2013 Apr.30-May.03 Shuei EPICS Collaboration Meeting 2013 Spring 1 Acquisition of Long Waveform using Yokogawa SL1000 Shuei YAMADA KEK / J-PARC.

Slides:



Advertisements
Similar presentations
S o f t w a r e D e f i n e d R a d i o
Advertisements

Fill in missing numbers or operations
Slide 1 Insert your own content. Slide 2 Insert your own content.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
1 AMY Detector (eighties) A rather compact detector.
Credit hours: 4 Contact hours: 50 (30 Theory, 20 Lab) Prerequisite: TB143 Introduction to Personal Computers.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
0 - 0.
Addition Facts
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
ZMQS ZMQS
Year 6/7 mental test 5 second questions
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
EPICS at SSRF/Shaghai in March.2008, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members at Mar.2008.
BLM System for NSRL HLS PCaPAC 2000, Oct.9 ~ 12, 2000Page 1 PC and CAN Bus in Beam Loss Monitor System for NSRL Yonggang Cui, Beibei Shao Department of.
© Richard A. Medeiros 2004 x y Function Machine Function Machine next.
Machine Protection – ISSC 2010B. ToddAugust 2010 Thanks to : TE/MPE/MI, CERN Machine Protection Panel, et al 0v3 A Future Safety System?
ESLS 04 Daresbury Laboratory
Booster Synchrotron Cavities: An Overview in the Context of PIP Mohamed Hassan, Timergali Khabiboulline, Vyacheslav Yakovlev 07/03/2013.
TERA (Italy) – IFIC (Spain)
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
Overview of Fermilab Accelerator Complex and Beam Lines T. Kobilarcik FNAL.
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
WG-D: Commissioning Strategies, Operations and Performance, Beam Loss Management, Activation, Machine Protection Conveners: J. Galambos, T. Koseki, M.
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
Using Technology Effectively Caroline Hargrove World Rowing Coaches Conference 22 nd January 2011.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
SNS Spallation Neutrino Source 1 SNS layout GeV proton linear accelerator Accumulator ring Main target Stripping foil.
Week 1.
Number bonds to 10,
Mitglied der Helmholtz-Gemeinschaft Beam Cooling at HESR in the FAIR Project 12 th September 2011 Dieter Prasuhn.
Mats Lindroos Will we ever do a beta-beam design study beyond the present CERN-Frejus baseline? Mats Lindroos.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
1 Unit 1 Kinematics Chapter 1 Day
Highlights From the Survey on the Use of Funds Under Title II, Part A
S o f t w a r e D e f i n e d R a d i o
MICE & nuSTORM V. Blackmore University of Oxford Neutrino Oscillation Workshop September 13 th, /30V. Blackmore: MICE.
Results from first tests of TRD prototypes for CBM DPG Frühjahrstagung Münster 2011 Pascal Dillenseger Institut für Kernphysik Frankfurt am Main.
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
Development of new power supplies for J-PARC MR upgrade Yoshi Kurimoto (KEK) for J-PARC accelerator group.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
Development of EPICS Embedded Image Processing System Takashi Obina, Jun-ichi Odagiri, Ryota Takai KEK, Accelerator Laboratory.
BPM DAQ for KEK Linac EPICS IOC using WindowsXP-based Oscilloscope for BPM DAQ System in KEK e-/e+ Linac Masanori Satoh (KEK Linac) June 13-16, 2011 EPICS.
Beam diagnostics control for J-PARC LINAC Guobao SHEN J-PARC Center Japan Atomic Energy Agency Mar
EPICS at APS in June.2006, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members * Try to enhance updates in the last 1 year.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
Details of space charge calculations for J-PARC rings.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Asian Test Beam Facilities Satoru Uozumi Kyungpook National University Mar-29 th 2010 Beijing China IHEP Beijing TBF Russia.
Present Status of EPICS Development at the 3GeV Proton Beam Transport Facility Control System in J-PARC JAERI Motoki OiTetuya KaiSinichiro Meigo Sinichi.
STATUS OF BNL SUPER NEUTRINO BEAM PRORAM W. T. Weng Brookhaven National Laboratory NBI2003, KEK November 7-11, 2003.
1 Current Status of The Control System for J-PARC Accelerator Complex Hiroshi YOSHIKAWA J-PARC Center at KEK/JAEA October 16, 2007 ICALEPCS2007 at Knoxville.
J-PARC Accelerator and Beam Simulations Sep. 7th, SAD2006 Masahito Tomizawa J-PARC Main Ring G., KEK Outline of J-PARC Accelerator Characteristics of High.
1 Status of the T2K long baseline neutrino oscillation experiment Atsuko K. Ichikawa (Kyoto univeristy) For the T2K Collaboration.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Python based particle tracking code for monitor design Kenichirou Satou J-PARC/KEK.
Development Plan for Reliable Card-size IOC N. Kamikubota and S.Yamada, J-PARC/KEK May 2015 in MSU, kami, KEK/J-PARC.
Operations Machine Simulator.
Shuei YAMADA (KEK / J-PARC)
High power beam operation at J-PARC: status and future
J-PARC main ring lattice An overview
SLS Timing Master Timo Korhonen, PSI.
Development of new power supplies for J-PARC MR upgrade
< kek.jp > Measurement and Data Acquisition for Accelerator Controls at KEK (Beam Position Monitor at Linac) Kazuro Furukawa < kazuro.
EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh.
Presentation transcript:

2013 Apr.30-May.03 Shuei EPICS Collaboration Meeting 2013 Spring 1 Acquisition of Long Waveform using Yokogawa SL1000 Shuei YAMADA KEK / J-PARC

2013 Apr.30-May.03Shuei EPICS Collaboration Meeting 2013 Spring 2 Contents J-PARC Long-waveforms in J-PARC MR Yokogawa SL-1000 Summary

Japan Proton Accelerator Research Complex : J-PARC 2013 Apr.30-May.03Shuei EPICS Collaboration Meeting 2013 Spring 3 Tokai village, Ibaraki 130km from Tokyo 80km from Tsukuba Tokyo Tsukuba

2013 Apr.30-May.03Shuei EPICS Collaboration Meeting 2013 Spring 4 J-PARC Facilities ©google Hadron Experiment Facility LINAC 180MeV/c 25Hz RCS 3GeV/c 25Hz Main Ring 30GeV/c 2.48 sec (FX) 6.0 sec (SX) In operation since 2008 Materials and Life Science Facility Neutrino Experiment Facility Pacific ocean N

2013 Apr.30-May.03Shuei EPICS Collaboration Meeting 2013 Spring 5 J-PARC Main Ring ©google ≫ MW-class High Power Proton Synchrotron for Particle Physics and Hadron Physics ◇ T2K neutrino oscillation experiment ◇ Hadron experiments (e.g. Kaon rare decays) ◇ Future experiments (e.g.  -e conversion) ≫ Slow-Cycle Machine ◇ Accelerate from 3 GeV to 30 GeV ◇ Fast Extraction 2.48 s [0.12 (inj) (acc) + recovery] ◇ Slow Extraction: 6.0 s [0.12 (inj) (acc) (sx) + recovery] ≫ Need to monitor entire cycle, in cycle-by-cycle  Long Waveforms are Important

Example of a Long Waveform: MR Beam Intensity Record each cycle Requirements from Machine Operation Estimators of Beam Loss, Slow Extraction quality 2013 Apr.30-May.03Shuei EPICS Collaboration Meeting 2013 Spring 6 100kHz for waveform 1sec for data transfer MR cycle (6 sec, Slow Extraction)

Yokogawa WE Units being used in J-PARC MR DCCT, BPM, Magnet Power Supplies, etc. Many experiences 15 years old Small memory size: few MWords (depends on A/D module) Slow data transfer: 1800 kB/s (WE7000  EPICS IOC) Discontinued 2013 Apr.30-May.03Shuei EPICS Collaboration Meeting 2013 Spring 7

Yokogawa SL1000 Modular-type DAQ system Replacement of WE channels (2ch * 8slots) Isolated inputs (850V) Various A/D modules (100MHz12bit - 100kHz16bit) Data transfer rate: 5900 kB/s (SL1000  IOC, preliminary) Max. record length: 100MW/unit VXI-11 (1000Base-T) & USBTMC EPICS Device Support 2013 Apr.30-May.03Shuei EPICS Collaboration Meeting 2013 Spring 8

SL1000 Device Support 2013 Apr.30-May.03Shuei EPICS Collaboration Meeting 2013 Spring 9 Yokogawa’s reference Implementation Oscilloscope (# of samples: sequence) Decimated waveform per channel Single raw waveform record shared by all channels KEK / J-PARC in-house ver. Based on Yokogawa’s Arbitrary number of samples Raw waveform per channel Testing in SX operation

Summary 2013 Apr.30-May.03Shuei EPICS Collaboration Meeting 2013 Spring 10 WE7000SL1000 Modular-type DAQ system Life (discontinued)2007Dec- EPICS Device SupportBy KEK ( ) By Yokogawa (oscilloscope, db + OPI) By KEK (2012-, in J-PARC) Data transfer rate1800 kB/s5900 kB/s (preliminary) # of units in use J-PARC MR J-PARC LI …10 Few (in test phase)

2013 Apr.30-May.03 Shuei EPICS Collaboration Meeting 2013 Spring 11

MR Operation Modes 2013 Apr.30-May.03Shuei EPICS Collaboration Meeting 2013 Spring 13 Fast Extraction Slow Extraction

2011 Jun 13-17Shuei YAMADA, EPICS Collaboration Meeting 2011 NSRRC 14 Data Size in J-PARC MR : 400GB/week Operation of MR and data taking started in 2008 MR cycle : 3 sec (FX), 6 sec (SX) Record all waveform data each cycle As many waveform as possible 3-50BT BPM MR Injection Error Monitor MR BPM MR DCCT SX Spill

2011 Jun 13-17Shuei YAMADA, EPICS Collaboration Meeting 2011 NSRRC 15 ROOT in J-PARC MR ROOT-based data acquisition tool : cadump Collects data from EPICS-records each MR cycle Save as ROOT-file ROOT-file Self describing - Definition of data classes written in file Backward and forward compatible - Files created in 2010 should be readable in 2020 Data analysis using ROOT storage EPICS record trigger Offline AnalysisOnline Monitor cadump EPICS record ROOT-file