Coordinated Product and Supply Chain Design

Slides:



Advertisements
Similar presentations
Chapter nine Value Chain Management: Functional Strategies for Competitive Advantage McGraw-Hill/Irwin Contemporary Management, 5/e Copyright © 2008 The.
Advertisements

Objectives Know why companies use distribution channels and understand the functions that these channels perform. Learn how channel members interact and.
Supply Chain Management
Purchasing and Supply Chain Management by W.C. Benton
International Business 9e
Inventory Systems for Dependent Demand
10-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Wants.
Foundations of Chapter M A R K E T I N G Copyright © 2003 by Nelson, a division of Thomson Canada Limited. Supply Chain and Logistics Management 17.
Managing Inventory throughout the Supply Chain
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S.A.F. 1 Commodity Councils 101 NAME (S) SAF/AQCDATE.
The Value of Information
Chapter 4 Supply Contracts.
Red Tag Date 13/12/11 5S.
Target Costing and Cost Analysis for Pricing Decisions
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Managing Technology and Innovation Chapter 17 Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Global Supply Chain Procurement and Distribution
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Target Costing If you cannot find the time to do it right, how will you find the time to do it over?
MANAGEMENT RICHARD L. DAFT.
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
RETAILING MANAGEMENT RETAILING MANAGEMENT 5th Edition.
Chapter 12 Global Marketing Channels and Physical Distribution
The Strategy of International Business Chapter 12
Operations Management
Chapter nine Value Chain Management: Functional Strategies for Competitive Advantage McGraw-Hill/Irwin Contemporary Management, 5/e Copyright © 2008 The.
Global Manufacturing and Materials Management
Implementing Strategy in Companies That Compete in a Single Industry
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. 3-1 BUSINESS DRIVEN TECHNOLOGY Business Plug-In B3 Supply Chain Management.
Delayed Product Differentiation
Coordinated Product and Process Design Class 12: 4/13/10.
Global Manufacturing and Materials Management
Distribution Strategies
Design for Supply Chain Management Phil Kaminsky David Simchi-Levi Philip Kaminsky Edith Simchi-Levi.
Coordinated Product and Supply Chain Design
Key Concepts of Supply Chain Management
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved CHAPTER 8 SUPPLY CHAIN MANAGEMENT.
DRIVING INNOVATION AND ABILITY TO COMPETE THROUGH OUTSOURCING Anthony (Tony) C. Bernardo, Alloy Polymers Inc. NPE 2003 bernardo:
Supply Chain Management
Chapter 2 Supply Chain Strategy. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain how.
9. Coordinated Product and SC Design Case: HP Desk-jet Printer Supply Chain (Read pages ) HP-founded in 1939 Electronic test and measurement equipment.
Chapter 9 Design for Supply Chain Management
Design for Logistics Chap 08 王仁宏 助理教授 國立中正大學企業管理學系 ©Copyright 2001 製商整合科技中心.
Designing & Managing The Supply Chain
Slides 8 Integrating Supply Chain and Development Chain
Chapter 3 Network and System Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
Slides 6 Distribution Strategies
Logistics McGraw-Hill/Irwin
ElecComp Case Large contract manufacturer of circuit boards and other high tech parts. About 27,000 high value products with short life cycles Fierce competition.
SUPPLY CHAIN MANAGEMENT SYSTEMS Part I. 7-2 LEARNING OUTCOMES 1.List and describe the components of a typical supply chain 2.Define the relationship between.
Introduction to Supply Chain Management Designing & Managing the Supply Chain Chapter 1 Byung-Hyun Ha
Intelligent Supply Chain Management Strategic Supply Chain Management
Copyright © 2013 McGraw-Hill Ryerson Limited Slides by Sam Lampropoulos, George Brown College CHAPTER 13 Global Sourcing and Procurement Global Sourcing.
Operations Fall 2015 Bruce Duggan Providence University College.
Supply Chain Management Chapter Two Supply Chain Performance: Achieving Strategic Fit and Scope Md. Golam Kibria Lecturer, Southeast University.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 10 Supply-Chain Strategy.
Logistics.
References: Supply Chain Saves the World. Boston, MA: AMR Research (2006); Designing and Managing the Supply Chain – Concepts, Strategies and Case Studies;
SCM-655: Global Supply Operations Strategy
Chapter 10: Coordinated Product and Supply Chain Design
Distribution Strategies
Chapter 3 Supply Chain Drivers and Obstacles
Chapter 3 Supply Chain Drivers and Obstacles
Topic 6 – Logistics and Supply Chain Management
Chapter 3 Supply Chain Drivers and Obstacles
Chapter 14 Sourcing Decisions in a Supply Chain
Chapter 14 Sourcing Decisions in a Supply Chain
Chapter 3 Supply Chain Drivers and Obstacles
Presentation transcript:

Coordinated Product and Supply Chain Design Chapter 11 Coordinated Product and Supply Chain Design

11.1 A General Framework Two distinct chains in organizations: The supply chain which focuses on the flow of physical products from suppliers through manufacturing and distribution all the way to retail outlets and customers, and The development chain which focuses on new product introduction and involves product architecture, make/buy decisions, earlier supplier involvement, strategic partnering, supplier footprint and supply contracts.

Key Characteristics of Supply Chain Demand uncertainty and variability, in particular, the bullwhip effect Economies of scale in production and transportation Lead time, in particular due to globalization

Key Characteristics of Development Chain Technology clock speed Speed by which technology changes in a particular industry Make/Buy decisions Decisions on what to make internally and what to buy from outside suppliers Product structure Level of modularity or integrality in a product Modular product assembled from a variety of modules each module may have several options Bulk of manufacturing can be completed before the selection of modules and assembly into the final product takes place

Interaction between the Two Chains Fisher’s concept of Innovative and Functional Products Functional products characterized by: slow technology clock speed, low product variety, and typically low profit margins Innovative products characterized by: fast technology clock speed and short product life cycle, high product variety, and relatively high margins.

What Is the Appropriate Supply Chain Strategy and Product Design Strategy for Each Product Type? Each requires a different supply chain strategy Development chain has to deal with the differing level of demand uncertainty

Framework for Matching Product Design and Supply Chain Strategies FIGURE 11-3: The impact of demand uncertainty and product introduction frequency on product design and supply chain strategy

11.2 Design for Logistics (DFL) Product and process design that help to control logistics costs and increase service levels Economic packaging and transportation Concurrent and parallel processing Standardization

Economic Transportation and Storage Design products so that they can be efficiently packed and stored Design packaging so that products can be consolidated at cross docking points Design products to efficiently utilize retail space

Examples Ikea Rubbermaid World’s largest furniture retailer 131 stores in 21 countries Large stores, centralized manufacturing, compactly and efficiently packed products Rubbermaid Clear Classic food containers - designed to fit 14x14” Wal-Mart shelves

Final Packaging Delay until as late as possible Repackaging at the cross-docking point is common for many products

Concurrent/Parallel Processing Objective is to minimize lead times Achieved by redesigning products so that several manufacturing steps can take place in parallel Modularity/Decoupling is key to implementation Enables different inventory levels for different parts

The Network Printer Example FIGURE 11-4: Concurrent processing

Traditional Manufacturing Set schedules as early as possible Use large lot sizes to make efficient use of equipment and minimize costs Large centralized facilities take advantage of economies of scale

Standardization Recall: aggregate demand information is more reliable We can have better forecasts for a product family (rather than a specific product or style) How to make use of aggregate data ? Designing the product and manufacturing processes so that decisions about which specific product is being manufactured (differentiation) can be delayed until after manufacturing is under way

Modularity in Product and Process Modular Product: Can be made by appropriately combining the different modules It entails providing customers a number of options for each module Modular Process: Each product undergo a discrete set of operations making it possible to store inventory in semi-finished form Products differ from each other in terms of the subset of operations that are performed on them

Modularity in Product and Process Semiconductor wafer fabrication is modular since the type of chip produced depends on the unique set of operations performed Oil refining is not modular since it is continuous and inventory storage of semi-finished product is difficult

Modularity in Product and Process Modular products are not always made from modular processes Bio-tech and pharmaceutical industries make modular products but use non-modular processes; many products are made by varying the mix of a small number of ingredients

Swaminathan’s Four Approaches to Standardization Part standardization Process standardization Product standardization Procurement standardization

