Make Whole Payments Modification Proposals Modifications Committee Meeting 04 December 2014.

Slides:



Advertisements
Similar presentations
Click to edit Master title style 1 In the run-up to closure Main tasks for managing authorities, paying authorities and winding-up bodies European Commission.
Advertisements

INTRA-DAY TRADING: Conference Call COD for Interconnector Units in WD1 Ending Overlap Optimisation Period (EOOP) 29 November 2011.
Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped.
Mod_34_11 : Transition to SEM Intra-Day Trading 6 December 2011.
EU Market Situation for Poultry Management Committee 29 August 2013.
New England Developments in Demand Response and Smart Grid 2010 National Town Meeting on Demand Response and Smart Grid Henry Yoshimura, Director, Demand.
Solving Absolute Value Equations Solving Absolute Value Equations
NI Executive Budget 2010 BRIEFING FOR CAL COMMITTEE.
Year-End Duties. Cancellation of Warrants – Old Outstanding Checks IC : All checks outstanding and unpaid for a period 2 years as of December.
Capacity Allocation & Congestion Management Network Codes Stakeholder Meeting 3 July 2012 Introduction & Overview \
Mod 26_12 Notification Time for updating Interconnector Technical Data.
Allowing DSUs to act as Predictable Price Takers in the SEM 4th December, 2014.
NI Executive Budget 2010 Pre-Consultation. Outline Background and Context UK Fiscal Position Implications for NI Budget Way Forward Key Questions.
1 Loss Adjustment When Exporting Mod 24_11 Reflection of Physical Fixity of Interconnector Flows in Operational Data Transactions hen Exporting Modifications.
MOD_17_12 Report on Offered Capacity in Implicit Auctions.
1 Revenue Update Jody M. Wagner Secretary of Finance Commonwealth of Virginia
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
Overview of Make Whole Payments Modifications Committee Meeting February 2015.
Mod_03_12 Alignment of TSC with Revised VAT Arrangements 29 th May 2012.
Global Aggregation Working Group 15 th September 2010.
Modification MOD_24_12 Amendments to the MIUN Calculator to address instances of Excessive Area.
Mod Publication of UK Wholesale Gas Market Liquidity Data Richard Fairholme E.ON UK Transmission Workstream, August 7 th 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of Bulk Energy Storage in SEM Gaelectric Energy Storage T&SC Modification Working Group 6 th September 2012 Mullany Engineering Consultancy Energy,
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 31 January 2012.
INTRA-DAY TRADING Development of Modification(s) 1st February 2011.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
1  The IPM model projects increases in electricity prices as a result of the RGGI policy scenarios which, by themselves, would increase the household.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 25 September 2012.
Proposed CMSC Amendments - Imports & Exports Intertie Trading Sub-committee November 24, 2003 PUBLIC.
Modification Proposal Mod_11_12 Gaelectric Energy Storage Presentation to Modifications Committee 29/05/2012.
Mod 10_11 Interconnector Under Test Mod 14_11 Pumped Storage Under Test Tuesday, 5 th April 2011.
SEM – One Year On Liam Ryan, Market Operations Manager.
INTRA-DAY TRADING Modification Development 5 April 2011.
INTRA-DAY TRADING DESIGN Changes required to the MIUN Calculation for SEM Intra-Day Trading 27 March 2012.
Mod_18_10_v2 : SEM Intra-Day Trading 6 December 2011.
Nord Pool Spot and Europe
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Mod_02_13 Registration of Charges WG Update 03 April 2014.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
Impact of Increasing Meter Errors on the SEM Modifications Committee Meeting 65 3 rd December 2015.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
MOD0164 Bi-Directional Connection Point Overrun Charge Calculation Stuart Waudby (Centrica Storage Ltd.)
Gemini Release 4 UKLC Update 8 th February Gemini Release 4 – UKL13820  UK Link Committee is requested to approve the following:  Implementation.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
SEM & Target Model Update 22 nd FUI Implementation Group Meeting London, 30 September 2011.
Connecting the Dots in New England: NEPOOL’s IMAPP Initiative
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
* Amendment to Appendix P to ensure correct treatment of Interconnector Unit Offer Data 29th May 2012 * 1##
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Net Inter Jurisdictional Import Submission
Update to Unit Under Test Process
MOD_09_18 Interim Credit Treatment for Participants with Trading Site Supplier Units 13th March 2018.
MOD_21_18 Application of Settlement Reallocation Agreements to Market Operator Charges and Settlement Document Definition and Usage 21st June 2018.
Mod_34_18 Removal of Make-Whole Payments for biased quantities and negative imbalance revenue, and small clarifications to determination of Start Up Costs.
Imbalance Price Modifications
Office of Sponsored Programs
Transmission Workstream – Partial Assignment
Outage Adjusted Wind and Solar Forecast Reports
MOD_05_19_V2 Amendment to Uninstructed Imbalance Charge (CUNIMB) to correct for negative price scenarios 11th April 2019.
Imbalance Price Modifications
Interconnector trading in SEM 7th June 2007
Capacity Market Code Modifications
Office of Sponsored Programs
Presentation transcript:

Make Whole Payments Modification Proposals Modifications Committee Meeting 04 December 2014

Introduction Two RA Modification Proposals submitted Mod_09_14 Amendment to Make Whole Payments for Interconnector Units Mod_10_14 Make Whole Payments for Interconnector Units 2

Background SEM has seen a significant increase in level of Make Whole Payments (MWP) recently. This increase has been predominantly attributable to interconnector units. 3

Level of MWPs 4

Impact of Trading Pattern In addition to increasing levels of MWPs, the recently seen trading patterns have reduced the efficiency on IC trades Generally reducing imports across the day when price differentials suggest ICs should be fully importing Creating an inefficient export signal This is increasing prices in SEM in addition to increased MWPs costs The RAs do not believe that the current treatment of MWPs in the Code is a prerequisite to efficient export when price differentials are in the right direction. 5

2013 RA Analysis 6

Total Export MIUNs June

Example - June 2014 Analysis 8 IC MWPs – circa €900,000 Export MIUNs – 116,963 MWh Actual IC Exports 5,062 MWh These net exports represent a significant cost

Explanation of Proposals Mod_09_14 Amendment to Make Whole Payments for Interconnector Units The purpose of this Modification Proposal is to amend the Code so that Interconnector Users receive Make Whole Payments based on their aggregate position across all gate windows (EA1, EA2 & WD1) in which they have traded from the current Code wording where each gate window is considered separately for the calculation of Make Whole Payments. 9

Explanation of Proposals (2) Mod_10_14 Make Whole Payments for Interconnector Units The purpose of this Modification Proposal is to amend the Code so that Interconnector Units no longer receive Make Whole Payments in the market. 10

Summary Level of MWPs has increased significantly of late In addition to absolute level there has been a corresponding reduction of efficient import trades through netting RAs are of the view that the current situation in the Code is not a perquisite for efficient trading cross border RAs have proposed two potential solutions We look forward to the discussions and deliberations of the Committee 11