Hellgate Elementary K-8 into a K-12 School District: A Possibility? MCPS - Potential Bond Issue Facility Costs… November 19, 2014.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Welcome to Who Wants to be a Millionaire
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
& dding ubtracting ractions.
Chapter 1 The Study of Body Function Image PowerPoint
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Fraction IX Least Common Multiple Least Common Denominator
We need a common denominator to add these fractions.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
CALENDAR.
Reducing Fractions. Factor A number that is multiplied by another number to find a product. Factors of 24 are (1,2, 3, 4, 6, 8, 12, 24).
Mean, Median, Mode & Range
1 1  1 =.
1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
Who Wants To Be A Millionaire?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
1 Credit Cards Avoid the Minimum Payments Trap! 3% examples Revised November 2012.
ACC 3200 Chapter 3: Process Costing Process Costing.
Solve Multi-step Equations
Sl No Top-up Amount No Of Affiliate Ads Payment Per Day By Affiliate Ad Total Affiliate Ad Income 1.5,000/- Daily 2 ad for 100 days 100/- Affiliate.
July 11, 2013July 18, 2013July 25, 2013August 1, 2013 August 8, 2013August 16, 2013August 29, 2013September 5, 2013 September.
Look at This PowerPoint for help on you times tables
The table shows the top scores for girls in barrel racing at the 2004 National High School Rodeo finals. The data can be presented in a table or a spreadsheet.
VOORBLAD.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
Solve by Substitution: Isolate one variable in an equation
1..
Fraction IX Least Common Multiple Least Common Denominator
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
City Council Meeting Agenda Items October 28, 2013.
Addition 1’s to 20.
Start. 5a - 5 = 7a - 19 A. 7 B. 16 C. -7 D. None of these.
25 seconds left…...
Subtraction: Adding UP
Equal or Not. Equal or Not
Slippery Slope
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Januar MDMDFSSMDMDFSSS
Week 1.
Number bonds to 10,
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Partial Products. Category 1 1 x 3-digit problems.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
PSSA Preparation.
HB 1048 / SB 518 Adjustments for Local Programs May 13, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
& dding ubtracting ractions.
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Lesson 2-3 Example Example 1 Use the Distributive Property and a model to find 6 ● Draw a model to show 6 ● 13.
Presentation transcript:

Hellgate Elementary K-8 into a K-12 School District: A Possibility? MCPS - Potential Bond Issue Facility Costs… November 19, 2014

** Group recommends $158M in expansion, renovation projects at Missoula schools… Missoulian, May 27, 2014 ** MCPS facilities improvements, backlogged maintenance could take 10 years, trustees learn… Missoulian, June 18, 2014 ** The MCPS high school district needs a minimum of $28 million to cover its maintenance, safety and technology needs. Actual building work would cost $66 million, although a long-range planning committee recommended a budget of about $50 million. That would add $60 a year to the $200,000 home’s property taxes. ** In the elementary school district, addressing the top-priority maintenance, safety and technology problems would cost $13.25 million. Adding the building remodels and replacements would cost closer to $56 million. Hitting the top- and medium priority needs for all elementary buildings would cost $96 million, which is $11 million more than the MCPS elementary district bonding capacity. Missoulian, June 18, 2014

Hellgate Elementary High School Costs = $25,000, Mill Value = $30, Missoula County Public Schools (MCPS) High School Costs = $78,000, Mill Value = $183, K-12 School Expansion Discussion… Topics & Areas to Cover “The MCPS high school district needs a minimum of $28 million to cover its maintenance, safety and technology needs. Actual building work would cost $66 million, although a long-range planning committee recommended a budget of about $50 million. That would add $60 a year to the $200,000 home's property taxes.” Missoulian June 18, 2014

Hellgate Elementary Missoula County Public Schools (MCPS)

Hellgate Elementary High School Costs - $25,000, Mill Value = $30, Missoula County Public Schools (MCPS) High School Costs - $78,000, Mill Value = $152, K-12 School Expansion Discussion… Topics & Areas to Cover “The MCPS high school district needs a minimum of $28 million to cover its maintenance, safety and technology needs. Actual building work would cost $66 million, although a long-range planning committee recommended a budget of about $50 million. That would add $60 a year to the $200,000 home's property taxes.” Missoulian June 18, 2014

Hellgate Elementary Missoula County Public Schools (MCPS)

Hellgate Elementary High School Costs - $16,250, (state debt service GTB assistance of 35%) [ MCA] 1.Mill Value = $30, Missoula County Public Schools (MCPS) High School Costs - $78,000, Mill Value = $155, K-12 School Expansion Discussion… Topics & Areas to Cover “The MCPS high school district needs a minimum of $28 million to cover its maintenance, safety and technology needs. Actual building work would cost $66 million, although a long-range planning committee recommended a budget of about $50 million. That would add $60 a year to the $200,000 home's property taxes.” Missoulian June 18, 2014

Hellgate Elementary Missoula County Public Schools (MCPS)

Hellgate Elementary High School Costs = $30,000, Mill Value = $30, Missoula County Public Schools (MCPS) High School Costs = $78,000, Mill Value = $183, K-12 School Expansion Discussion… Topics & Areas to Cover “The MCPS high school district needs a minimum of $28 million to cover its maintenance, safety and technology needs. Actual building work would cost $66 million, although a long-range planning committee recommended a budget of about $50 million. That would add $60 a year to the $200,000 home's property taxes.” Missoulian June 18, 2014

Hellgate Elementary Missoula County Public Schools (MCPS)

Hellgate Elementary High School Costs - $30,000, Mill Value = $30, Missoula County Public Schools (MCPS) High School Costs - $78,000, Mill Value = $152, K-12 School Expansion Discussion… Topics & Areas to Cover “The MCPS high school district needs a minimum of $28 million to cover its maintenance, safety and technology needs. Actual building work would cost $66 million, although a long-range planning committee recommended a budget of about $50 million. That would add $60 a year to the $200,000 home's property taxes.” Missoulian June 18, 2014

Hellgate Elementary Missoula County Public Schools (MCPS)

Hellgate Elementary High School Costs - $19,500, (state debt service GTB assistance of 35%) [ MCA] 1.Mill Value = $30, Missoula County Public Schools (MCPS) High School Costs - $78,000, Mill Value = $155, K-12 School Expansion Discussion… Topics & Areas to Cover “The MCPS high school district needs a minimum of $28 million to cover its maintenance, safety and technology needs. Actual building work would cost $66 million, although a long-range planning committee recommended a budget of about $50 million. That would add $60 a year to the $200,000 home's property taxes.” Missoulian June 18, 2014

Hellgate Elementary Missoula County Public Schools (MCPS)