Part Standardization Common parts used across many products. Common parts reduce: inventories due to risk pooling costs due to economies of scale Excessive part commonality can reduce product differentiation May be necessary to redesign product lines or families to achieve commonality

Process Standardization Standardize as much of the process as possible for different products Customizing the products as late as possible Decisions about specific product to be manufactured is delayed until after manufacturing is under way Starts by making a generic or family product Differentiate later into a specific end-product Postponement or delayed product differentiation

Delayed Differentiation May be necessary to redesign products specifically for delayed differentiation May be necessary to resequence the manufacturing process to take advantage of process standardization Resequencing modify the order of product manufacturing steps resequenced operations result in the differentiation of specific items or products are postponed as much as possible

Postponement Point of differentiation

Benetton Background A world leader in knitwear Massive volume, many stores Logistics Large, flexible production network Many independent subcontractors Subcontractors responsible for product movement Retailers Many, small stores with limited storage

Benetton Supply Cycle Primary collection in stores in January Final designs in March of previous year Store owners place firm orders through July Production starts in July based on first 10% of orders August - December stores adjust orders (colors) 80%-90% of items in store for January sales Mini collection based on customer requests designed in January for Spring sales To refill hot selling items Late orders as items sell out Delivery promised in less than five weeks

Benetton Flexibility Business goals Increase sales of fashion items Continue to expand sales network Minimize costs Flexibility important in achieving these goals Hard to predict what items, colors, etc. will sell Customers make requests once items are in stores Small stores may need frequent replenishments

It Is Hard to Be Flexible When... Lead times are long Retailers are committed to purchasing early orders Purchasing plans for raw materials are based upon extrapolating from 10% of the orders

Benetton Old Manufacturing Process Spin or Purchase Yarn Dye Yarn Finish Yarn Manufacture Garment Parts Join Parts

Benetton New Manufacturing Process Spin or Purchase Yarn Manufacture Garment Parts Join Parts Dye Garment This step is postponed Finish Garment

Benetton Postponement Why the change? The change enables Benetton to start manufacturing before color choices are made What does the change result in? Delayed forecasts of specific colors Still use aggregate forecasts to start manufacturing early React to customer demand and suggestions Issues with postponement Costs are 10% higher for manufacturing New processes had to be developed New equipment had to be purchased

Product Standardization Downward Substitution Produce only a subset of products (because producing each one incurs high setup cost) Guide customers to existing products Substitute products with higher feature set for those with lower feature set Which products to offer, how much to keep, how to optimally substitute ?

Procurement Standardization Consider a large semiconductor manufacturer The wafer fabrication facility produces highly customized integrated circuits Processing equipment that manufactures these wafers are very expensive with long lead time and are made to order Although there is a degree of variety at the final product level, each wafer has to undergo a common set of operations The firm reduces risk of investing in the wrong equipment by pooling demand across a variety of products

Operational Strategies for Standardization Process Nonmodular Modular Product Parts standardization Process standardization Product standardization Procurement standardization

Selecting the Standardization Strategy If process and product are modular, process standardization will help to maximize effective forecast accuracy and minimize inventory costs. If the product is modular, but the process is not, it is not possible to delay differentiation. However, part standardization is likely to be effective. If the process is modular but the product is not, procurement standardization may decrease equipment expenses. If neither the process nor the product is modular, some benefits may still result from focusing on product standardization.

Important Considerations Strategies designed to deal with demand uncertainty and/or inaccurate forecasts Changes suggested in the strategies may be too expensive to implement Redesign related costs should be incurred at the beginning of the product life cycle Benefits cannot be quantified in many cases: increased flexibility, more efficient customer service, decreased market response times

Important Considerations Resequencing causes: level of inventory in many cases to go down per unit value of inventory being held will be higher Tariffs and duties are lower for semi-finished or non-configured goods than for final products Completing the manufacturing process in a local distribution center may help to lower costs associated with tariffs and duties.

Push-Pull Boundary Pull-based systems typically lead to: reduction in supply chain lead times, inventory levels, and system costs making it easier to manage system resources Not always practical to implement a pull-based system throughout the entire supply chain Lead times may be too long May be necessary to have economies of scale in production or transportation. Standardization strategies can combine push and pull systems Portion of the supply chain prior to product differentiation is typically a push-based supply chain Portion of the supply chain starting from the time of differentiation is a pull-based supply chain.

