MEPCO Update (11/15/07 revision) TC Meeting - November 16, 2007.

Slides:



Advertisements
Similar presentations
In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
M A R K E T S D E V E L O P M E N T SWCT LICAP Zone Recommendation FERC Compliance Filing – July 2, 2004 NEPOOL Markets Committee June 23, 2004 Mark Karl.
FPLs Request for Recovery of the Costs Associated with the Seabrook Transmission Substations Pool Transmission Facilities NEPOOL Participants Committee.
Revaluation of non-current assets
Calculating Utility Allowances Michael Kotin Kay-Kay Realty Corp
The Midwest ISO from a Transmission Owner Perspective.
RXQ Dual Billing Process Flow Distribution Company Supplier Customer Distribution Company reads meter(s) ( ) Supplier receives and processes.
Business Practices Subcommittee Update August 17, 2010.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
E-Tariff - The Problem with Joint and Shared Filings Presented by National Grid NAESB E-Tariff Conference Colorado Springs January 23-25, 2008.
NAESB Coordinate Interchange
RXQ Dual Billing Process Flow Distribution Company Supplier Customer Distribution Company reads meter(s) ( ) Supplier receives and processes.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Western Electricity Coordinating Council Market Interface Committee Report to the WECC Board of Directors December 6-7, 2007 Robert D. Schwermann MIC Chair.
Unscheduled Flow Administrative Subcommittee Report David Lemmons March 27, 2013 Salt Lake City, UT.
Presented to the WECC MIC June 15, 2007
Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011.
FPL Proposal for a Florida Renewable Portfolio Standard FPSC Staff Workshop December 6, 2007.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
FERC Order minute Scheduling.
Parker-Davis Project FES Contract Amendment January 16, 2004.
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Summary of Proposed Market Rules For Transition Period Price-Responsive Demand and Active Demand Resources in the Forward Capacity Market Henry Yoshimura,
DECEMBER 17, 2013 | WESTBOROUGH, MA Reliability Committee & Transmission Committee & Markets Committee Capacity Zone Modeling Al McBride MANAGER, AREA.
© 2005 KPMG IFRG Limited, a UK registered company, limited by guarantee, and a member firm of KPMG International, a Swiss cooperative. All rights reserved.
LACPA ISA Presentation
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
OCTOBER 8, 2014 Bob Laurita INTERNAL MARKET MONITORING New Import Capacity Resource FCM Market Power Mitigation Order to Show Cause Compliance Filing.
Subsidy Types, their impacts on tariff and ways of treating them.
Federal Energy Regulatory Commission Large Generator Interconnection Order on Rehearing (Order No A) RM March 3, 2004.
Amendment 3/5 Workshop.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
Transmission Congestion on the Delmarva Peninsula December 17, 2003 PA
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
WINDPOWER 2003 Austin, TX May 18-21, 2003 Session 4A: Regulatory Issues Monday May 19, :40-5:00 pm Wind Generation Interconnection to Transmission.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
1 Interconnection Update Jay Zimmerman Manager, Transmission Policy Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Standards Review Subcommittee Update August 17, 2010.
Retail Rates Update WIEG Board Meeting May 6, 2010 WIEG Board Meeting May 6, 2010 Presented by: Kavita Maini, Principal KM Energy Consulting, LLC.
Unit-Specific Bid Limits based on Modified Generic Cost.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
1 WSPP EC SLIDES FOR AGENDA ITEMS 3 AND 4 WSPP SERVICE SCHEDULE C WSPP Service Schedule C includes a provision allowing interruption “to meet Seller’s.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
1 TAC Report to the ERCOT Board February 16, 2005.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
Philippine Feed-In Tariff System Implementation 1.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
2009 ERCOT CSCs and Congestion Zones (10/8/08) C. Richard Ross American Electric Power Service Corporation.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
RTO WEST Summary of RTO West 9/18/02 Declaratory Order Presentation to The Committee on Regional Electrical Power Cooperation (CREPC) by John Carr 10/1/02.
Alliance Update Illinois Commerce Commission Electric Policy Committee July 10, 2001.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
Wind Management at MISO
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Clarification of the Resident Load Definition
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Pseudo-tie business procedure
Rates & Regulatory Updates
Pseudo-tie business procedure
Presentation transcript:

MEPCO Update (11/15/07 revision) TC Meeting - November 16, 2007

MEPCO Update (11/16, 2007) © 2005 ISO New England Inc. 2 FERC Order Accepting Tariff Revisions On October 29, 2007, the FERC conditionally accepted the MEPCO Roll-In Proposal (filed jointly by the ISO, MEPCO and the PTOs, collectively the Filing Parties) to treat the MEPCO transmission facilities as Pool Transmission Facilities (PTF) ER conditions are described (see paragraphs 35-42)

MEPCO Update (11/16, 2007) © 2005 ISO New England Inc. 3 October 29 Order Conditions Modify the associated provisions to be in compliance with Order 890 (PP35-37) –Eliminate the 30-day notice provision for MEPCO approving customer reassignments (P36) –Eliminate existing price cap for reassignments by grandfathered right holders (P37) –Include a five-year term for rollover rights (P37) Modify date for electing grandfathered treatment to ten business days after the date of the issuance of the October 29 Order (P38)

MEPCO Update (11/16, 2007) © 2005 ISO New England Inc. 4 October 29 Order Conditions (cont.) Provide Casco Bay with an option comparable to the grandfathering option provided to MEPCOs other long-term firm point-to-point customers (P39) In exchange for the $800,000 that Casco Bay pays to MEPCO, provide Casco Bay with a hedge against congestion and marginal losses (P40) –The October 29 Order does not describe the nature of these hedges –The ISO and MEPCO believe that the finding of hedges is not supported by the record and may be substantively incorrect, and is considering seeking rehearing on this point

MEPCO Update (11/16, 2007) © 2005 ISO New England Inc. 5 October 29 Order Conditions (cont.) Preserve Casco Bays existing rights, with the exception that they become subject to the same scheduling and curtailment rights as other grandfathered agreements (PP41) –October 29 Order is not clear as to whether (or how) to apply the same scheduling and curtailment rights to Casco Bay as are applied to internal or external grandfathered agreements If external scheduling and curtailment rights are applied to Casco Bay, this would be inconsistent with existing treatment of Casco Bays Maine Independence Station (MIS) Filing Parties are directed to revise tariff sheets to state that they will become effective on November 1, 2007 (PP42) –On October 31, the Filing Parties requested expedited clarification or, in rehearing, to change the MEPCO Roll-in Proposal effective date from November 1, 2007 to December 1, 2007

MEPCO Update (11/16, 2007) © 2005 ISO New England Inc. 6 Related Informational Filing On November 14, ISO submitted an informational report to update the Commission on changes being made to the Loss Component calculation for the Graham Node in the Maine Load Zone on the New England market system –ISO made this filing because the change relates to the findings made and the compliance requirements imposed in the October 29 Order (specifically, Casco Bays hedge against marginal losses) Under Schedule 20B and the ISO OATT, Casco Bay is responsible for MEPCO real power losses and any losses associated with other transmission service under the OATT

MEPCO Update (11/16, 2007) © 2005 ISO New England Inc. 7 Related Informational Filing (cont.) Recognizing: a)that a significant portion of the MIS output flowed over the MEPCO lines as well as 115-kV PTF, b)Casco Bays liability under the Casco Bay TSA to pay for MEPCO real power losses and any losses associated with other transmission service under the OATT, and c)the MR1 Loss Component definition pertaining to marginal losses and its exclusion of double collection (see below) ISO staff took steps in preparation for 3/1/03 SMD market implementation to take into account the anti-double-collection concerns by treating the Graham Node as though it were an equivalent non-PTF Node and mapping the Loss Component for the Graham Node to the Loss Component calculated for Maine Yankee Node –Under MR1 definition, the Loss Component…of the nodal LMP at a given Node on the non-PTF system reflects the relative cost of losses at that Node adjusted as required to account for losses on the non-PTF system already accounted for through tariffs associated with the non-PTF –The Graham Node was mapped to utilize the Maine Yankee Loss Component due to its proximity of the MIS to the MEPCO system and Casco Bays liability for real power losses under its TSA

