Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.

Slides:



Advertisements
Similar presentations
Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Advertisements

1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Rocío PRIETO – Comisión Nacional de Energía Benoît ESNAULT – Commission de Régulation de l’Energie LNG TF chairs 18th Madrid Forum Madrid, 27/28 September.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts.
Walter Boltz, ERGEG Vice President 18 th Madrid Forum 28 th September 2010 Capacity allocation in natural gas transmission networks Pilot framework guideline.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Bonn Workshops 8 and 9 Feb Balancing workstream.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Capacity Allocation and Congestion Management Monitoring results & proposal for new measures Stefanie Neveling (BNetzA) Benoît Esnault (CRE) Madrid Forum,
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
European Developments Transmission Workgroup 1 st December 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
European Developments Transmission Workgroup 3 rd May 2012.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
NRA’s vision on GRI NW work plan 2011 Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman of GRI NW.
Congestion Management
10 year investment plan ERGEG approach and contribution
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Transparency Project GRI NW Region
New transparency guidelines
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
43th IG Meeting South Gas Regional Initiative
Background and Process
Regulators’ update on Congestion Management and Balancing
Logo(1.00”:3.33”) Font is Rotis Sans Serif however font may have to be embedded as it is important that this does not change on any presentations Size.
Gas Regional Initiative
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
ACER’s view on the future role of the Gas Regional Initiative
Update on European Network Codes
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
43th IG Meeting South Gas Regional Initiative
Gas balancing – where next
EUROPEAN TRANSPARENCY UPDATE
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
ERGEG comment to KEMA study on Art. 3 and 7
ACER’s view on the future role of the Gas Regional Initiative
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms

2NW governmental meeting, 6 May 2010 Introduction Context: need to improve the access to cross border points Different allocation rules on the two sides of borders Different types of capacity products Domination of First Come First Served  More integration to the benefit of competition and security of supply Preparation of the implementation of the third package: pilot framework guideline CAM selected for the pilot project at the 16th Madrid Forum Letter from the Commission received on September 22, 2009 Consultation on the draft framework guideline launched on December 18, 2009 Final version expected by end of March 2010 ERGEG principles on CAM & CMP published in January 2009 & public consultation provided the basis for the pilot framework guideline

3NW governmental meeting, 6 May 2010 Target model and how to reach it Scope of the Framework guideline: interconnection points between entry-exit zones within the EU ( ) General principles All market areas organized as entry-exit zones with virtual hubs FCFS forbidden if congestion Limited number of capacity products Coordinated allocations throughout the EU Auctions as preferred CAM; pro-rata allowed if conditions are not met for efficient & fair auction procedures Towards uniform capacity allocation procedures at interconnection points throughout Europe in 2 steps: Harmonisation of procedures at every IP: towards bundled products between market areas Harmonisation at the EU level: same products & CAM everywhere

4NW governmental meeting, 6 May 2010 Framework guideline proposals Improved TSO cooperation for capacity calculation and allocation Adjustment of transmission arrangements (if necessary) Capacity products Harmonisation throughout Europe Small number of products, from short term to multi-annual Firm and interruptible products Towards “bundled products” at IPs (1 stop shops) Capacity allocation procedures If no congestion, capacity is allocated as requested by shippers Auction as standard allocation methodology Pro-rata as interim step when necessary Priority: same CAM on the two sides of interconnection points

5NW governmental meeting, 6 May 2010 Public consultation and next steps ERGEG public consultation on the pilot framework guideline 34 responses (incl. 4TSOs and 24 shippers) Workshop held in Brussels on 2 February 2010 Main points raised by respondents High concern about the amendment of Existing contracts Want more details about auction design and procedure to arbitrate in favour of pro-rata Bundled products: concern about the elimination of trading at the border and about the interim period Need for stakeholders’ consultation Way forward Discussions with ENTSOG on technical issues Finalisation of the framework guideline by June. Last discussions on: Implementation process of bundled products Capacity allocation when no congestion

6NW governmental meeting, 6 May 2010 What involvement for the NW Region? Main market in Europe and target model largely based on NW market’s potential for integration Guidelines and codes will deeply change market conditions in the region Important to develop a debate on target models at the level of the region Get a feedback on patential problems and obstacles ENTSOG is mainly led by NW TSOs Stakeholders representatives at the Madrid Forum belong to the region Lessons for future framework guidelines NW region should contribute to gathering views of stakeholders Test some proposals in the region Try to involve the NW region in the early steps of drafting processes

7NW governmental meeting, 6 May 2010 Thank You!