1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.

Slides:



Advertisements
Similar presentations
Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
Advertisements

The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Harmonized implementation of CDM Accreditation CDM-Accreditation Panel.
Difficulties in Verification of a PoA: DOEs Perspective by Dr. Kaviraj Singh Workshop on Programme of Activities (PoA) under the CDM: Challenges and Road.
Presented by: Lex de Jonge Vice-Chair CDM Executive Board Clean Development Mechanism EB perspective on recent developments, with a focus on Registration.
Key provisions and institutional arrangements of the CDM Christine Zumkeller UNFCCC/Cooperative Mechanisms
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
Regional Distribution
UNFCCC secretariat Karla Solís, Programme Officer Introduction to current decisions: Recurring issues Project and Entity Assessment Unit CDM Registration.
JI Governance – review of JI Guidelines
Zertifizierung Project Cycle – Programme of Activities 7th CDM Joint Coordination Workshop Jun Wang; TÜV NORD CERT GmbH
. CDM Project Cycle Calibration Melanie Eddis ERM Certification and Verification Services (ERM CVS) CDM Coordination Meeting UNFCCC, Bonn March 2012.
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
BLY CPA Verification- A DOE’ Perspective Archak Pattanaik New Delhi,
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
James Grabert Manager, Joint Implementation, UNFCCC secretariat Joint Implementation Overview & Status Kyoto Protocol and Carbon Market.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
World Bank/KenGen Workshop on CDM Project Methodologies and Preparation October 3 & 4, 2006 CDM Contracting and Legal Issues.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
Conducting Carbon Projects Presented by Adam Shepherd Regional Workshop on Legal, Institutional and Financial aspects of Carbon Finance Istanbul, Turkey.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROGRAM AND CPA L EVEL M ONITORING, P REPARATION OF M ONITORING.
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
CARBON CONTRACTS - the PCF experience September 30, 2002.
Presentation title Session 2: The CDM Project Cycle Post-registration changes Renewal of crediting period Training-Workshop to support the “Uganda Municipal.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
PCF project cycle Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30 – October 2, 2002.
How to develop a Carbon Finance project?. Assessment of tool - Is this landfill project feasible? Source:
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
1 Summary National Workshop Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Validation and Verification of CDM projects SGS Climate Change Programme Shivananda Shetty Business Manager – SGS India Syed Khursheed Zaidi Operation.
The Role of Designated Operational Entities in the CDM High-Level Roundtable on CDM Reform World Bank Carbon Finance Business Washington, D.C., October.
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Integrating Carbon Finance into the Bank’s Work PCF project cycle.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
The Danish CDM Project Development Facility Gustya Indriani Climate Change Researcher, Yayasan Pelangi Indonesia
Preparation and review of the Project 1. Project ideas reviewed by PCF 2. PCN prepared by project sponsor 3. Host country endorsement sought 4. Further.
UNFCCC secretariat, SDM Rocío N. Correia, Associate Programme Officer Efforts undertaken to deliver the expected work Singapore, 28. October 2010.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Clean Development Mechanism
Session 1 Guidelines for projects under Article 6 of the Kyoto Protocol First UNFCCC workshop on implementation of Article 6 projects under the Kyoto Protocol.
Development of determination and verification manual (DVM)
Work Accomplished by JISC
Presentation transcript:

1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis

2 Contents  Validation  Registration  Verification  Issuance

3 Project development PROJECT IDEACONSTRUCTIONFINANCINGFEASIBILITY STUDY MAKE PDD OPERATION REGISTERVALIDATEISSUE CERsVERIFY STAKEHOLDER COMMENTS TEST ADDITIONALITY USE OR MAKE METHODOLOGY NEGOTIATE ERPASELECT BUYER PREPARE PIN and TERM SHEET DELIVER CERs CDM / JI DEVELOPMENT PHYSICAL PROJECT DEVELOPMENT COMMERCIAL DEVELOPMENT STAKEHOLDER COMMENTS MONITOR LETTER OF APPROVAL GENERATE CERs SELECT BUYERSELL AND DELIVER

4 Validation: check of the PDD by a Designated Operational Entity (DOE),  Document review –Check of the PDD –Check of the underlying documents  Site inspection –Check if PDD reflects real situation –Check if monitoring plan is implemented –Interview local stakeholders  International stakeholder comments on PDD – 30 days –Publish PDD on website UNFCCC  Check monitoring and QA/QC procedures

5 What does the validator look for?  Additionality  Application of the methodology  Identification of the baseline scenario  Accuracy, completeness and suitability of monitoring plan  Adequacy of local stakeholder consultation  Analysis of the environmental impacts  Completeness of the PDD

6 CLs, CARs and FARs  CL: Clarification Request –Presented information is insufficient or not transparent. Project participant has to provide additional information  CAR: Corrective Action Request –Mistake has been made –PDD does not reflect real situation –Emission reductions overestimated –Project participant has to change PDD  FAR: Forward Action Request –Recommendation of validator to check aspects of project implementation during verification

7 Registration: acceptance by the EB of the project as being a CDM Project Activity  DOE submits Request for Registration to UNFCCC Secretariat: –PDD –Validation report –Letter of Approval Host Country –Letters of Approval Annex I countries, if applicable  Pay Registration Fee (through the DOE): –USD 0.10 per CER for the first 15,000 CERs of annual average forecast –USD 0.20 per CER for any consequent CER  After check for completeness, documents are published on UNFCCC web  Parties and EB members can request review  If no review is requested: automatic registration after eight weeks  If review is requested: EB will discuss request in its next meeting. If they decide to review, a commission of the EB will investigate the project and report. EB will decide to register, or reject the project, based on the review report

8 Project development PROJECT IDEACONSTRUCTIONFINANCINGFEASIBILITY STUDY MAKE PDD OPERATION REGISTERVALIDATEISSUE CERsVERIFY STAKEHOLDER COMMENTS TEST ADDITIONALITY USE OR MAKE METHODOLOGY NEGOTIATE ERPASELECT BUYER PREPARE PIN and TERM SHEET DELIVER CERs CDM / JI DEVELOPMENT PHYSICAL PROJECT DEVELOPMENT COMMERCIAL DEVELOPMENT STAKEHOLDER COMMENTS MONITOR LETTER OF APPROVAL GENERATE CERs SELECT BUYERSELL AND DELIVER

9 Verification: check of the monitoring report by a Designated Operational Entity (DOE)  Desk review –presented data –Monitoring plan and monitoring methodology –QA/QC system  Site inspection –Check if project is in accordance with PDD –Interviews with key personnel –Cross-check of real data with monitoring report –Check monitoring equipment  CLs, CARs and FARs  Finalisation of verification report

10 What does the verifier look for?  Compliance of real situation with PDD  Correct implementation of the monitoring plan  Monitored parameters  Calculations  Monitoring procedures, including calibration of instruments

11 If monitoring is not in compliance Deviation Minor changes: allow the monitoring report to deviate from the monitoring plan Only for the reviewed period Monitoring plan still applicable EB decides Revision Major changes: allow to change the monitoring plan to make it comply to monitoring methodology, reflect the actual situation, or to improve accuracy For the whole crediting period Monitoring methodology still applicable EB decides

12 Issuance: the CDM Executive Board issues CERs to registry accounts of project participants  DOE submits Request for Issuance to EB: –Monitoring report and supporting documents –Verification report –Certification statement –“Issuance instruction” by Project Participants  Pay Share of Proceeds –USD 0.10 per CER for the first 15,000 CERs per year –USD 0.20 per CER for any consequent CER  After completeness check, documents are published on UNFCCC web  Parties and EB members can request review  If no review is requested: automatic registration after 15 days  Review: comparable to validation process

13 Contact details  Adriaan Korthuis  Phone  climatefocus.com 