© 2007 E.ON Nexus AQ Requirements To support the current business processes We need to maintain performance and enable market operation as is using current.

Slides:



Advertisements
Similar presentations
Seasonal Normal Weather Base
Advertisements

Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
PN UNC Workgroup (AQ topic)
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
PN UNC Workgroup 20/9/11 Requirements Definition to Delivery.
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
Individual Meter Point Reconciliation. What? Calculation of actual energy used at meter point level for all supply points Allow sites to be accurately.
Mod 232 Anna Taylor Pricing Manager. 1 Mod 232 An alternative methodology for allocating unidentified energy Currently allocated by RbD entirely in SSP.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
SPA Enquiry Process - Additional Requirements for AMR sites ICoSS Presentation.
Gas Consumer Forum Project Nexus xoserve update 27th July 2009
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
PN UNC Workgroup Supply Point Register 25 th October 2011.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
AQ Tolerance Proposal Mod 209 – August Page 2Theme Date Department AQ Tolerances  Provide a view of appropriate tolerances for AQ validation 
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
PN UNC Workgroup Read Validation 4 th October 2011.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.
Use of AMR data Gareth Evans on behalf of Corona Energy.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
Development Workgroup 0282 Action 018 – impact on RbD 13 September 2010.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
Project Nexus UNC Workstream Consolidation of High-Level Principles Fiona Cottam 19 May 2010.
Customer Charge On behalf of all DNs 19 November 2010.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
UNC Modification Proposal 0202 National Grid Distribution
Options for Mod 640 Replacement
Rebecca Knight Mod 644 UIG Analysis.
Review Group 178 SSP as Domestic only.
Incentives 26 September 2018.
Impacts of Project Nexus Implementation Date to AQ17
Nexus Requirements To support the current business processes
Mod Proposal 0268 : AQ Backstop Date
Actions for Mod209 Workgroup
Genuine Reconciliation
AUG Query Responses 21st November 2013.
Modification proposal 330
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
MOD 640 INVOICING VALIDATION RULES
Modification 421 – Updates and Benefits Case
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
UNC Modification 0634 (Urgent) – Post Implementation Assessment
Modification Proposal 136
Actions Updates Action 0282/006 – Exclude from AQ process
Mod 209 – Rolling AQ.
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
REVIEW GROUP 178 – AN ALTERNATE SOLUTION
PN UNC Workgroup (AQ topic)
Enabling Large Scale Utilisation of Class 3
Presentation transcript:

© 2007 E.ON Nexus AQ Requirements To support the current business processes We need to maintain performance and enable market operation as is using current AQ process To enable movement to a fully smart/AMR world AQ will be less important if we move to meter point allocation on a daily basis, much as DM AQ is less important in the current framework To support interim processes through the change period Moving from the current annual process to enable AQ changes to more accurately reflect current consumption would be feasible through the introduction of rolling AQ, as defined in Mod 209

© 2007 E.ON12 October 2014, E.ON, Page 2 Allocation workshop has recommended daily allocation at a site level This may be using daily information supplied from the CCP This may use estimated daily allocation reconciled on a regular basis Where daily allocation takes place AQ will be less relevant Where any estimation is required (missing read information) then AQ would be likely to form the basis of any estimation process Any form of estimation using AQ would have the same issues as current profiling

© 2007 E.ON12 October 2014, E.ON, Page 3 AQ is a historic calculation and does not reflect changing consumption behaviour of consumers – this was particularly evident over the past 12 months of recession impact on LSP and energy efficiency within SSP  Rolling AQ would help ensure AQ was reflective of changing behaviour as soon as possible  Implementing Rolling AQ would enable benefits in the transition period  A fully AMR/Smart world could also feed into rolling AQ to ensure any estimation was based on current values