RSRDC UNIT-IV, JAIPUR. ORGANISATION CHART OF RSRDC UNIT –IV, JAIPUR R.E. Sh.S.S. Vijay ARE Sh. R.K. Vijay ARE Sh.M.K. Saini ARE Sh. Rajiv Sethi ARE Sh.

Slides:



Advertisements
Similar presentations
JULY JULIO AUGUST AGOSTO SEPTEMBER SEPTIEMBRE OCTOBER OCTUBRE NOVEMBER NOVIEMBRE DECEMBER DICIEMBRE LOS ANGELES UNIFIED SCHOOL DISTRICT DISTRITO ESCOLAR.
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
1 Yell / The Law and Special Education, Second Edition Copyright © 2006 by Pearson Education, Inc. All rights reserved.
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
RSRDC UNIT- II JAIPUR.
RSRDC UNIT-II JODHPUR.
Rajasthan State Road Development & Construction Corporation Ltd.
Worksheets.
01 Prologo 02 Bran 103 Catelyn 1 05 Eddard 1 04 Daenerys 1 06 Jon 1 07 Catelyn 2 10 Tyrion 1 08 Arya 1 16 Sansa 1 09 Bran 2 11 Jon 2 12 Daenerys 2 13 Eddard.
1_Panel Production. 380 pannelli 45 giorni di produzione = 8.4 pannelli/day.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
1) a) H = 2.06%, S = 32.69%, O = 65.25% b) Ca = 54.09%, O = 43.18%, H = 2.73% 2) 24 x x x.112 = ) a) g/mol, b) g/mol.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Disability status in Ethiopia in 1984, 1994 & 2007 population and housing sensus Ehete Bekele Seyoum ESA/STAT/AC.219/25.
CALENDAR.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
1 A B C
Break Time Remaining 10:00.
This module: Telling the time
The basics for simulations
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
We are learning how to read the 24 hour clock
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
© 2012 National Heart Foundation of Australia. Slide 2.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Subtraction: Adding UP
: 3 00.
5 minutes.
Types of clocks. Types of clocks Sand clock or Hourglass clock.
Januar MDMDFSSMDMDFSSS
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
PSSA Preparation.
Fourth Quarter Oklahoma Data (October-December 2011)
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Welcome to the Jurisdiction
RSRDC UNIT- II, AJMER.
RSRDC UNIT- III JAIPUR. ORGANISATION CHART RE Sh. A.M. Khan ARE Sh. Rajesh Gupta ARE Sh. S.K. Chejara ARE Sh. V.B. Mathur ARE Sh. Rakeev Gupta JEN Smt.
RSRDC UNIT - KOTA. ORGANISATION CHART OF RSRDC - UNIT KOTA.
ORGANISATION CHART OF RSRDC UNIT-GURGAON RE SH. SUKESH MATHUR ARE SH. UMESH KUMAR GARG ARE SH. J.M. MITTAL ARE SH. R.D. MEENA ACCOUNTANT SH. SANT LAL.
Presentation transcript:

RSRDC UNIT-IV, JAIPUR

ORGANISATION CHART OF RSRDC UNIT –IV, JAIPUR R.E. Sh.S.S. Vijay ARE Sh. R.K. Vijay ARE Sh.M.K. Saini ARE Sh. Rajiv Sethi ARE Sh. Surendra Singh ARE Sh. S.S. Mathur ARE Sh. S.K. Shukla A.A.O. Sh. Jagmohan Sharma

Financial Work Load in Unit-IV, Jaipur S. No. Name of WorkClient Deptt.A& F SanctionExpenditure till date Balance Work 1. ARE –Sh.R. K. Vijay 1ROB DausaPWD Raj ARE –Sh. S.K. Shukla 1ROB GangapurPWD Raj Police line & ADM Block KarauliHome deptt Jail Building KarauliHome deptt ARE –Sh. M.K. Saini 1112 LSQ at RPAHome deptt ARE- Sh. S.S. Mathur 124 LSQ & 12 USQ BaniparkHome deptt USQ PratapnagarHome deptt ARE-Sh. Surendra Singh 112 USQ MansarovarHome deptt Total Rs. In Lacs

