LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev May 7, 2007.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and.
LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
LQ Winding and Curing Tooling Internal Review F. Nobrega, N. Andreev April 9, 2007.
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
WOOD JOINTS Items to consider when choosing a wood joint.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Engineering 28 University of California Lecture # 9 –Orthogonal projection –Multi-view presentation –Third-angle projection –First-angle projection.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
1 Tests to Determine Lengths during Reaction of LQ cable R. Bossert, F. Nobrega, N. Andreev, G. Ambrosio, I. Novitski
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Types of Threaded Fasteners.  Used to hold parts together  Clearance holes in parts  Nut on other end  Can also be used with a threaded hole.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
LATHE MACHINE OPERATION - FACING
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
LQ03 Titanium Pole Length Study Fred Nobrega LQ Collaboration Video Meeting June 27, 2008 BNL - FNAL - LBNL - SLAC.
Traditional Fixtures & Fittings 1 J. Byrne Fixtures & Fittings J. Byrne
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
Make a Gas Cylinder Cooker. © G. Norris 2011 Copyright This document and the information contained within is copyright to © G. Norris Reproduction.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
Main Parts of a Drilling Machine
LARP Collaboration Meeting Racetrack Coil Fabrication
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Magnet Fiducialization.
Drilling machine. Introduction Drilling is a metal cutting process carried out by a rotating cutting tool to make circular holes in solid materials. Tool.
Learning Objectives • Create sweep features. • Create lofted features.
MANUFACTURING TECHNOLOGY UNIT – V Machine Tools. Manufacturing Technology.
L/R Coil Asymmetry Coil Fabrication Working Group Trey Holik Wednesday, June 3 rd 2015.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
ENM208 INTRODUCTION to MACHINING ANADOLU UNİVERSITY Industrial Engineering Department.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
QXF Coil working group 2/11/16 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Coil Fiducialization Proposal.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
1 LHC Hi-Lumi QXF Proposal for Coil Impregnation M. Anerella, J. Schmalzle, P. Kovach June 11, 2015.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Assembly of the doorknob
Fixture.
QXF Coil Fabrication & Tooling Reaction / Impregnation
Coil Design and Fabrication
TQS Overview and recent progress
FRESCA2 Update on the dipole design and new calculations
STEP 1: ASSEMBLE ANGLE PLATES
Internal review of the 11T dipole reaction fixture and impregnation mould Outcome of the meeting F. Savary 19 October CERN.
880V 21/2”-10”.
Coil Fabrication Status
Presentation transcript:

LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev May 7, 2007

This review is for the LQ reaction and impregnation tooling. Successful completion of this review will mark the beginning of detailed part drawings to be made from the completed solid model. The tooling design addresses design concerns, including possible misalignment of the inner and outer coils during fabrication. Although misalignment has not been confirmed at this time, alignment features have been incorporated nonetheless. Alignment can be maintained using pins throughout the coil reaction/impregnation fabrication process. LQ React/Impreg Review May 7, 2007 F. Nobrega, N. Andreev 2

Reaction and impregnation tooling for LARP’s long quadrupole (LQ) is a blend of TQ reaction tooling and the long dipole mirror (LM) tooling. The LM tooling is a length scale up of the 1m dipole magnet. Two long coils have been fabricated, the second used in LM01. Dipole tooling does not use gas channels or passage ways and does not use coil alignment. Harmonic measurements of 4 dipole magnets that utilized this tooling philosophy can be found at: V.V. Kashikhin et al., “Field Quality Study in NB3SN Accelerator Magnets”, PAC05_TOAA004. The 6 m LHC curing mold tooling will be used for LQ coils. LQ React/Impreg Review May 7, 2007 F. Nobrega, N. Andreev 3

Tooling Features Tooling blocks, 2” lam’s. Inner coil. Outer coil suppressed for clarity. Side alignment bars. Protective shell. End plates. 4

