HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples EXPERT LEVEL.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Getting the most out of your contracts Gary Traynor 11 th July 2013 Performance Monitoring Contractor.
1 The regulation of France Telecom Reference Interconnection Offer 27 january 2003.
1 of 21 Information Strategy Developing an Information Strategy © FAO 2005 IMARK Investing in Information for Development Information Strategy Developing.
Parallel Flow Visualization/Mitigation Proposal
1 Welcome Safety Regulatory Function Handbook April 2006.
Transparency and Domestic Regulation Mina Mashayekhi Division on International Trade UNCTAD.
Dispute Settlement in the WTO
Planning and use of funding instruments
THE CERTIFYING AUTHORITY
The Managing Authority –Keystone of the Control System
UNFCCC secretariat, programme Fleur Newman, Programme Officer Breakout session 4.2 Procedure on significant deficiencies CMP & EB Mandates and 2012 Process.
International Telecommuniction Regulations 1 WG-ITR Council Working Group on ITRs General Overview Alaa M. Fahmy Chairman.
1 The regulatory context for fixed mobile interconnection A presentation to the ITU workshop David Rogerson Principal Consultant September 2000.
Vientiane, Lao Peoples Democratic Republic, July 2012 ICT Standardization Challenges in Viet Nam Le Duc Cuong, Official of Vietnam Telecommunications.
1 ITU Interconnection Workshop 17 August 2001 Role of the Regulator K S Wong Office of the Telecommunications Authority Hong Kong, China.
The ADQ Adventures of LFV by Roger Li, Group Manager AIM 28th of May, Brussels.
Copyright © 2012 California Department of Education, Child Development Division with WestEd Center for Child & Family Studies, Desired Results T&TA Project.
1.How long have you been married? 2.What is the best part about being married? 3.What is the most challenging part of being married? 4.How do you resolve.
0 - 0.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Project Appraisal Module 5 Session 6.
SADC Course in Statistics Producing a product portfolio Module I3 Session
© 2006 TDA Development Draft and subject to amendments from consultation Performance Management Challenge for Schools PM workshops 23 October 2006.
Prepared By: A.M. Al-Ashwal Project Advisor OFF GRID 1.
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
International Telecommunication Union HIPSSA Cost model training workshop: Session 5: Cost Standards and their Application EXPERT LEVEL TRAINING ON TELECOM.
POLICY AND OVERSIGHT DIVISION (POD) February 2014 Documentation of Evaluation for Award 1.
IHPA and the National Efficient Price (NEP) Independent Hospital Pricing Authority.
1 The interconnection of business registers Judit Fischer – DG Internal Market and Services Budapest, 14 June 2010.
2 1.Client protection principles 2.Principle #6 in practice 3.The client perspective 4.Participant feedback 5.Tools for improving practice 6.Conclusion.
SAI Performance Measurement Framework
HIPSSA Cost model training workshop: Sessions 13-14: using the training cost model as part of a hypothetical regulatory procedure to establish costs and.
HIPSSA Cost model training workshop: Session 2: The Place of Cost Modelling in the Regulatory Process EXPERT LEVEL TRAINING ON TELECOM NETWORK COST MODELLING.
1 Monday 14 March 2011 Windhoek, Namibia Charley Lewis ITU Expert Validation Workshop Session 2.3: Gap Analysis: Existing legislation and regulation in.
IFE-CASC long term auctions Project status Implementation Group Meeting - Lisbon,
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
1 The Data Protection Officer at work Experience, good practices and lessons learnt Pierre Vernhes – former DPO at the Council of the EU Workshop on Data.
WP3: Fixing RES-H/C targets Lukas Kranzl, Andreas Müller RES-H Policy Kick-off, October 2008.
Addition 1’s to 20.
1 Project Nexus Modelling costs and benefits Andrew Wallace, Cesar Coelho Ofgem Project Nexus IA Subgroup 25 July 2012.
Mark Radford, Partner, Colin Biggers & Paisley, Australia Conflicts of interest faced by reinsurance brokers and duties owed by producing and placing brokers.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
1 A risk-based approach to auditing procurement in English councils Mark Wardman Senior Manager Audit Commission 19 May 2014.
Member Training ALARM South East - November 2007 Abigail Simpson and Bob Ellison.
Test B, 100 Subtraction Facts
HIPSSA Cost model training workshop: Session 11: The regulatory process for cost accounting and cost modeling – what is involved and how should it to be.
1 Review of the EU regulatory framework for electronic communications Stephen Banable European Commission DG Information Society and Media ITU Conference.
HIPSSA Cost model training workshop: Session 8: Approaches to cost modelling – a practical exercise EXPERT LEVEL TRAINING ON TELECOM NETWORK COST MODELLING.
HIPSSA Cost model training workshop: Session 4: The 7 Habits of Highly Effective Cost Modelling EXPERT LEVEL TRAINING ON TELECOM NETWORK COST MODELLING.
David Rogerson, ITU Expert
HIPSSA Cost model training workshop: Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA.
Week 1.
NSW Work Health & Safety Act Module: H&S Committees – Roles and Functions 1.
Care and support planning Care Act Outline of content  Introduction Introduction  Production of the plan Production of the plan  Planning for.
Directie Toezicht Energie 11 Roadmap GRI NW Robert Spencer, NMa/DTe.
SITUATION OF MEDIATION IN LITHUANIA. FIRST STEPS TOWARDS MEDIATION  First initiatives to promote mediation came from the growing non-governmental sector.
Dr. Julian Lo Consulting Director ITIL v3 Expert
ENTELA SHEHAJ Albanian Energy Regulator (ERE) DOES MONITORING METHODOLOGY MATTERS? Electricity Market Monitoring in Albania.
© Copyright Incyte Consulting 2008 Establishing cost-based interconnection: regulatory challenges and solutions Presentation to Infofest conference Budva,
World Bank Institute Regional Workshop for Anglophone Africa on Auditing and Financial Accountability Addis Ababa KEY ISSUES IN CREATING AN EFFECTIVE INTERNAL.
HIPSSA Cost model training workshop: Session 15/16: Country by country analysis in the East Africa Region EXPERT LEVEL TRAINING ON TELECOM NETWORK COST.
HIPSSA Cost model training workshop: Sessions 9-10: Manipulating data and assumptions in a bottom-up model EXPERT LEVEL TRAINING ON TELECOM NETWORK COST.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
ITU training workshop on Strategic Costing and Business Planning for Quadplay Session 16: Practical exercise 6 – tying it all together ITU ADVANCED LEVEL.
Jerker Torngren 4. USO in Serbia Some personal recommendations Jerker Torngren 1.
HIPSSA Cost model training workshop: Session 6: Calculation of call termination costs using different cost concepts EXPERT LEVEL TRAINING ON TELECOM NETWORK.
Workshop on Fixed-Mobile Interconnection PART III Interconnection conflicts : The Moroccan case Geneva, September 2000.
David Rogerson, ITU Expert
Presentation transcript:

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples EXPERT LEVEL TRAINING ON TELECOM NETWORK COST MODELLING FOR THE HIPSSA REGIONS Arusha July, 2013 David Rogerson, ITU Expert 1

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples 3 Agenda Aims and objectives for this session Review some real-life cost model experiences Assess the good and bad points of each Learn from other people’s mistakes!

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples Points of note  All cases are true to real- life as experienced by ITU’s consultants.  The details are confidential so references to specific clients have been removed  The authors bear no responsibility for any similarity with your own country! 4

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples Cost modelling steps – six of the best 5 Legal basisMethodologyData sourcing Consultation Timelines Confidentiality Spot the link with the 7 habits described in Session 4!

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples Case study 1 – Country X  Major regulatory investment for:  incumbent to prepare separated regulatory accounts  regulator to construct bottom-up LRIC models  After 18 months of work the results from the two processes are compared and found to conflict substantially  Regulator takes the following action:  Chairman meets CEO of Incumbent  “Gentleman’s agreement” is reached not to introduce cost model results, and the incumbent agrees to have the separate accounts audited  Interconnection rates are determined by regional benchmarks 6

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples 7 What went well?What went badly? How could a better outcome have been achieved? Group discussion – from the regulator’s perspective

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples Case study 2 – Country Y  Regulator has appointed consultants to help it develop cost-based termination rates:  A methodology is proposed and put to consultation  Data is requested from all operators, but supplied by only one operator (second largest mobile operator)  Models constructed and cost-based rates proposed  Results were open to consultation but models were not made public because of data confidentiality  Incumbent operator takes the following action:  It challenges the validity of the process since insufficient time was given for data submission, inadequate data was used in the model, and the model has not been made public. 8

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples 9 What went well? What went badly? What should the regulator now do to resolve the situation? Group discussion – from the regulator’s perspective

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples Case study 3 – Country Z  Regulator establishes requirements for cost-based termination rates:  All operators to construct a FAC model file and file the results annually  The models are approved by the operator’s auditors and become the basis on which termination rates are set.  The system has been in place for several years and has resulted in continuous decline in mobile termination rates as call volumes have risen  All parties seem happy with the arrangements. 10

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples 11 What went well?What went badly? How could a better outcome have been achieved? Group discussion – from the regulator’s perspective

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples Case study 4 – Country A  Regulator publishes costing methodology that requires bottom-up and top-down LRIC models.  Consultants appointed on 4-month assignment to construct models for 1 fixed and 5 mobile operators.  Project is delayed by lack of data and difficulty of constructing so many different models.  After 18 months project is seriously over-budget and reconciliation of model outcomes proves impossible.  Regulator establishes “wish-list” prices and uses models as far as possible to justify the prices. 12

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples 13 What went well?What went badly? How could a better outcome have been achieved? Group discussion – from the regulator’s perspective

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples Case study 5 – Country B  Regulator constructs bottom-up LRIC model to set mobile termination rates for three mobile operators.  Prices are symmetrical based on “efficient operator” – the costs of the largest (70% market share operator).  After objections from the smaller operators the regulator contracts consultants to build a new model based on 33% market share operator.  The smaller operators complain again, arguing that each operator’s actual market shares should be taken into account in establishing asymmetrical rates.  Court hearings follow. 14

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples 15 What (if any) problem was there with the type of model? What (if any) problem was there with the way the model was used? Under what circumstances are asymmetrical rates justified? Group discussion

HIPSSA Cost model training workshop: Session 12: Common pitfalls in regulatory cost modeling – regional and international case study examples Conclusions  Cost models are tools rather than solutions in themselves.  Too many models can be confusing and contradictory.  Top-down models are easier to apply but bottom- up models give more room for considering different scenarios and sensitivities.  Decide which to best and then set sail with confidence … don’t give up or be blown off course by the prevailing winds. 16