DEP TRANSFORMATION Air Permit Review & Process. 2 ITEMS DISCUSSED Permit Format Streamlining of Compliance Plans Level of Monitoring Level of monitoring.

Slides:



Advertisements
Similar presentations
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
Advertisements

METAL COIL SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART SSSS May, CFR PART 63, SUBPART SSSS May, 2006.
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
METAL CAN SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART KKKK June, CFR PART 63, SUBPART KKKK June, 2006.
Air Permitting : Process Improvement Kaizen Event June 4 – 8, 2007 Transforming Government- the challenge and opportunity of the 21st century.
1 Copyright Electric Power Research Institute 2008 Steam Turbine-Generator Guidelines Quick Start VolumeContent 1General Practices Condition assessment,
Course Material Overview of Process Safety Compliance with Standards
Preparing for Compliance Monitoring Reviews Understanding CMS Protocols Used by Review Organizations January 14, 2009 Presented by: Margaret deHesse, RN,
Florida Department of Environmental Protection Air Resource Management Orange County Environmental Streamlining Task Force May 4, 2011 Air Resource Management,
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Florida Pilot Initiative for the Performance Approach to Measurement Systems Stephen Arms Florida Department of Health.
ICAO TECHNICAL COOPERATION PROJECTS IN INDONESIA 1973 to 2004.
Combined Heat and Power and Air Quality - Guidance for Local Authorities Ed Dearnley Policy Officer.
Standardized Authorizations (Permits by Rule & Standard Permits)
NCMA Workshop March 19 and 24, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Compliance Update NCMA 2015.
Air Construction Permitting Services Sarah Piziali, Construction Permit Section Supervisor.
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
NEGOTIATING ENVIRONMENTAL PERMITS Steven Lacoste Lee, Futrell & Perles, LLP September 2014 – University of New Orleans.
Blue Skies Delaware; Clean Air for Life Delaware’s Air Permitting Seminar 2008 Paul E. Foster, P.E. – Program Manager Delaware Department of Natural Resources.
Frank Steitz Air Quality Permitting Program 10/12/2012
Delivering sustainable solutions in a more competitive world GHG Mandatory Reporting Rule – Implications for PSD Review for GHG September 2012 Ramesh Narasimhan.
Title V Program Evaluations 1 st Round Overview Gregg Worley Section Chief Air Permits Section EPA Region IV.
A Proposal to Fund the Air Quality Bureau of the Iowa Department of Natural Resources Mick Durham.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
 Sign Inventory  Rule – 37.I  Types of signs Inventoried Outdoor Advertising Official and Directional Public Service Notice Service Clubs.
PERMITTING ELECTRIC GENERATING UNITS Jim Linville & Erik Hendrickson Air Permits Division.
NEW SOURCE REVIEW REFORM/SIMPLIFICATION JOHN A. PAUL STAPPA/ALAPCO MAY, 2002.
Where to find Information About Facilities. Overview of Title V Permits.
10/1/ Air Quality Permitting Air Quality Committee William D. Willets, P.E. Engineering Supervisor DAQ Permitting Section May 7, 2014.
Fire Emissions Joint Forum –Section 308 Strategies for Fire Coordinating efforts of states changing or developing smoke management strategies for regional.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
Guidance on Establishing Monitoring to Comply with CAM and Other Title V Requirements A Summary of Technical and Policy Materials Barrett Parker, EPA,
Air Permitting Update Yogesh Doshi ACE Academy New Jersey Department of Environmental Protection.
Flexible Air Permitting Innovation Done Right State-EPA Innovations Symposium Denver, CO January 24, 2006.
GHG BACT Analysis Case Study Russell City Energy Center May 2010 Donald Neal Vice President, EHS.
Clean Air Act and New Source Review Permits EPA Office of Air Quality Planning and Standards Research Triangle Park NC March
Best Available Retrofit Technology Rule - Colorado David R. Ouimette Colorado Air Pollution Control Division.
WRAP States Four Factor Reasonable Progress Lee Gribovicz WRAP IWG Meeting March 10, 2009.
Blue Skies Delaware; Clean Air for Life Common problems with draft applications Technical review Shaikh A. Tayeb, Ph.D., P.E. DNREC-Air Quality Management.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
1 Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba,
Title V, Preliminary Completeness Review. What do I need to do?  I need to find out if the application contains the required information.  Initial Title.
NSR and Title V Activities WESTAR Business Meeting May 2005.
Current State Issues in Title V Permitting Matthew A. Paque Environmental Attorney Supervisor Oklahoma Department of Environmental Quality Office of General.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Chisinau, October 28-31, 2008 Ruxandra Floroiu,
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
Greenhouse Gas Permitting Sean O’Brien Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.
General Operating Permits
General Operating Permit (GOP) for Combined Heat & Power (CHP) Engines & Turbines.
TRANSFORMATION Air Permit Review & Process Frank Steitz Air Quality Permitting Program.
Public Workshop Proposed RACT/BARCT Determination for Stationary Spark-Ignited Internal Combustion Engines August 29, 2000 California Environmental Protection.
Senate Bill 288- Limits Changes to Air Districts’ New Source Review Rules Beverly Werner, Manager Stationary Source Division California Air Resources Board.
Perspective on Contingency Mitigation Options Presented by John Annicchiarico, Senior Engineer August 17, 2015.
Balancing the Three R’s: Regulations, Records, and Reports Dallas, TX ♦ May 18, 2016 Arron Heinerikson.
OHS Risk Assessment of Work
Developing a Tribal Implementation Plan
Complying with Periodic Emissions Monitoring Requirements
David Kurz, P.E. Lead Wastewater Engineer
National Ambient Air Quality Standards (NAAQS)
Flexible Air Permitting
External Verification Report 2014/15
LEAN ORGANIZATION SUMMARY
2 CFR 200- aka Uniform Guidance.
AIR PERMITTING GUIDANCE
Department of Environmental Quality
Air Quality Permitting
Air Quality Permitting Guidelines for Industrial Sources
Presentation transcript:

DEP TRANSFORMATION Air Permit Review & Process

2 ITEMS DISCUSSED Permit Format Streamlining of Compliance Plans Level of Monitoring Level of monitoring as it relates to enforcement History Permit application supplemental information Redefining insignificant sources in NJ Title V program

3 ITEMS DISCUSSED Hold on-site pre/post application meetings Offer Plant-wide Applicability Limits (PAL) Develop General Operating Permits Shortening Permit Processing Time Classify More significant Modifications as Minor Modifications Like-kind Replacement of Equipment Minimize the number of appeals

4 IMPLEMENTATION General Permits (GPs & GOPs)  Combined Heat & Power (Engines & Turbines) – Available 9/19/11  Emergency Generators GOP – in progress Pre-application Checklists – in progress  Administrative & Technical Completeness Pre-application Meetings – on-going  On-site if necessary

5 IMPLEMENTATION Streamlining of Compliance Plans – in progress  Templates for Federal Rules Policy Guidance – on-going  NOx RACT Clarification  Construction, Repair & Maintenance Permit Review Procedures – on-going  PSD Review  Hearing Requests  Sensitive Projects  Common Control

6 PERMIT PROCESS - LEAN Produced results in manufacturing industry Identified OP Sig. Mod. Process Review Process Fairly Efficient Overall Info Requests Throughout Rev. Process  Due To Application Incompleteness  Missing/Incomplete Info Identified Late in Review Process Moving Completeness Review To Front of Review Process Will Improve Efficiency

7 PILOT PROJECT Six-month Project (OP Sig. Mods only) Pre-application Meetings  On-site if necessary Completeness Checklists  Rule Applicability/Compliance Demonstrations  Process Description/Air Flow Diagram  Emission Calculations/Supporting Documentation  Need for Modeling/Risk Assessment  Level of Public Interest & Outreach Full Applicant Cooperation