2.0General design. It is our consensus that unless the cured coil is held together in such a way as to keep the cross-section close to the cavity shape defined by the solid mandrel section, it will be difficult to “coax” the cured coil into the fixed cavity. Note: Depending on how the cured coil is fixtured and lifted onto the reaction fixture mandrel, the coil tends to spring out in its free state. We have seen this in the TQ coils as we unbolt them from their shipping skeleton. As the coil is lifted over to the reaction mandrel assembly in its ”sprung” condition, the mid-plane corners will contact the sides of the mandrel cavity and will slide down those sides as the coils are lowered or pushed in place. How the cured coil will be fixtured and rigged to be lifted onto the reaction fixture is a crucial process in maintaining the integrity of the coil. 3.0Comments and concerns to updated STEP model – received 4/30/07 Note: Mandrel is now segmented instead of 1-piece. Also incorporates a top-center slot to index the pole segments. 3.1(Same as Item 1.1) 3.1.1It is assumed that there are shoulder bolts or pins through all the layer 1/layer 2 pole segments and engaging the top-center slot in the mandrel blocks. 3.2(Same as Item 1.2) 3.3(Same as Item 1.3) 3.4(Same as Item 1.4) 3.4.1Introduce 2 machined cavities (rectangular keyways) running longitudinally on either side of the center key protrusion of the mandrel blocks to form continuous, longitudinal passages. 5 LQ REACTION TOOLING DESIGN REVIEW COMMENTS Ray Hafalia, Roy Hannaford, Dan Cheng & Dave Beck 5/2/07 1.0Comments and concerns to original STEP model – received 4/11/ Missing: Indexing features in mandrel and cavity blocks to index all layer 1 and layer 2 pole segments centered. There appears to be only one center-pin feature through mandrel and part , baseplate Partly addressed in 4/30/07 version with center- slot feature in mandrel block. 1.2Missing: Stop-blocks for end shoes (both ends) 1.2.1To keep end shoes sliding sideways or too far longitudinally. 1.3Missing: support clamp blocks for coil out-leads Channeled clamp-block to hold out-leads (like TQs) but imparts no longitudinal constraint. 1.4Missing: Gas passages to coil surfaces. 1.5Solid, 1-piece mandrel – not practical - hard hold tolerances on profile along whole length 1.5.1Addressed in 4/30/07 version by segmented mandrel blocks. 1.6Cut sheet metal reaction shield short along long edge so it will allow closure of fixture. LQ React/Impreg Review May 7, 2007 F. Nobrega, N. Andreev

Unbolt and remove winding mandrel assembly. Note:The coils’ pole segments are bolted onto the winding mandrel assembly from the top. This “upside- down” orientation makes it impossible to unbolt the winding mandrel assembly – unless features and thru-bolt fasteners are introduced to allow disassembly from the bottom Then install the 3-piece reaction mandrel components – first with the side-sector segments against the coils’ midplane surfaces and, then, the cylindrical mandrel blocks Install the reaction baseplate and then draw the mid-block bolts up to squeeze and close the assembly. 4.2Possible Solution # Eliminate second layer pre-curing After winding layer 2 over the pre-cured first layer, assemble reaction fixture components Install the 2 reaction mandrel sector segments Install sheet metal reaction shield Lift whole assembly, winding mandrel and all, rollover, then place into the inverted, pre-assembled cavity block assembly Remove the winding mandrel components – assuming they had been modified so that the components can be disassembled from the bottom After removing bore winding mandrel segments, replace with the reaction bore segments Assemble the rest of the reaction fixture to close the assembly It may be necessary to place the assembly in the press to properly close the fixture Drill holes/passages at suitable angles thru cylindrical portion of the mandrel block (beneath the layer 1 pole segments – into top-center slot) into these longitudinal/keyway passages to route argon gas into the bore surface areas to “scrub”/push reaction gases out through the fixture Drill & tap endplates, for the stainless steel Swagelok fittings, in line with the longitudinal passages. 3.5Redesign mandrel blocks and cavity blocks for full, semi- circular profile Change design of mandrel blocks to a 3-piece design Central, cylindrical piece sector segments – i.e., curing tooling sector pieces See Item General Design Note:(Same as Item 2.0) 4.1Possible Solution # Pre-assemble and align the mid-blocks and sheet metal shield. Set upside-down (cavity–up) Bring the cured coil directly from the curing oven (upside-down and still secured and held intact in the winding mandrel assembly) and set into the mid-block assembly cavity LQ React/Impreg Review May 7, 2007 F. Nobrega, N. Andreev

Base program 1 m quadrupole single cavity reaction and impregnation fixture. 7 LQ React/Impreg Review May 7, 2007 F. Nobrega, N. Andreev

8 TQ coil #11 assembled into single cavity tooling. LQ React/Impreg Review May 7, 2007 F. Nobrega, N. Andreev

Cured TQ coil #11 placed into tooling May 2, Assembly demonstration showed a relaxed coil pair can be packaged into reaction tooling. 9 LQ React/Impreg Review May 7, 2007 F. Nobrega, N. Andreev

Illustration of coil handling & packaging, being developed, prior to heat treatment. LQ React/Impreg Review May 7, 2007 F. Nobrega, N. Andreev Winding tooling within roll over tooling Inverted coil. Remove handling tooling. Assemble. 10

Summary LQ reaction and impregnation tooling is an iteration of TQ and LM tooling. Design is compatible with existing tooling at Fermilab. LQ React/Impreg Review May 7, 2007 F. Nobrega, N. Andreev 11