MEPCO Update (11/16, 2007) © 2005 ISO New England Inc. 8 Related Informational Filing (cont.) Stakeholder statements made during MEPCO Roll-in Proposal discussions raised concerns by other ISO staff about the foregoing loss-mapping solution As part of the resulting investigation: –ISO and MEPCO each recently learned that the other had not been collecting losses from Casco Bay; therefore, no double collection was at issue –ISO determined that while, as a matter of electrical location and given the proximity of the MIS to the MEPCO system, the Graham Node is analogous to a node on a non-PTF (i.e., MEPCO) system, it is in fact a PTF node; therefore, the double-counting limitation of the Loss Component language, strictly speaking, does not apply to that Node

MEPCO Update (11/16, 2007) © 2005 ISO New England Inc. 9 Related Informational Filing (cont.) In practical terms, this mapping of the Graham Node had three relevant impacts on the New England markets –Since neither the ISO nor MEPCO were charging Casco Bay for losses, the MIS was not paying anything for PTF or MEPCO losses over for the transmission of MIS power from the Graham substation to the Maine Yankee substation –Load in the energy market throughout New England has paid for this favorable treatment for Casco Bay/MIS via reconciliation within the loss revenue fund –The Maine zonal price paid by load has been slightly higher than it would have been if such losses had been reflected in the system model

MEPCO Update (11/16, 2007) © 2005 ISO New England Inc. 10 Related Informational Filing (cont.) As a result of the investigation and conclusions discussed above: –The ISO revised the system model so that the Loss Component calculated at the Graham Node is consistent with its physical location on the PTF system, (i.e., the MeY-Graham loss mapping was removed). As such, this change will slightly reduce Maine zonal prices –Given the finding in the October 29 Order that Casco Bay has a hedge against losses in the New England market system, the ISO is developing a mechanism (to be effective on 11/14/2007) to hold Casco Bay harmless from such losses, pending the Commissions consideration of and action on the any potential rehearing request This mechanism: –will be included as a part of a Commission filing, –as currently envisioned, would seek to hold Casco Bay/MIS harmless against marginal losses over the transmission path from Maine Yankee to Orrington (on the MEPCO-owned lines) while maintaining Casco Bays liability for real power losses on those lines Casco Bay has indicated that the above concept is what they intended as the stated hedge against losses

MEPCO Update (11/16, 2007) © 2005 ISO New England Inc. 11 Next Steps A filing is required on or before November 28, either: –in compliance with the October 29 FERC Order, or –explaining that the conditions contained in that Order are not acceptable, in which case the roll-in will not presently go forward As explained in the MEPCO Roll-In Proposal filing, the Filing was a fully integrated proposal and, accordingly, the Filing Parties made implementation expressly contingent upon Commission approval without modification –The Filing Parties are seeking input from the Transmission Committee, Casco Bay and other entities, including obtaining an understanding of what Casco Bay views as its congestion hedge –The Filing Parties are considering whether the conditions imposed in the October 29 Order are acceptable –If the roll-in does not go forward, it will be necessary to limit the dual MEPCO/NRI interconnection transfer capabilities to those that are currently in place for the New Brunswick external interface (max. of 700 MW N-to-S, and 280 MW S-to-N). –As described in the August 16 filing, the Filing Parties do not have an alternate mechanism that will provide for the administration of transmission service provisions across two parallel AC external ties, one of which is PTF and the other non-PTF (i.e., the single New England/New Brunswick external interface)