Stormwater harvesting – standards, regulations and Industry practice Presentation to Recycle Water 2013 30 May 2013

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

The Committee and Research – Where are we and where might we be going?
Introduction to Concurrency Management. What is Concurrency? Chapter , F.S. requires Comprehensive Plans to adopt a concurrency management system,
Blacktown as a Water Sensitive City
PROMOTING A COORDINATED GROUNDWATER MANAGEMENT FOR LAGOS STATE: WAY FORWARD By PROFESSOR E.O. LONGE, PhD FACULTY OF ENGINEERING DEPARTMENT OF CIVIL & ENVIRONMENTAL.
BROMI Variations – An Industry Perspective
Stormwater harvesting in urban environments Overview of engineering practice 1 Results through Experience.
Stormwater Rulemaking Briefing US Environmental Protection Agency.
ENERGY FROM WASTE Local Policies and Impacts on Commercialisation.
Improving Water Quality: Controlling Point and Nonpoint Sources Chapter 15 © 2004 Thomson Learning/South-Western.
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
Upper Providence Township Stormwater Management MS4 Program.
1 RATE SETTING WORKSHOP February 23, RATE CHANGES In accordance with Section of the Charter Plan of the District, any proposed rate change.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
Florida Pilot Initiative for the Performance Approach to Measurement Systems Stephen Arms Florida Department of Health.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
1 Hydraulic Fracturing Regulatory Processes in Louisiana James H. Welsh Commissioner of Conservation.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Env 247 Overview of Stormwater Management March 1, 2011.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Environmental Management Systems An Overview With Practical Applications.
EMS Auditing Definitions
Water Stewardship: More than a Vision on Sustainable Water Management Sabine von Wirén-Lehr CEFIC TF Meeting Brussels,
Fort Bragg Cantonment Area Cape Fear River Basin LIDAR data have been used to create digital contours and topographic maps. 1.A Digital Elevation Model.
NPDES Compliance. NPDES Water Quality Issues for the Precast Concrete Industry.
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Resilient Water Infrastructure Claire Mortimer Manaaki Whenua Landcare Research.
Ohio Balanced Growth Program Best Local Land Use Practices Development Incentives Kirby Date, AICP, Cleveland State University.
Background and Overview Stormwater NPDES Compliance For New Developments.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Water Quality Reduction Trading Program Draft Rule Language Policy Forum January 29,
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
PERT Overview Federal Perspective Annual PERT Workshop February 7-9, 2012 Nevada Site Office Evelyn Landini, Contracting Officer Brookhaven Site Office.
1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.
Energy Curriculum Advanced Transportation Technology and Energy Initiative.
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
Protecting Drinking Water: The U.S. Safe Drinking Water Act Chapter 16 © 2004 Thomson Learning/South-Western.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Legislative Water Issues Task Force ( ) Utah Water Summit November 30, 2005.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Natural Gas Pipeline Permitting in Pennsylvania Mr. Andrew Paterson VP of Technical and Regulatory, Marcellus Shale Coalition August 1, | MARCELLUS.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
1 The Future Role of the Food and Veterinary Office M.C. Gaynor, Director, FVO EUROPEAN COMMISSION HEALTH & CONSUMER PROTECTION DIRECTORATE-GENERAL Directorate.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
NC Rules and Requirements: Certified Inspectors of Subsurface Systems NC Certified Inspector Training School.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Modernization of Municipal Wastewater Approvals Program Water Environment Association of Ontario – Utility Management Forum October 19, 2015.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Comprehensive Thinking and Planning
Future directions for recycling OzWater 2014 Paul Smith.
Optimising Stormwater Management BH:
Supervisor, RIDEM RIPDES Permitting Program
Comparing the implementation of risk based regulation in Australia
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Sacramento County Stormwater Quality Program
CONSTRUCTION REGULATIONS AND CODES
Sacramento County Stormwater Quality Program
Presentation transcript:

Stormwater harvesting – standards, regulations and Industry practice Presentation to Recycle Water May BH:

Overview Current status of stormwater harvesting in VIC Typical SWH project’s components & function Melbourne Water Guidelines for SWH diversion Overview Functional requirements Base flow & maintenance flow requirements Design examples Joint initiatives of Melbourne Water and IPWEA IVS – independent verification of stormwater treatment devices Stormwater Harvesting Guidelines Questions BH:

Definitions o Urban stormwater - “net increase in run off and decrease in groundwater recharge resulting from the introduction of impervious surfaces such as roofs and roads within urban development” o “Urban stormwater” is only available within the urban growth boundary o Base flow in waterways is not considered urban stormwater - no access to base flow will be permitted BH:

Interim allocation rules If stormwater is flowing to the sea via a drain, 100% of the stormwater may be harvested If stormwater is flowing to a stream from an existing development up to 50% of existing stormwater can be harvested for use and 50% is reserved for the environment If there is a scheme to harvest more than 50% of the resource a study is required to assess implications for the environment All stormwater generated from new development is available for harvesting BH:

Licensing The harvesting of water from Melbourne Water’s drains and waterways requires a licence under Section 51 of the Water Act BH:

Administration Stormwater harvesting schemes continue to be managed through voluntary application of national and state guidelines Relevant guidelines: Australian guidelines for water recycling: managing health and environmental risks (phase 2) - stormwater harvesting and reuse (NRMMC, EPHC et al. 2009) No compliance monitoring requirements (voluntary compliance) BH:

Stormwater Harvesting Scheme Major Components BH:

Need to set some definitions… BH:

Guidelines for Stormwater Harvesting on Melbourne Water assets Design, Construction & maintenance of diversion structures BH:

BH:

To assist stormwater harvesting proponents Melbourne Water has developed standard drawings and associated technical guidelines for the design, construction and maintenance of diversion structures for stormwater harvesting on Melbourne Water assets. The availability of these drawings and guidelines is expected to deliver the following benefits: To assist proponents and applicants in developing a suitable design likely to be supported by Melbourne Water To ensure that Melbourne Water’s operational and environmental requirements are met and the outcome is therefore consistent with stormwater harvesting principles. BH:

BH: Functional requirements reliable diversion of designed flow rates and volumes and uniform diversion rate control min hydraulic impact on the existing drainage system automatic operation and reliable performance (e.g. no moving parts) minimal risk of blockage minimum maintenance requirements safe access for inspection, maintenance and cleaning allowance for flow calibration and metering structural integrity prescribed flow is being passed through (environmental and/or self-cleansing flows) ability to be isolated or shut off in case of maintenance requirement or pollution incident.

BH: Base flows and self-cleansing velocities For all new diversion structures constructed on Melbourne Water drainage assets, allowance should be made to pass low/base flows through the system both prior to and during times of flow diversion in order to avoid sediment deposition and associated maintenance problems in the drainage network. The minimum self-cleansing velocities for the design of these flows must be calculated on a case by case basis using the boundary shear stress approach. These calculations shall demonstrate that the design solution allows for the continuation of base flows through the system and that these flows produce the boundary bottom shear stress equal to or exceeding the pre-set minimal boundary bottom shear stress of τ ≥ 1.5 Pa.

Design Examples BH:

Design Examples BH:

(A)Independent verification scheme for stormwater treatment devices (B)Development of Storm Water Harvesting Guidelines – VIC BH: Current Industry Initiatives

Overview Joint initiatives of Melbourne Water and IPWEA Participation and support from Environmental Protection Authority Victoria (EPA Vic), Victorian Department of Health (DOH VIC), Victorian Civil Contractors federation, Storm Water Victoria, CSIRO, Monash Uni and other industry representative BH:

Independent verification scheme for stormwater treatment devices BH:

Project Objectives The overall aim of this project is to establish the regulatory and administrative framework, product testing and validation protocols and performance database for the storm water treatment devices to enable the better utilization and broader uptake of Integrated Water Cycle Management (IWCM) in Victoria BH:

Concept BH: a REGULATIONS ADMINISTRATION TECHNICAL

Jurisdiction and extent The proposed IVS is developed and implemented in the state of Victoria, Australia serving as a pilot for the broader National scheme. Devices covered by the scheme This Independent Verification scheme applies to pre-engineered, commercially- available technologies for storm water treatment. BH:

Development of Storm Water Harvesting Guidelines – VIC BH:

Project Objectives The objective of this project is to produce comprehensive guidelines for the practical implementation of storm water harvesting schemes in VIC as part of an Integrated Water Cycle Management (IWCM) approach. The resultant document has the potential to be included as an appendix to the new revision of Urban storm water best practice environmental management guidelines (BPEMG), adding consolidated knowledge from across Australia to the practical implementation of SWH schemes. BH:

Concept BH:

Conclusions Stormwater harvesting schemes continue to be managed through voluntary application of national and state guidelines with no regulatory compliance monitoring requirements Definitions and interpretations vary greatly across the industry No verification and/or validation requirements for performance Number of industry initiatives both at the state and National level Future directions BH:

Questions BH: