Carbon Dioxide Flooding in Central Kansas Reservoirs G. Paul Willhite Tertiary Oil Recovery Project Tertiary Oil Recovery Advisory Board October 19-20,2001.

Slides:



Advertisements
Similar presentations
Permian Basin Overview
Advertisements

Adobe 5 Collaborative Proposed Project Plan February 23, 2004.
Center for Energy Studies David E. Dismukes Center for Energy Studies.
1 Changing Profile of Household Sector Credit and Deposits in Indian Banking System -Deepak Mathur November 30, 2010.
Grain Market Outlook Cover Your Acres Conference Oberlin, Kansas January 22-23, 2008 Daniel OBrien & Mike Woolverton K-State Research and Extension
Status Report on Administrative Response to December 11, 2006 Alleghany Co. School Board Resolution on Alleghany High School Presented by Dr. Robert P.
Threshold System Presented by Jan Stanley, State Title I Director Office of Assessment and Accountability Fall Title I Directors Conference October 23-25,
Critical Approval Commissioner/ State Board of Education Commissioner/ State Board of Education Concept Conference s Concept Review Review and Approval.
Chuck Kutscher National Renewable Energy Laboratory Geothermal Power Potential Energy and Climate Mini-Workshop November 3, 2008.
Steve Crawford, M.Sc Environmental Director 1. Overview and Background Tribal energy mission statement: To be 100% self- sufficient in energy, while safeguarding.
1 Update on Water Issues in Wyoming IPAMS Summer 2007 Meeting Vail, Colorado Brian Jeffries Executive Director Wyoming Pipeline Authority.
Greater Minnesota Transit Investment Plan PAC December 14, 2010.
Risk Management and Optimal Contract Structures for the CCS-EOR* Value Chain Anna Agarwal, John E. Parsons Center for Energy and Environmental Policy Research.
Carbon Dioxide Demonstration Project Supporting Research at KU Jyun-Syung Tsau presented for Tertiary Oil Recovery Project Advisory Board Meeting October.
SPE The Potential For Additional Carbon Dioxide Flooding Projects in the United States SPE April 23, 2008 Hitesh Mohan – INTEK, Inc. Marshall.
2014 Industry Outlook Forum Cook Inlet Energy, LLC Operational Update.
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
Rejuvenation of a mature oil field: Underground Gas Storage and Enhanced Oil Recovery, Schönkirchen Tief Field, Austria IEA-EOR Conference 2009 Torsten.
The Costs and Benefits of Carbon Capture and Storage Khosrow Biglarbigi Hitesh Mohan Marshall Carolus INTEK July 16, 2009 Calgary, Canada.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Sprayer Economics Gary Schnitkey University of Illinois.
Delivering a real CDM Project The BP PRODEEM Rural Solar Project.
The influence of wettability and carbon dioxide injection on hydrocarbon recovery Saif Al Sayari Martin J. Blunt.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Strategy Review Meeting Strategy Review Meeting
Coal to Liquids Plant Site Selection in WV Douglas G. Patchen October 25, 2007.
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,
THE MSUNDUZI MUNICIPALITY AN ECONOMIC DEVELOPMENT STRATEGY FOR A GROWING CAPITAL CITY.
LONE STAR TECHNOLOGIES, INC. IPAA Annual Meeting October 25, 2005.
Chapter 11: Systems Development and Procurement Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Chapter
Carbon Capture and Sequestration Update APPA Energy & Clean Air Task Force April 26, 2010.
Sonat Exploration Company Vessel Failure
Chemical Flooding Bridging the gap between chemical flooding and independent oil producers.
Field Demonstration of CO 2 Miscible Flooding in the Lansing-Kansas City Formation, Central Kansas Alan P. Byrnes (KGS, PM-BP1) Class II Revisited DE-AC26-00BC15124.
Westport Oil and Gas Co., L.P.
CO 2 -ISSUES ENVIRONMENTAL ASPECTS RELATED TO HEAVY CRUDE OIL PRODUCTION AND UPGRADING by Trude Sundset, Statoil R&D Program Manager Energy21.
“RESERVOIR ENGINEERING”
A Case History from Kansas Application of Horizontal Wells in Mature Basins: A Case History from Kansas Tulsa Geological Society September 5, 2000.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
DESIGN AND IMPLEMENTATION OF A CO2 FLOOD UTILIZING ADVANCED RESERVOIR CHARACTERIZATION AND HORIZONTAL INJECTION WELLS IN A SHALLOW SHELF CARBONATE APPROACHING.
POTENTIAL NEW USES FOR OLD GAS FIELDS: SEQUESTRATION OF CARBON DIOXIDE Paul R. Knox Susan D. Hovorka Bureau of Economic Geology Jackson School of Geosciences.
MSSC 2011 Annual Salinity Summit Charles Ahrens Vice President / Water Resources and Conservation Challenges in Brackish Groundwater Desalination Project.
State Energy Resources Coordination Council 2004.
Efficient Pigging of Gathering Lines
CO2 Enhanced Oil Recovery and Storage in Reservoirs
Business Opportunity EPRS Energy Co. Inc.. Overview World-wide oil production has been declining for decades. There are over 400,000 stripper or marginal.
“Advanced sorbent solutions for the environment.” © 2003, all rights reserved Demonstration of Amended Silicates™ for Mercury Control at Miami Fort Unit.
December 12, 2002 Improved Oil Recovery in Mississippian Carbonate Reservoirs of Kansas DE-FC22-93BC14987 Timothy R. Carr, Dana Adkins-Heljeson,
“Perspectives on Montana’s Petroleum Industry” MREA-MPA-MONTAX “Bridges to the Future” Conference October 15, 2009 Dave Ballard President Ballard Petroleum.
Carbon Dioxide Flooding in Kansas Reservoirs G. Paul Willhite Tertiary Oil Recovery Project 14 th Oil Recovery Conference, March 14-15,2001.
WESTCARB Annual Meeting Overview Larry R. Myer University of California Office of the President California Institute for Energy and Environment.
Field Demonstration of CO 2 Miscible Flooding in the Lansing-Kansas City Formation, Central Kansas Alan P. Byrnes Kansas Geological Survey Alan P. Byrnes.
INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE (IPCC) The IPCC on Carbon dioxide Capture and Storage Heleen de Coninck (IPCC WG III on Mitigation) DEFRA/IRADe.
Assesment of of CO 2 EOR & Sequestration Potential in Gulf Coast Reservoirs Mark H. Holtz, Vanessa Núñez López, and Caroline L. Breton.
 Completed slim-tube tests for MMP measurement.  Completed swelling tests.  Completed phase behavior model.  Completed preliminary geological model.
Southwest CO 2 Sequestration Partnership: Field Demonstrations of CO 2 Sequestration Exploring Carbon Science and Technology Options Western Regional Air.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective.
Tom Beebe Project Manager
1 October 2005 Energy Summit 2005: Louisiana’s Integration with Global Energy Markets.
Business Opportunity EPRS Energy Co. Inc.. Overview Domestic oil production has been declining for decades. There are over 400,000 stripper or marginal.
CO2-Prophet model based evaluation of CO2-EOR and storage potential
“Perspectives on Montana’s Petroleum Industry” MREA-MPA-MONTAX “Bridges to the Future” Conference October 15, 2009 Dave Ballard President Ballard Petroleum.
M idcontinent I nteractive D igital C arbon A tlas and R elational Data B ase James A. Drahovzal, Lawrence H. Wickstrom, Timothy R.Carr, John A. Rupp,
1 Salt Water Disposal Pilot Project October 14, 2008.
Developments in Utica Shale Economic Potential
CO2 EOR and Sequestration Technologies in PetroChina
Unconventional Reservoirs
Geologic Carbon Sequestration Opportunities in Kansas
POTENTIAL NEW USES FOR OLD GAS FIELDS: SEQUESTRATION OF CARBON DIOXIDE Paul R. Knox Susan D. Hovorka Bureau of Economic Geology Jackson School of Geosciences.
Presentation transcript:

Carbon Dioxide Flooding in Central Kansas Reservoirs G. Paul Willhite Tertiary Oil Recovery Project Tertiary Oil Recovery Advisory Board October 19-20,2001

Minimum Miscibility Pressure

Requirements for Carbon Dioxide Miscible Flooding Minimum miscibility pressure must be determined for Kansas crude oils Minimum miscibility pressure must be determined for Kansas crude oils Must be possible to re-pressure reservoir to reach MMP during the displacement process Must be possible to re-pressure reservoir to reach MMP during the displacement process Carbon dioxide must be available at a price that will make the process economic Carbon dioxide must be available at a price that will make the process economic Tertiary Oil Recovery Project

Minimum Miscibility Pressure in Hall-Gurney LKC Tertiary Oil Recovery Project

Outline of Presentation The Central Kansas Initiative The Central Kansas Initiative Field Demonstration Project Hall-Gurney Field Field Demonstration Project Hall-Gurney Field The Carbon Dioxide Supply The Carbon Dioxide Supply New Partner New Partner Expanded DOE Project Expanded DOE Project Tertiary Oil Recovery Project

Outline of Presentation The Central Kansas Initiative The Central Kansas Initiative Field Demonstration Project Hall-Gurney Field Field Demonstration Project Hall-Gurney Field The Carbon Dioxide Supply The Carbon Dioxide Supply New Partner New Partner Expanded DOE Project Expanded DOE Project Tertiary Oil Recovery Project

Central Kansas Initiative Overall Objective Verify technical and economic viability of the application of CO2 miscible flooding to Central Kansas oil fields Verify technical and economic viability of the application of CO2 miscible flooding to Central Kansas oil fields Critical element: Demonstrate sufficient field performance(oil in the tank) to justify the development of a carbon dioxide pipeline into Central Kansas Tertiary Oil Recovery Project

Components of Carbon Dioxide Program Phase I:Conduct a feasibility study on Arbuckle and Lansing Kansas City Reservoirs(KTEC Contract) Phase I:Conduct a feasibility study on Arbuckle and Lansing Kansas City Reservoirs(KTEC Contract) Phase II: Select a site and design one or more field pilot CO 2 miscible floods(DOE Class Program Revisited) Phase II: Select a site and design one or more field pilot CO 2 miscible floods(DOE Class Program Revisited) Tertiary Oil Recovery Project

Components of Carbon Dioxide Program(Continued) Phase III: Construct and operate the CO 2 pilot(DOE Class Program Revisited) Phase III: Construct and operate the CO 2 pilot(DOE Class Program Revisited) Phase IV: Evaluate technical and economic performance of pilot(DOE Class Program Revisited) Phase IV: Evaluate technical and economic performance of pilot(DOE Class Program Revisited) Phase V: Build a CO 2 pipeline into Central Kansas(Kinder Morgan) Phase V: Build a CO 2 pipeline into Central Kansas(Kinder Morgan) Tertiary Oil Recovery Project

Outline of Presentation The Central Kansas Initiative The Central Kansas Initiative Field Demonstration Project Hall-Gurney Field Field Demonstration Project Hall-Gurney Field The Carbon Dioxide Supply The Carbon Dioxide Supply New Partner New Partner Expanded DOE Project Expanded DOE Project Tertiary Oil Recovery Project

Field Demonstration of CO 2 Miscible Flooding in the L-KC, Central Kansas Class II Revisited DE-AC26-00BC15124 MV Energy LLC March 7,2000

L-KC Recoveries in Hall-Gurney and Trapp > 8 MBO/acre 6-8 MBO/acre 4-6 MBO/acre 2-4 MBO/acre Cumulative Production Primary + Secondary Lansing-Kansas City (Per Section Basis) Cumulative Production Primary + Secondary Lansing-Kansas City (Per Section Basis) Kansas Geological Survey

