Italy-France Cross-border Intraday: Technical feasibility study CSE SG Group meeting Rome, 15 May 2012.

Slides:



Advertisements
Similar presentations
Secondary Market with Transmission Capacities ČEPS, a.s. 11/2006.
Advertisements

Den Hague 10/10/11 Yves Langer Capacity pricing workshop.
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Cross-Regional Roadmap for Intraday DRAFT Updated 31/10/2011.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
CASC.EU S.A. CASC.EU – Capacity Allocation Service Company
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
1 Intraday in the CWE region NWE and Bilateral initiatives Common RCC CSE - CWE 28 September 2010.
Assessment of differences in market designs in the CS region Milan 18 July 2008.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
Name Surname Milan, November 2010 European Federation of Energy Traders 1 The Central South Region and the European Target Model – How to ensure consistency?
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
Cross Border Intraday BE-NL
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG July 2008 Jean-Philippe Paul - John Prime.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
Introduction of an Intraday market on the Italian borders for the year 2011 Terna proposal Electricity Regional Initiative – CSE Region 15th Implementation.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Feedback on the SWE coupling Public Consultation Imeplementation Group meeting – 7th april 2014.
Draft document – Work in progress
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Intraday cross border continuous market and optional Intraday auctions “Economically optimized nomination phase”
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
CASC.EU SA and its role in Explicit auctions 16/11/2010 CASC.EU SA 1.
Intraday cross border continuous market and optional Intraday auctions “Economically optimized nomination phase”
Pilot Project on Market Coupling PEG Nord / PEG Sud 3rd Workshop on Gas Target Model London 11 APRIL 2011.
1 WHOLESALE ELECTRICITY MARKET DESIGN AND STRUCTURE Massimo Parati Market Department Italian Regulatory Authority for Electricity and Gas Milan, March.
Italian – Slovenian Market Coupling CSE SG meeting 16 November 2010, Milan.
1 page 1 Discussion on Intraday Capacity Pricing NWE ID project
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
Long term allocation 2011 Italian borders Central-South and Central-West Regions 2nd Joint RCC meeting Milan, September 28 th, 2010.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
3 rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland REM Workstream on Congestion Management Conclusions of the first workshop (11 January.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Congestion Management on the Italian border for the year 2005
efficient capacity allocation method
1 IG Meeting Milan, 18 th July 2008 Cost of Firmness of Capacity.
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
1 Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15 th May 2012.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Introduction of an Intraday market on the Italian borders for the year 2011 Electricity Regional Initiative – CSE Region Milan, 16/11/2010.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
CASC.EU – Capacity Allocation Service Company CASC.EU SA 23/11/10CASC-EU S.A. (R)
Agenda Pag. 1 I.4M MC – Common parts II.Further Information on Romanian Market 1.Regulation for DAM organization and functioning with respect to price.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY Regulation of operation and organization of the electricity day-ahead market with the price market coupling mechanism.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Congestion Management
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15th May 2012.
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Continuous Cross-Border Implicit Intraday Trade Status update
Regulators’ update on Congestion Management and Balancing
NWE Cross Border Intraday
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Draft document – Work in progress
Imbalance Netting Platform
efficient capacity allocation method
Intraday cross border continuous market and optional Intraday auctions
Intraday cross border continuous market and optional Intraday auctions
BSP SouthPool En.trading 2016
Presentation transcript:

Italy-France Cross-border Intraday: Technical feasibility study CSE SG Group meeting Rome, 15 May 2012

Agenda Background High level requirements IT requirements Clearing and Financial settlement

Interim solution: TSOs (TERNA-RTE) are going to activate an explicit intraday auction to allocate the XB transmission capacity remaining to previous auction sessions. Current Italian and French intraday markets Target model on cross-borders trading in respect of ACER’s Framework Guidelines on Capacity Allocation and Congestion Management Preference for implicit continuous trading Embedding a criteria for the pricing of the XB ID allocated capacity EPEX Spot and GME carried a study to analyze possible solutions and features to connect France and Italy ID markets with a continuous trading mechanism Background No intraday tool currently in place on the Italian-French border Italian intraday marketFrench intraday market Implicit auctions: 2 auctions in D-1 2 auctions in D Continuous trading

Agenda Background High level requirements IT requirements Clearing and Financial settlement

High level requirements Before gate closure of Italian IDM Auctions, Cross-border trades for corresponding hours are transferred into the Italian auction French-Italian cross-border order book is closed for hours which cannot be traded in a later Italian MI auction GME is counterpart for Italian bids; ECC (EPEX CCP) is counterpart for French bids; GME and ECC manage the settlement of the XB trades OTC cross-border implementation subject to a common position from both regulators Italian intraday marketFrench intraday market 4 Implicit auctions: Mandatory for participants to be balanced in the Italian ID market Continuous trading Continuous cross-border trading, taking into account available cross border capacities

