Pearl Harbor Naval Shipyard Vicky Ah Quin Engineering Lean Manager

Slides:



Advertisements
Similar presentations
High performance; from 1 metric ton to 100 metric tons instant purification facility per hour, 2400tons per day Low energy consumption (25 kw/h – 38 kw/h)
Advertisements

1 "Isky Enviroearth System presentsIsky Enviroearth The Future of energy.
BAE Systems Norfolk Ship Repair National Career Pathways Network Conference 18 October
Damage Control.
Marine engineers design, operate, maintain, and repair the mechanical systems of ships. Working closely with the architect who designs the ship structure,
Great team work. Palplast Palplast is the producer of a complete range of HDPE pipes with diameters between 16mm and 400mm, fittings, irrigation systems.
WELD TESTING.
Steam Generation from Solar Trough Energy The New Red B.
Scott Reinert , P.E. Water Resources Manager El Paso Water Utilities
Airfield Lighting Designs Salt Lake City International Airport
HEAT EXCHANGER GUIDED BY: PREPARED BY:
Corrosion Products Sampler (CPS)
1 Kraft Fuels LPG Products & Services Your Logo Here Franz Keiling An Overview about LPG Dispensers and Technology Franz Keiling An Overview about LPG.
BY: HM1 RIVERA. The CO will ensure a HCP is maintained in their command.  The goal of the hearing conservation program (HCP) is to prevent occupational.
Heat Exchanger Design Thermal / Fluid System Design Final Project Department of Mechanical Engineering Fall 2005 December 13, 2005 Team Members: Andrew.
Ballast Water Developments International Chamber of Shipping Tripartite 2008.
By Hung Nguyen Lime Treatment of Acid Mine Drainage at Leviathan Mine, California.
All Rights Reserved, Copyright (C), MITSUBISHI HEAVY INDUSTRIES,LTD. NO.1 Application of cavitation jet technique to operating nuclear power plant September,12.
Photo Chemical Etching Presentation.  Since 1977, Lancaster Metals Science Corporation has met industries' need for precision metal parts and components.
GENERAL IDEAS IN AIR POLLUTION CONTROL
Paint Circulation Technology Level 1 - Training Document
CEEAM Components for Energy Efficiency in Transport by Additive Manufacturing Piyal Samara-Ratna Mechanical Engineer & Project Lead Space Research Centre.
Chemistry of Long Wear Inhibition of Corrosion and Mending.
OCEN 201 Introduction to Ocean & Coastal Engineering Materials & Corrosion Jun Zhang
NAVAL MATERIALS.
Smart Sample Systems for At-Line Analyzers
Important considerations & contributions of flourishing shipbuilding industries in Bangladesh Khairul Hassan Doctoral student Maritime Engineering, Kyushu.
Jim Chmielewski – HVAC Sales Manager Emerson Control Techniques
Sustainable and Instant-Cure UV Coatings for Concrete Floors
Corrosion & Associated Degradation
NE 110 – Introduction to NDT & QA/QC
Pollution Prevention for Light Industry and the Service Industry P2 Ideas for Urban Environments.
Series Operational Training. 2 Water Tank Water Pump Multiple Discharges 2000 Series Line Strainer Foam Tank Electronic Direct Injection Proportioner.
Metallic phosphoric acid heaters in place of graphite block heaters Vincent PERROT1 SYMPHOS 2013 in AGADIR Morocco.
4.1.5 Student Book © 2004 Propane Education & Research CouncilPage Determining the Proper Corrosion Protection Systems for Underground ASME Tanks.
Petroleum Engineering 406 Floating Drilling
Measurements in Fluid Mechanics 058:180:001 (ME:5180:0001) Time & Location: 2:30P - 3:20P MWF 218 MLH Office Hours: 4:00P – 5:00P MWF 223B-5 HL Instructor:
Selection Criteria Properties Availability Cost Manufacturability
INTRODUCTION Definition:
Dealing with Impurities in Processes and Process Simulators ChEN 5253 Design II Terry A. Ring There is not chapter in the book on this subject.
LASER BEAM MACHINING BY S.PREMKUMAR.
Group 17 Oceanic Thermal Energy Conversion Model - Lockheed Martin 1 Oceanic Thermal Energy Conversions Group Members: Brooks Collins Kirby Little Chris.
BAE Systems Proprietary Information 1 San Francisco Ship Repair POSF Maritime Commerce Advisory Committee Meeting September 17, 2009.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
AIR BEARING SYSTEM.
Prepared by T. Madhavan & K. Chandrasekaran, Lecturers in Zoology, Directorate of School Education., Pondicherry. An Illustration for the students who.
Laser Treated Metallic Probes for Cancer Treatment in MRI Systems July 08, Advance Materials Processing and Analysis Center (AMPAC) Department of.
SIGHT CONSERVATION PROGRAM. REFERENCES 29 CFR
The PRI Advantage Preserves Protects Defends. The PRI Advantage Benefits 1:4000 Dosage Rate Protects Against Carbon, Vanadium, Sulfur, Sludge Unique “Thermal.
Vessel Wash Wastewater Management – Options for Marinas Presented by: Michael J. Danko New Jersey Sea Grant Consortium Virginia Marine Trades Conference.
Engine Performance BASIC MAINTENANCE AND LIGHT REPAIR.
SPERRE RACK COOLER Solving seawater cooling. ” We have improved the proven technology. By combining the benefits from box- and plate- coolers we have.
SPOT ZERO REVERSE OSMOSIS SYSTEM Welcome to Elite Marine Services.
Presentation Title Presented by Joe Blow Heat Transfer 101 & ROI.
4/28/2017 Stress Corrosion Cracking Assessment in Pipeline Mohammed Abu Four October 11, 2010.
Electromagnetic Testing (ET). Electromagnetic Testing Electromagnetic testing is a general test category that includes Eddy Current testing (ECT), Alternating.
Industrial Resources, Inc.
Surface Ship Maintenance and Modernization Contracting Strategy
SNS COLLEGE OF ENGINEERING
INSULATION FOR INDUSTRY AND HOUSING
관상동맥(Coronary artery )
Friction Welding Welding Technology/ 3.5 Friction Welding.
NTI Nanotech International
BOILER CORROSION 11.1 DEFINITION
Corrosion & Associated Degradation
TRENTON Casing Filler Presentation
Corrosion Part 3 Corrosion Protection Methods
Ship Related Corrosion Topics
Selection Criteria Properties Availability Cost
Delivering Advanced Inspection Solutions
Presentation transcript:

Pearl Harbor Naval Shipyard Vicky Ah Quin Engineering Lean Manager

WHO WE ARE Largest Naval Facility in Hawaii … Largest ship repair facility between U.S. West Coast and Far East Largest industrial employer in Hawaii … 4,396 Civilian and 454 Military personnel … Largest employer of engineers in Hawaii FY09 Goods & Salary: $687M Plant Value: $2.1B Approximately 148 acres 176 buildings 38 structures (piers, wharves, drydocks, etc.) ‘One Stop’ Regional Maintenance Center (RMC) ‘Joint Base’ tenant Product Lines: 90% Submarines 10% Surface Ships Hickam AFB Pearl Harbor Naval Complex Intermediate Maintenance Facility (IMF) Shipyard / Controlled Industrial Area (CIA) boundary DD #1 DD #2 DD #3 DD #4 Tenant of Joint Base Pearl Harbor-Hickam (JBPH-H) Code 100: This is an aerial view of the shipyard. (Point out drydocks, IMF boundary, discuss joint basing with Hickam AFB)

PRODUCT LINES & SERVICES Fleet Maintenance CNO Maintenance Prep for VIRGINIA Class (unfunded) Services Technical Assistance Training Emergency Response 11 Surface Combatants (<10% of workload) 20 Submarines (>90% of workload) LOS ANGELES and VIRGINIA Class SSN’s 17 Homeported at Pearl Harbor 3 Homeported at Guam C1200: (Provide a brief overview of primary product lines and services)

WE STILL KEEP THEM ‘FIT TO FIGHT’ 7 Dec 1941: Returned 15 of 18 damaged ships to full service During WWII: PH Navy Yard completed 7,000 ship repairs 1942 - USS YORKTOWN Repair 2005 USS SAN FRANCISCO EMERGENT DOCKINGS: Submarines & surface ships Commercial vessels RIM OF THE PACIFIC EXERCISE: Bi-annual requirements 2000 – USS DENVER 2007 - USS NEWPORT NEWS 2009 - USS HARTFORD PORT ROYAL 2001 - USS GREENEVILLE

Significant Maintenance Challenge Bio-fouling of Ship Sea Water Systems Rapid sea growth due to marine rich environment and warm sea temperature Directly affects system operation and efficiency - water flow and heat transfer degradation Requires routine and costly preventive and corrective maintenance Preventive Maintenance Electro-Chlorination Environmental discharge limits apply: 0.1 ppm chlorine injection require no discharge treatment 0.3 ppm chlorine injection requires de-chlorination discharge treatment For both concentrations: Can only run 2-hrs/day Requires sampling and testing at every run to ensure 0.0-0.1 ppm discharge limits are not exceeded Have minimal effect on reducing sea growth

Significant Maintenance Challenge Bio-fouling of Ship Sea Water Systems Corrective Maintenance Hydro-lance cleaning of heat exchangers and condenser tubes ~6,000 tubes (20’ length) in a submarine main condenser Requires water pressures of 5,000 psi Acid Flush Generates ~35,000 gallons of hazardous waste requiring special handling and treatment Results in pitting and advanced wear of system components and piping Certain systems limit the number of acid flushes that can be accomplished

Possible R&D Solutions Bio-fouling of Ship Sea Water Systems Ultraviolet (UV) Light Would need to be capable of killing micro-organisms in a large, single pass, high-flow environment Could integrate use of “kill” sensors and flow rates to govern light wattage Nano-Film Deposition Develop a nano-substance that could be plated or internally deposited on internal system surfaces that would inhibit the attachment and/or growth of micro-organisms Ideally, the nano-film would be tightly adherent, have great wear properties, not interfere with system operation, be heat resistant, and environmentally friendly

Possible R&D Solutions Bio-fouling of Ship Sea Water Systems Ultrasound Wave Emissions Develop an approach to sonically disrupt micro-organism adhesion Impressed current sacrificial copper or aluminum anodes Introduction of copper or aluminum ions into the water that inhibits mircro-organisms from attaching to surfaces. Analyze applicability for use in naval submarines Automated cleaning of main condenser tubes

Other Possible R&D Solutions Develop an alternative to fiberglass pipe lagging Ideally, material would be thermally efficient, heat and wear resistant, non-hazardous, and would not require painting or other preservation upkeep Develop a portable laser cutting machine Ideally, the machine could follow any contour, cut various types of metals (e.g., stainless steel, inconel, monel, titanium, and aluminum) to desired depths up to an accuracy of 0.0005”, and incorporate a flexible scope (fiber optics) for tight areas Develop a method for laser straightening of Virginia Class submarine shafts Currently, no means is available to straighten shafts when they become distorted. It is anticipated that laser straightening can be a controlled method that can be modeled to produce predictable results

Other Possible R&D Solutions Develop a method for Eddy Current testing of HY100 welds Current ET methods can’t detect transverse cracking in the body of HY100 welds Current process involves removing paint and performing Magnetic Particle inspections, which is costly and time consuming