Project Economics Total Project – $5.4 million Total Project – $5.4 million $2.0M – CO 2 Purchase, transport, recycling $2.0M – CO 2 Purchase, transport, recycling $1.5M – Research, Technology Transfer $1.5M – Research, Technology Transfer $1.1M – Capital Costs (wells, etc.) $1.1M – Capital Costs (wells, etc.) $0.8M – Operations (6 years) $0.8M – Operations (6 years) Funding Funding $2.4M Kinder-Morgan CO 2 Co. LP and Murfin Drilling Company $2.4M Kinder-Morgan CO 2 Co. LP and Murfin Drilling Company $1.9M U.S. Department of Energy $1.9M U.S. Department of Energy $1.0M KGS and TORP $1.0M KGS and TORP $0.1M Kansas Department of Commerce $0.1M Kansas Department of Commerce Total Project – $5.4 million Total Project – $5.4 million $2.0M – CO 2 Purchase, transport, recycling $2.0M – CO 2 Purchase, transport, recycling $1.5M – Research, Technology Transfer $1.5M – Research, Technology Transfer $1.1M – Capital Costs (wells, etc.) $1.1M – Capital Costs (wells, etc.) $0.8M – Operations (6 years) $0.8M – Operations (6 years) Funding Funding $2.4M Kinder-Morgan CO 2 Co. LP and Murfin Drilling Company $2.4M Kinder-Morgan CO 2 Co. LP and Murfin Drilling Company $1.9M U.S. Department of Energy $1.9M U.S. Department of Energy $1.0M KGS and TORP $1.0M KGS and TORP $0.1M Kansas Department of Commerce $0.1M Kansas Department of Commerce

DOE Class Program Revisited Central Kansas CO 2 Demonstration Project Phase 1-Reservoir Characterization( 1 Year) Phase 1-Reservoir Characterization( 1 Year) Phase 2-Field Demonstration(4 years) Phase 2-Field Demonstration(4 years) Phase 3-Monitoring(1 year) Phase 3-Monitoring(1 year)

Demonstration Design Summary 55 acre, nine-spot 55 acre, nine-spot 2 CO 2 injectors 2 CO 2 injectors 7 Producers 7 Producers 5 Containment Water Injectors 5 Containment Water Injectors BCF CO 2 injected- WAG BCF CO 2 injected- WAG 4.6 year operating life 4.6 year operating life >80,000 BO estimated recovery during DOE >80,000 BO estimated recovery during DOE >20,000 BO in 3 years after DOE Project >20,000 BO in 3 years after DOE Project 55 acre, nine-spot 55 acre, nine-spot 2 CO 2 injectors 2 CO 2 injectors 7 Producers 7 Producers 5 Containment Water Injectors 5 Containment Water Injectors BCF CO 2 injected- WAG BCF CO 2 injected- WAG 4.6 year operating life 4.6 year operating life >80,000 BO estimated recovery during DOE >80,000 BO estimated recovery during DOE >20,000 BO in 3 years after DOE Project >20,000 BO in 3 years after DOE Project

Outline of Presentation The Central Kansas Initiative The Central Kansas Initiative Field Demonstration Project Hall-Gurney Field Field Demonstration Project Hall-Gurney Field The Carbon Dioxide Supply The Carbon Dioxide Supply New Partner New Partner Expanded DOE Project Expanded DOE Project Tertiary Oil Recovery Project

Carbon Dioxide Supply Is the resource base in LKC reservoirs large enough to support a pipeline that could deliver CO2 at $1.00/mcf? Is the resource base in LKC reservoirs large enough to support a pipeline that could deliver CO2 at $1.00/mcf? Can the “Golden Trend” in the Hall- Gurney Field anchor a pipeline? Can the “Golden Trend” in the Hall- Gurney Field anchor a pipeline? Tertiary Oil Recovery Project

William Flanders

LKC Pipeline Results Risk weighted CO2 for LKC is ~60-65 BCF +-10% Risk weighted CO2 for LKC is ~60-65 BCF +-10% CO2 oil potential from LKC ~15-16MMBO CO2 oil potential from LKC ~15-16MMBO Not enough LKC resource base to anchor pipeline Not enough LKC resource base to anchor pipeline Need ~184 BCF risk weighted CO2 to deliver at $1.00/mcf at 10% IRR/10 year amortization Need ~184 BCF risk weighted CO2 to deliver at $1.00/mcf at 10% IRR/10 year amortization