Intraday Cross Border trading system(SOB) CMM Italian Members EPEX members GME OTC ? Italian intraday auction TSO Capacity information Bids Order registration Continuous XB platform linked with Italian implicit auctions

Process: Italian bids transfered into MI auctions Italian bids matched in the cross-border intraday market are transferred into the subsequent MI auction as bids and offers according to the following criteria: Purchasing bids in the cross border market are transferred into the MI auction as selling offers (and vice versa) Bids and offers are located in the virtual France zone of the Italian MI auction Price at which the matched order in the cross border market is transferred in the in the MI auction is either: freely set by the market participant set as market price (zero for selling offers and no indication of price for purchasing bids) set equal to the price of the matched order in the cross-border market In case the bids/offers transferred to the Italian MI auction is not matched (lack of liquidity or not competitive price) the Italian market participant is unbalanced in the Italian market As currently happens to Yearly, Monthly and Daily PTRs’ holders that nominate cross-border flow and are unable to sell/buy energy on the Italian day-ahead market Firmness of the cross border nomination is independent from the local nomination process and in any case ensured

Price limits Italian MI auction and in the French ID market have different price limits: 0 €/MWh; €/MWh in the Italian MI market €/MWh; €/MWh in the French ID market Suggestions: 1.Restrictive: Adoption of different price limits for Italian and French market participants in the cross-border market without allowing cross-border matching, in case prices on French side exceed Italian price limits (Italian participants are prohibited to buy and sell at negative price and at prices over 3000€/MWh in the XB ID market) 2.Less restrictive: Italian participants can be allowed to buy and sell at negative price and at prices over 3000€/MWh in the XB ID market Price limits of Italian MI auctions would not be changed Impact on definition of price to which XB ID trades are transferred into Italian ID auction, as described in slide 7

Timeframe French-Italian Xborder continuous trading 15h D-1 Order submission and matching 7h30 - x French Intraday continuous Italian-French Intraday Cross-border continuous Order submission and matching 11h30 - x Xborder trading closed for H13-H16 Italian Intraday 4 Mi auctions

Timeframe issues Under current EPEX SPOT and GME MI timing, only delivery hours from the 13th to the 24th would be tradable on a continuous cross border intra-day Overlap between delivery hours in MI auctions. For example, MI3 regards delivery hours from the 13th to the 24th hour, and MI4 regards delivery hours from the 17th to the 24th hour. To be decided whether FR-IT intraday trades sent to GME MI auctions are: all the recent trades on the continuous platform not sent yet in a previous MI auction, or only the trades regarding the hours for which trading is closed, e.g. delivery hours from the 13th to the 16th hours at the MI3 auction

Italian virtual zones France is a virtual zone of the Italian market France is directly connected to North zone with an infinite ATC Only PTRs’ holders are allowed to place their bids in the France zone France virtual zone is always cleared with the same zonal price as the North one and the ATC can never get congested France and North zones, in the Italian market, can be considered as a unique zone, from a market perspectives (prices, competition among market players) Connection with Southern zones with France: Italian importers locate their bids in the French virtual zone. These bids are matched with other Italian bids, located in all Italian zones, subject to the market splitting mechanism, respecting Italian internal congestion (ATC)

Agenda Background High level requirements IT requirements Clearing and Financial settlement

IT requirements Shared Order Books /Congestion Management Module System (SOB/CMM) in order to allow that, provided that there is available capacity: Order books have to be updated simultaneously according to the capacity values sent to the SOB/CMM Bids submitted to one local order book are simultaneously shown on the other order books provided they are compatible with the updated values of XB capacity There is a perfect synchronization of all order books Cross matching of bids submitted to different order books is supported Time stamp of the bids is similar (crucial to correctly manage priority of bids with same price) Both order books would be hosted in the same platform:

Agenda Background High level requirements IT requirements Clearing and Financial settlement

Hypothesis: GME is connected to the SOB through an API, like a “broker” Hub ITHub FR Buyer B ECC Financial settlement of the energy Nominations Seller A Buyer B Seller A Capa. FR-IT 500 € M+1 TSO A TSO B ECC AB “A sells to B” A B “B sells to A” “Nomination” Energy shipping Buy Purchase 500 € J+1 Sell Import Capacity Platform GME EPEX trading system Trading Buyer B SOB Seller A € GME 500 € Export RTETerna Export Import Sell Financial settlement cycled of GME and EPEX CCP have to be harmonized GME

Thank you for your attention