Back to the HP Case Long lead times, high inventory levels, imbalance of inventory Localization (labeling and manuals, power supply, plug) One cause of imbalance (too much inventory for printers localized for one market, too little inventory for another market) Significant uncertainty on how to set safety stock Too many localization options Uncertainty in local markets Some options Air shipment A factory in Europe Improve forecasting practices (how?)

Back to the HP Case HP management considered postponement as an option Ship “unlocalized” printers to European DC and localize them after observing the local demand At 98% service level, safety stock dropped from 3.8 weeks supply to 2.6 weeks supply on the average Annual savings around $800,000 Value of inventory in transit (and hence insurance costs) goes down Some of the localization material can be locally sourced (cheaper) European DC had to be modified to facilitate localization. Printer needed to be redesigned. All Vancouver products now DC-localizable (postponement). One of the best of such practices.

11.3 Supplier Integration into New Product Development Traditionally suppliers have been selected after design of product or components However, firms often realize tremendous benefits from involving suppliers in the design process. Benefits include: a decline in purchased material costs an increase in purchased material quality a decline in development time and cost an increase in final product technology levels.

The Spectrum of Supplier Integration No single “appropriate level” of supplier integration None Supplier is not involved in design. Materials/subassemblies supplied as per customer specifications/design White box Informal level of integration Buyer “consults” with the supplier informally when designing products and specifications No formal collaboration Grey box Formal supplier integration Collaborative teams between buyer’s and supplier’s engineers Joint development Black box Buyer gives the supplier a set of interface requirements Supplier independently designs and develops the required component

Appropriate Level Depends on the Situation Process Steps to follow: Determine internal core competencies. Determine current and future new product developments. Identify external development and manufacturing needs.

Appropriate Level Depends on the Situation Black Box If future products have components that require expertise that the firm does not possess, and development of these components can be separated from other phases of product development, then taking Grey Box If separation is not possible White Box If buyer has some design expertise but wants to ensure that supplier can adequately manufacture the component

Keys to Supplier Integration Making the relationship a success: Select suppliers and build relationships with them Align objectives with selected suppliers Which suppliers can be integrated? Capability to participate in the design process Willingness to participate in the design process Ability to reach agreements on intellectual property and confidentiality issues. Ability to commit sufficient personnel and time to the process. Co-locating personnel if appropriate Sufficient resources to commit to the supplier integration process.

11.4 Mass Customization Evolved from the two prevailing manufacturing paradigms of the 20th century Craft production and mass production. Mass production efficient production of a large quantity of a small variety of goods High priority on automating and measuring tasks Mechanistic organizations with rigid controls Craft production involves highly skilled and flexible workers Often craftsmen Organic organizations which are flexible and changing

Absence of Trade-Offs Two types meant inherent trade-offs Low-cost, low-variety strategy may be appropriate for some products For others, a higher-cost, higher-variety, more adaptable strategy was more effective Development of mass customization implies it is not always necessary to make this trade-off Mass customization delivery of a wide variety of customized goods or services quickly and efficiently at low cost captures many of the advantages of both the mass production and craft production systems not appropriate for all products gives firms important competitive advantages helps to drive new business models

Making Mass Customization Work Highly skilled and autonomous workers, processes, and modular units Managers can coordinate and reconfigure these modules to meet specific customer requests and demands

Key Attributes Instantaneous Costless Seamless Frictionless Modules and processes must be linked together very quickly Allows rapid response to various customer demands. Costless Linkages must add little if any cost to the processes Allows mass customization to be a low-cost alternative. Seamless Linkages and individual modules should be invisible to the customer Frictionless Networks or collections of modules must be formed with little overhead. Communication must work instantly

Mass Customization and SCM Many of the advanced SCM approaches and techniques essential if mass customization is to be successfully implemented IT critical for effective SCM is also critical for coordinating different modules Concepts like strategic partnerships and supplier integration essential for the success of mass customization. Postponement can play a key role in implementing mass customization

SUMMARY Design for logistics concepts Efficient packaging and storage Certain manufacturing steps can be completed in parallel Standardization Integrating suppliers into the product design and development process Advanced supply chain management facilitating mass customization