW capacity already procured Renewables 6 725 3 916 Small Renewables (≤ 5MW) 200 Coal 2 500 Gas 3 126 Hydro 2 609 Cogeneration 800 Total 15 960

PROCUREMENT

Procurement Process Background Procurement documents* Request for Proposals Part A: General Requirements and Rules Part B: Qualification Criteria Part C: Economic Development Power Purchase Agreement Contract between the IPP and the Seller Wind PPA Solar PPA CSP PPA Other technologies etc. Implementation Agreement Contract between the IPP and the Department Obligation for IPP to deliver on economic development obligations On buyer default – Department to pay the IPP * Subject to variation across each programme.

Procurement Process Background Request for Proposal (RFP)* RFP Part A Requirements Rules Qualification RFP Part B Environment Land Economic Develop Finance Technical Price Capacity Comparative Evaluation RFP Part C Economic development Job creation Local content Preferential procurement Enterprise development Socio-economic development * Subject to variation across each programme.

COMPARATIVE evaluation Price 70 %* 30 % ED Project cost Rand/MWh Job creation Socio economic Local content Bidders with the highest combined price and economic development scores that fall within the capacity allocation per Bid Window are awarded preferred bidder status. * Subject to variation across each programme.

Contractual Arrangement IPP Government Eskom Bidders are issued standardised agreements as part of the RFP. PPAs are issued on a per technology basis. Power Purchase Agreement (PPA) Implementation Agreement (IA) Government Framework Support Agreement

STRUCTURE OF AN IPP

Project Structure Majority of bidders in the renewables programme use a project finance structure. Project finance debt is generally more expensive than corporate debt as the only collateral is the project assets. However, a project finance structure shields the equity sponsors from harm should the project fail. Renewables Programme  Bid Window 1 Bid Window 2 Bid Window 3 Project Finance Preferred Bidders 27 18 11 Corporate Finance Preferred Bidders 1 6 Average Debt-Equity Split for Project Finance Preferred Bidders 71:29 75:25 72:28

Typical Shareholding Structure* Smaller South African players have the opportunity of teaming up with large international players to form a project company. * A typical shareholding structure on the renewables programme. Shareholding structures may be substantially different in other programmes.

Funding Packages The DOE wishes to optimise the involvement of black people in the IPP projects and ensure that capacity is built within shareholders which are owned or controlled by black people or local communities to enable them to participate in the energy sector. In support of this, the DBSA may offer a funding package (in the form of a loan) to eligible candidates. The IDC and PIC may also provide loans to South African shareholders.

RENEWABLES & SMALL RENewAbleS

Focus on ED The DOE is committed to furthering economic development in South Africa as can be seen by the 30% weighting assigned to ED in the scoring mechanism of the renewables programme. The table below illustrates some of the criteria on which the ED scoring is based in the renewables programme: Criterion Outcome Job Creation A bidder is incentivised to create jobs for South African citizens with further incentives to hire black citizens, skilled blacks citizens and citizens from the local community. Local Content At least 40% to 45% of the construction cost spend of a project must be local. This encourages local manufacturing growth. Socio-economic development A project is required to spend at least 1% of gross revenue earned during operations on socio-economic development.

Small Renewables Fund The DOE, with National Treasury, is looking to set up a fund to assist small, new developers with financing, as well as reducing the cost and complexity to bid. KfW (German Government development bank) has offered a 34 million euro loan to contribute to the fund. The DOE will seek to involve commercial banks (the DOE has already received commitment from the commercial banks to contribute to the fund) and other funders to create a fund large enough to cater to the market.

Small Renewables Fund (cont’d) The fund may well offer standardised documents and panels of EPC and O&M contractors and equipment suppliers (these are the primary participants in an IPP project); this will assist small new developers to become involved and will further the Department’s aim of encouraging local developers. This fund will take some time to create which means that the small renewables programme will need to shift timelines to move in line with the fund’s creation. However, this will allow more local developers to participate which is desirable to the DOE, the greater Government, the country and local communities.

RENEWABLES FACTS & FIGURES

Total Project Funding per MW All figures nominal in R’millions/MW Technology Bid Window 1 Bid Window 2 Bid Window 3 Solar PV 36.6 28.9 18.7 Wind 21.0 19.4 21.6 Concentrated solar power with storage (min 3 hrs per day) 75.8 89.7 Small hydro (≤ 40MW) 44.1 Landfill gas   16.0 Biomass 64.3

Total Jobs Created* Figures represent totals during construction and operations combined. Technology Bid Window 1 Bid Window 2 Bid Window 3 Solar PV 8 498 6 079 9 632 Wind 4 271 4 025 11 118 Concentrated solar power with storage (min 3 hrs per day) 3 265 2 344 4 812 Small hydro (≤ 40MW) 553 Landfill gas   246 Biomass 336 * One job = 12 person-months

All Renewables Locations