Corporate Bhawan, JAIPUR Completion Cost – Rs Crs. Inaugurated by Honble Minister of Corporate Affairs on Important Works Completed during last 5 years

New Hospital Block,Chark Bhawan, JAIPUR Completion Cost – Rs Crs. Inaugurated by Honble Chief Minister Rajasthan on Important Works Completed during last 5 years

Double storey Basement Parking, SMS hospital, JAIPUR Completion Cost – Rs Crs. Inaugurated by Honble Chief Minister Rajasthan on Important Works Completed during last 5 years

12 nos LSQ at Shiprapath Thana, JAIPUR Completion Cost – Rs lacs Important Works Completed during last 5 years

POLICE HOUSING SCHEME No. of Quarters:112 Nos. LSQ Total Cost:Rs lacs Location:RPA Shastri Nagar Date of Start: Stipulated Date of Completion: Expenditure till Date: lacs Likely Completion date: Bottlenecks if any:Electric work & water supply from sousce to be connected

POLICE HOUSING SCHEME No. of Quarters:24 Nos. LSQ & 12 Nos USq Total Cost:Rs lacs Location:Banipark Thana campus, Jaipur Date of Start: Stipulated Date of Completion: Expenditure till Date:84.63 lacs Likely Completion date:USQ will completed nos LSQ Bottlenecks if any:Land for 12 nos USQ allotted on & order of 12 nos LSQ given on and land for 12. LSQ still awaiting

POLICE HOUSING SCHEME No. of Quarters:196 Nos. LSQ Total Cost:Rs lacs Location:Jail Building Karauli Date of Start: Stipulated Date of Completion: Expenditure till Date: Rs lacs Likely Completion date: Bottlenecks if any:water supply line to be provided & water supply shall be provided by PHED after laying 4.00 Km length pipe line from Karauli so revised estimate submitted for Rs lacs by PHED

POLICE HOUSING SCHEME No. of Quarters:Adm Block, 100 men barracks, 4 nos LSQ & 2 nos USQ Total Cost:Rs lacs Location:Police line and Adm Block Karauli Date of Start: Stipulated Date of Completion: Expenditure till Date: Rs lacs Likely Completion date: Bottlenecks if any:water supply shall be provided by PHED after laying 4.00 Km length pipe line from Karauli

POLICE HOUSING SCHEME No. of Quarters:12 nos USQ Total Cost:Rs lacs Location:Mansarovar Thana, Jaipur Date of Start: Stipulated Date of Completion: Expenditure till Date: Rs lacs Likely Completion date: Bottlenecks if any:

POLICE HOUSING SCHEME No. of Quarters:12 Nos. USQ Total Cost:Rs lacs Location:Pratapnagar Thana campus, Jaipur Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs lacs Likely Completion date: Bottlenecks if any:

1.Name of Work : ROB Dausa Total Cost:10.00 Crores Location:Dausa city Date of Start: Stipulated Date of Completion: Expenditure till Date: lacs Likely Completion date: December -10 Bottlenecks if any : Estimate was Revised due to increasing number of viaduct as per demand of public representative. Revised estimate of Rs lacs send to CE PWD vide Addl. Chief PWD Zone – I, Jaipur letter no 2330 dt Note: Bar Chart for complete work shall be prepared after receiving of Revised A&F sanction

2. Construction of ROB Gangapur Total Cost:10.00 Crores Location:Gangapur city Date of Start: Stipulated Date of Completion: Expenditure till Date: lacs Likely Completion date: April -10 Bottlenecks if any : Estimate was Revised as bearing capacity is less to provide masonry retaining wall so RCC wall is proposed. Revised estimate of Rs lacs send to CE PWD vide Addl. Chief PWD Zone – II, Jaipur letter no 2689 dt Note: Bar Chart for complete work shall be prepared after receiving of Revised A&F sanction