1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.

Slides:



Advertisements
Similar presentations
1 The North West European Market Parties Platform Eric van Vliet, Stephan Krieger, Hans ten Berge Mini Forum of the Central West Electricity Regional Energy.
Advertisements

Bruxelles, 13 February 2008 Regional Market and Cross Border Luigi de Francisci TERNA - Rete Elettrica Nazionale S.p.A.
Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
EURELECTRIC vision on market development – what can the industry provide to accelerate market development? Peter ŠTULC Chairman of EURELECTRIC TF flow-based.
3rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland Electricity REM Roundup and next steps David Halldearn – Head of European Electricity Policy,
France-UK-Ireland Region 1 February 2007 Written Consultation – Overview of Responses Shaun Kent – Head of European Electricity Policy, Ofgem.
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
ERGEG Public Hearing Brussels, 6 July 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG July 2008 Jean-Philippe Paul - John Prime.
The future of GB-Continent: Interconnection & Electricity Regional Initiative Simon McVeigh France-UK-Ireland Stakeholder Group meeting 4 th July 2008,
Detailed action plan ( ) Electricity Regional Initiative. South West Electricity Regional Energy Market 1st Implementation Group Meeting Madrid,
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Progress with coupling FUI and CWE region
Introduction of an Intraday market on the Italian borders for the year 2011 Terna proposal Electricity Regional Initiative – CSE Region 15th Implementation.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Dr. Frank-Peter Hansen Bundesnetzagentur.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Update on Coordination of long term auctions in the FUI region FUI IG, London, 13 th September.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Electricity interconnectors – next generation Martin Crouch Future Energy Strategies seminar 3 July 2012.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
Electricity Regional Initiative Northern Europe Region By: Finn Dehlbæk, Regulator Danish Energy Regulatory Authority (DERA) Creating a Single European.
Is the regulatory toolset right or is there a need for enhanced regional regulatory oversight? The Regional Initiatives: Europe’s key to energy market.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
FUI Stakeholder Group 4 th July 2008 Congestion Management.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Transparency in the Central West Electricity Regional Energy Market Office of Energy Regulation (DTe) MINI FORUM Paul Giesbertz.
1 Identification of the needs to modify auction rules in the FUI region Congestion management meeting – 11 January 2007.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
3 rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland REM Workstream on Congestion Management Conclusions of the first workshop (11 January.
Update on IFA Actions Congestion Management Guideline Workshop Thursday 11 th January, CRE Offices, Paris Simon McVeigh, IFA Manager, National Grid Interconnectors.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
General support to Northern Europe ERI priorities. Urges the Northern Europe RCC to proceed – not only with - Optimizing the use of interconnectors - Transparency.
2nd IMPLEMENTATION GROUP MEETING. Lisbon, 24th January 2008 Conclusions from the 3rd technical RCC.
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
Congestion Management Mr Carlo Crea AEEG, Italy The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Compliance with Electricity Regulation 1228/2003 Ms Asta Sihvonen-Punkka Chair of the ERGEG Electricity Focus Group XIV th Florence Forum Florence
Introduction of an Intraday market on the Italian borders for the year 2011 Electricity Regional Initiative – CSE Region Milan, 16/11/2010.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
13th March 2009, Bilbao GLE Workshop on LNG ERGEG MONITORING GGPLNG Rocío Prieto.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
ETSO Comments on the draft Congestion Management Guidelines
EUROPEAN ENERGY MARKET SUMMIT 30 January 2007
Regulators’ update on Congestion Management and Balancing
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
ERGEG Public Hearing on CONGESTION MANAGEMENT
Presentation transcript:

1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have a more efficient use of the interconnectors

2 Cross-border congestion management Compliance with the CM guidelines –UIOLI, firmness, compensation scheme, use of auction revenues, minimum reserve price, etc. Improvement and Harmonization of auction rules –Between North-South, Moyle and IFA interconnectors –With existing rules on continental interconnectors Implementation of a coordinated explicit auction mechanism (same set of auction rules, timeframes, etc.) –To facilitate competition on the regional market –And develop integration of the F-UK-I electricity markets

3 Intraday and Balancing trade Implementation of a simple specific allocation mechanism for cross-border intraday trade –To offer a greater flexibility to market actors –To optimize the utilization of cross-border capacities Integration of balancing mechanisms –To enhance competition in the real-time market –To enhance stability of the network –To reduce the TSOs’ overall balancing costs

4 Wholesale market Transparency Assessment of current situation across the region in regards to the Congestion management guidelines : –Information on the interconnections (e.g. capacities, use of congestion rents, etc.) Assessment of current situation across the region in regards to the draft ERGEG Transparency guidelines Assessment of any constraints on TSOs in meeting the ERGEG GGP Proposal to achieve a level-playing field

5 Main objectives 1.Discuss the 3 identified first priorities and determine precisely for each priority what has to be achieved -> High level definition of a common “roadmap” 2.Discuss further improvements to be investigated -> Potential use of implicit auctioning -> Other improvements?

6 Back-up slides

7 F-G : Exp. Auction G-F : Exp. Auction « Market-based » non coordinated F-B : