Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Hybrid Option(s) Ritchard Hewitt – August Fundamentals  Parameters – Cost Reflective, Incentive, Value  Cost – What does it cost the service provider.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
National Grid: Gas Transmission System Operator
Linepack ‘Park and Loan’ Quantity - Influencing Factors Review Group 291 – July 2010.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
RG0291 – NTS Licence SC27 – Balancing Arrangements Linepack – Commercial Considerations/Options Review Group 291 – 19 th July 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Transmission Planning Code – Design Margin Update Transmission Workstream, 4 th February 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Overrun price calculation
Review of System Alerts
Review Group 291- Ofgem Update
Review of UNC Section Q “Emergencies”
UNC Modifications 061 & 062 – An Overview
SO Incentives from April 2010
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Cashout actions and further considerations
Transmission Workgroup June 7th 2012
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – User Pays Options Review Group August th November.
Review Group 291- Ofgem Update
Ritchard Hewitt – September 2010
Draft Mod: Update of default System Marginal Prices
EU Balancing Code – Mod 494 Imbalance Charge Amendments
Entry Overrun Calculation
Ofgem presentation to Gas Transmission Workstream
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Topic - Cumulative Imbalance Deviation Transmission Workstream – 9 th November 2010

Outline  Introduction  Review Group 291 & considerations  Strawman – Cumulative Imbalance Deviation  Examples  Next steps

Introduction  C27 Licence obligation to consult and if appropriate, introduce a Linepack Product;  Cashout “Default System Marginal Prices (SMPs)” can be a proxy for User’s access to end-of-day NTS Linepack  System Operator (SO) Incentive to keep daily NTS Linepack change within 2.8 mcm – this restriction might be deemed an inefficient use of Linepack

Review Group 291 & considerations  RG291 has discussed operational and commercial issues with the potential removal of the Linepack Incentive (2.8mcm target)  National Grid supportive of greater NTS Linepack utilisation but mindful it has to balance the system within safe operational pressures in order to meet varying supply/demand patterns  Users may utilise NTS Linepack as a balancing tool leading to potentially greater swings and/or volatility in NTS Linepack usage  Key question is how to afford Users with the opportunity to utilise end-of-day NTS Linepack;  without compromising the safe, economic and efficient management of the system;  Targeting costs to Users

Strawman – Cumulative Imbalance Deviation  National Grid NTS continues to manage LP within set boundaries (calculated daily based on competing LP uses)  Users remain incentivised as required to balance - daily imbalances to be cashed-out at SAP  Introduce Users’ cumulative imbalance deviation (CiD):  Cleardown of Users’ cumulative imbalance by either rolling [5] Day period or, on a day when National Grid NTS takes a Market Balancing Action in either direction  New additional cashout charge based on:  CiD qty * fixed diff value or,  CiD * highest price in the event a Market Balancing Action is taken

Examples - CiD calculation  Notes:  Users’ rolling CiD imbalance ‘charged’ and reset to zero every [5] days or when National Grid NTS takes a Market Balancing Action  Receipts into Balancing Neutrality  Please see separate examples

Pros and cons  Pros  Afford Users with further opportunity to manage energy imbalances over several days;  CiD is not retrospective (does not change SAP or SMP prices) but does consider how the Users have utilised, and National Grid managed, the system over a rolling period  Regime change, not dependent on new ‘release’ mechanisms  CiD standalone or implemented with Linepack Product  Cons  Will require IS (UK Link) system changes to implement  Not based on an ‘auction’ mechanism

Next Steps  National Grid (through Joint Office) to facilitate additional Workshops to discuss / develop and agree business rules?  Raise development proposal?