Carbon Dioxide Pipeline Need an additional 120 BCF risk weighted CO2 potential to build 8” pipeline to Central Kansas Need an additional 120 BCF risk weighted CO2 potential to build 8” pipeline to Central Kansas Are Arbuckle reservoirs potential carbon dioxide miscible flood candidates? Are Arbuckle reservoirs potential carbon dioxide miscible flood candidates? Minimum miscibility pressure ~1600 psi Minimum miscibility pressure ~1600 psi Initial reservoir pressure~ psi Initial reservoir pressure~ psi Well connected to an aquifer Well connected to an aquifer

Outline of Presentation The Central Kansas Initiative The Central Kansas Initiative Field Demonstration Project Hall-Gurney Field Field Demonstration Project Hall-Gurney Field The Carbon Dioxide Supply The Carbon Dioxide Supply New Partner New Partner Expanded Pilot/DOE Project Expanded Pilot/DOE Project Tertiary Oil Recovery Project

Carbon Dioxide Supply ICM(U.S. Energy Partners, LLC) announces ethanol plant to be constructed in Russell(February 5,2001) ICM(U.S. Energy Partners, LLC) announces ethanol plant to be constructed in Russell(February 5,2001) On stream ~November 1,2001 On stream ~November 1,2001 CO2 production 3.4 MMCFD(wet at atmospheric pressure) CO2 production 3.4 MMCFD(wet at atmospheric pressure) 8.5 miles from CO2 demonstration project 8.5 miles from CO2 demonstration project Tertiary Oil Recovery Project

Location of Ethanol Plant & CO2 EOR Site Kansas Geological Survey

Field Demonstration of CO 2 Miscible Flooding in the L-KC,Central Kansas Project Extension Class II Revisited DE-AC26-00BC15124 MV Energy LLC October 1, 2001

Outline of Presentation The Central Kansas Initiative The Central Kansas Initiative Field Demonstration Project Hall-Gurney Field Field Demonstration Project Hall-Gurney Field The Carbon Dioxide Supply The Carbon Dioxide Supply New Partner New Partner Expanded Pilot/DOE Project Expanded Pilot/DOE Project Tertiary Oil Recovery Project

Expanded Pilot Project Kinder Morgan reduced financial support Kinder Morgan reduced financial support CO2 available from ICM plant in Russell CO2 available from ICM plant in Russell Pilot size increased to provide acceptable economic and technical risk to MV Energy, ICM and Kinder Morgan Pilot size increased to provide acceptable economic and technical risk to MV Energy, ICM and Kinder Morgan Budget Period 1 extended to March 2002 Budget Period 1 extended to March 2002 Additional funding obtained from DOE effective October 1,2001 Additional funding obtained from DOE effective October 1,2001 Project extended to 2008 Project extended to 2008 ICM/Kinder Morgan to provide CO2 ICM/Kinder Morgan to provide CO2

Expanded Project Economics Total Project – $7.56 million Total Project – $7.56 million $2.34 M – CO 2 Purchase, transport, recycling $2.34 M – CO 2 Purchase, transport, recycling $2.21 M – Research, Technology Transfer $2.21 M – Research, Technology Transfer $1.33 M – Capital Costs (wells, etc.) $1.33 M – Capital Costs (wells, etc.) $1.68 M – Operations (8 years) $1.68 M – Operations (8 years) Funding Funding $2.03 M MV Energy $2.03 M MV Energy $0.52 M Kinder-Morgan CO 2 Co. LP $0.52 M Kinder-Morgan CO 2 Co. LP $0.97 M ICM $0.97 M ICM $2.77 M U.S. Department of Energy $2.77 M U.S. Department of Energy $1.17 M KGS and TORP $1.17 M KGS and TORP $0.10 M Kansas Department of Commerce $0.10 M Kansas Department of Commerce Total Project – $7.56 million Total Project – $7.56 million $2.34 M – CO 2 Purchase, transport, recycling $2.34 M – CO 2 Purchase, transport, recycling $2.21 M – Research, Technology Transfer $2.21 M – Research, Technology Transfer $1.33 M – Capital Costs (wells, etc.) $1.33 M – Capital Costs (wells, etc.) $1.68 M – Operations (8 years) $1.68 M – Operations (8 years) Funding Funding $2.03 M MV Energy $2.03 M MV Energy $0.52 M Kinder-Morgan CO 2 Co. LP $0.52 M Kinder-Morgan CO 2 Co. LP $0.97 M ICM $0.97 M ICM $2.77 M U.S. Department of Energy $2.77 M U.S. Department of Energy $1.17 M KGS and TORP $1.17 M KGS and TORP $0.10 M Kansas Department of Commerce $0.10 M Kansas Department of Commerce

Expanded DemonstrationProject 60 acre 60 acre 2 CO 2 injectors 2 CO 2 injectors 6 Producers 6 Producers 6 Containment Water Injectors 6 Containment Water Injectors 0.85 BCF CO 2 injected-WAG 0.85 BCF CO 2 injected-WAG 8 year operating life 8 year operating life >96,000 BO estimated recovery >96,000 BO estimated recovery Final pattern is still evolving Final pattern is still evolving

CO 2 Pilot Project Team Kansas Geological Survey Kansas Geological Survey Alan P. Byrnes Alan P. Byrnes Marty Dubois Marty Dubois W. Lynn Watney W. Lynn Watney Timothy R. Carr Timothy R. Carr Willard J. Guy Willard J. Guy John Doveton John Doveton Dana Adkins-Heljeson Dana Adkins-Heljeson Kenneth Stalder Kenneth Stalder Kinder-Morgan CO 2 Co. LP Kinder-Morgan CO 2 Co. LP Russell Martin Russell Martin Paul Nunley Paul Nunley William Flanders(consultant) William Flanders(consultant) U.S. Department of Energy U.S. Department of Energy Edith C. Allison (Prgrm Mngr) Edith C. Allison (Prgrm Mngr) Daniel Ferguson (Project Mngr) Daniel Ferguson (Project Mngr) Kansas Geological Survey Kansas Geological Survey Alan P. Byrnes Alan P. Byrnes Marty Dubois Marty Dubois W. Lynn Watney W. Lynn Watney Timothy R. Carr Timothy R. Carr Willard J. Guy Willard J. Guy John Doveton John Doveton Dana Adkins-Heljeson Dana Adkins-Heljeson Kenneth Stalder Kenneth Stalder Kinder-Morgan CO 2 Co. LP Kinder-Morgan CO 2 Co. LP Russell Martin Russell Martin Paul Nunley Paul Nunley William Flanders(consultant) William Flanders(consultant) U.S. Department of Energy U.S. Department of Energy Edith C. Allison (Prgrm Mngr) Edith C. Allison (Prgrm Mngr) Daniel Ferguson (Project Mngr) Daniel Ferguson (Project Mngr) Tertiary Oil Recovery Project G. Paul Willhite Don W. Green Jyun-Syung Tsau Richard Pancake Rodney Reynolds Rajesh Kunjithaya Ed Clark MV Energy LLC Dave Murfin Jim Daniels Larry Jack Niall Avison State of Kansas (Dept. of Commerce) ICM, Inc. Dave Vander Griend Tertiary Oil Recovery Project G. Paul Willhite Don W. Green Jyun-Syung Tsau Richard Pancake Rodney Reynolds Rajesh Kunjithaya Ed Clark MV Energy LLC Dave Murfin Jim Daniels Larry Jack Niall Avison State of Kansas (Dept. of Commerce) ICM, Inc. Dave Vander Griend Kansas Geological Survey Tertiary Oil Recovery Project

Critical Issues Remaining Pattern Selection Pattern Selection Recompletion of old wells Recompletion of old wells Arbuckle reevaluation Arbuckle reevaluation Arbuckle potential Arbuckle potential Properties of oil Properties of oil MMP-nitrogen content MMP-nitrogen content