PSASG Meeting BPA TBL Operation Concerns By Jerry Jackson II

Slides:



Advertisements
Similar presentations
Building a Combined 25F Nomogram Step 0: Define Terms Safe operating area: System remains within limits following the next worst contingency, regardless.
Advertisements

September 24, 2007 – Page 1 ColumbiaGrid Puget Sound Area Study Team Outage Scheduling Challenges Summer 2007 and Beyond Seattle City Light.
Sierra Subregional Planning Group 10-year Transmission Plan
Puget Sound Area Northern Intertie (PSANI) Transmission History ColumbiaGrid September 24, 2007 September 24, 2007 Snohomish County Public Utility District.
NI Curtailment Risk Assessment Draft Update to PSASG 2004 Report 24 Sept 2007 Gordon Dobson-Mack Ellen Feng
Project Update Late 2005 the PSANI Policy Group reviewed mitigation efforts to reduce transmission curtailments in the Puget Sound Region Late 2005 the.
The Midwest ISO from a Transmission Owner Perspective.
©2005 PJM 1 Redispatch Credit NERC/NAESB TLR Task Force Feb 2-3, 2005 Houston, Texas Operations Reliability Subcommittee Feb 8-9, 2005 Scottsdale, AZ.
Survival Estimates for the Passage of Juvenile Salmonids Through Dams and Reservoirs of the Lower Snake and Columbia Rivers (Project ) CBFWA March.
Central California Clean Energy Transmission Project
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff.
Composite Load Model Implementation Update Craig Quist, PacifiCorp January 23-25, 2013 TSS Meeting.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
1 ColumbiaGrid Activities Supporting Integration of Renewable Generation Presentation to the Market Interface Committee At the October 30, 2008 Meeting.
1 WECC PCC Meeting March 7, Members Avista Bonneville Power Administration Chelan County PUD Cowlitz County PUD Grant County PUD Puget Sound Energy.
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
Multiples and Factors Lesson 4.1.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Cleco Transmission Planning Summit 2013
Example: Jacobian Matrix and Power flow Solution by Newton-Raphson Determine the dimension of the jacobian matrix for the power system.
Writing Improper Fractions
1 Overview. 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based.
Multiple dependency activity on node (AoN) networks ( lecture )
Reading a GE PSLF *.epc into PWS
Export ASPEN Sequence Data To PTI WECC Base Case
Big Stone II Study Update SPG Meeting October 19, 2006.
Rocky Mountain Area Transmission Study RMATS Economics Economic Comparisons Preliminary: Distribution of Gains and Losses RMATS Steering Committee July.
Copyright © 2011 Pearson Education, Inc. Numbers in the Real World.
Section 8.4 – Average Value of a Function 7.1. One more formula….. The Average Value of a Function Find the average value of.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N System Condition Update Spring Operations Review Forum June 15, :00 – 2:00 p.m. To participate.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
Congestion Management Settlement Credits December, 2002.
X-box Factoring. X- Box 3-9 Product Sum Factor the x-box way Example: Factor 3x 2 -13x (3)(-10)= x 2x 3x 2 x-5 3x +2.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N System Condition Update Spring Operations Review Forum April 13, :00 – 2:00 p.m. To participate.
Making Clean Local Energy Accessible Now December 16, 2013 Flattening the Duck Dynamic Grid Solutions for Integrating Renewables.
Electric System Reliability in a Post SONGS World.
Energy Year 2014 Electricity Finnish Energy Industries.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
T ransmission I mprovement For the Red River Valley & West Central Minnesota.
North Mankato Load Serving study Xcel Energy Great River Energy.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
Optimization for Operation of Power Systems with Performance Guarantee
Puget Sound Energy Columbia Grid Presentation June 19, 2007 John Phillips.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Puget Sound Energy Columbia Grid Presentation August 15, 2007 John Phillips.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07.
0 Greg Wagoner Manager, Power Supply Wabash Valley Power Association June 6, 2006 Methane Recovery Workshop.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Conclusion: reliable post contingency capacitor switching should be feasible to be planned. However, the simulation needs to be repeated as new information.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.
Puget Sound Area Transmission Expansion Plan Sensitivity Results Review
Topics Corporate Overview – Transmission Expansion Planning - Members
Brett Wangen Director of Engineering, Peak Reliability
A Sample of Seldom Used Tools and other Power Flow Trivia
PSASG Meeting BPA TBL Operation Concerns By Jerry Jackson II
Recent Approved WECC Cases
Lancaster “Project” Tracy Rolstad Avista Transmission System Planning.
Building a Combined 25F Nomogram Step 0: Define Terms
TONBRIDGE POWER GREEN LINE
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
ColumbiaGrid Puget Sound Area Study Team
2018 CG MOD 33 updates CG Planning Meeting June 7, 2018
NI Curtailment Risk Assessment Draft Update to PSASG 2004 Report
Presentation transcript:

PSASG Meeting BPA TBL Operation Concerns By Jerry Jackson II

Concerns 1.) Multiple Outage congestion 2.) Upcoming Outages 3.) PSA solutions

NI S>N 60F anticipated outage combination for 9/11/2007 Study 226 Tacoma - Raver #1&2 500kV, Monroe-Custer #1 500kV, Sedro - Bothell - Horse Ranch 230kV, Tacoma - Cowlitz #2 230kV, Snohomish 230/115kV Bank#3 & March Point 230/115kV Bank #3 O/S (S>N Sep@100MW) (Snohomish Delta Sep scheme enabled: DeltaSw - TualiPt & DeltaSw - C Mary St. 115kV O/S) Study 226 NI S>N 60F

Contingencies Average Puget Sound Net Area Load = 4675 Gen Level Trans   Average Puget Sound Net Area Load = 4675 Gen Level Trans Worst Limiting PSE SCL/ Limit Contingency Facility SNOH 100 140 -141 BFR: 4494 Cust-Mon #2 500kV & Cust 500/230kV Bk#1 Branch MURRAY (40767) TO SNOH S1 (41327) CKT 1 [230.00 - 230.00 kV] 460 -143 775 -149 BFR: 4496 Cust-Mon #2 & Cust 500/230kV Bk#2 260 21 20 13 525 896 BFR: Snohomish 230kV Bus Sect #1 Branch BUNKFOSS (45613) TO SNOH S1 (40984) CKT 1 [115.00 - 115.00 kV] 852 799 N-1: Snohomish - Murray #1 230kV 1000 1556 1512 1463 1200 1529 N-2: Murr - Cust #1 & Belling - Cust #1 230kV Branch CUSTER W (40321) TO PORTALWY (42001) CKT 1 [230.00 - 115.00 kV] 1468 1409

226 vs. ALIS NI S>N 60F

Major upcoming outages Sedro-Bothell-Horse Ranch 230kV Chief Joseph – Monroe 500kV Bothell – SnoKing #1 230kV Rocky Reach – Maple Valley 230kV Monroe 500/230kV Bank #1 Grand Coulee – Schultz #1 500kV Schultz – Raver & Schultz – Echo Lake 500kV

To think about…. Multiple facilities in same area Does the facility have major impacts Ways of implementing mitigation plans Responsibility of mitigation plan? Operation vs. planning arena Agreeing on feasible solutions

Questions?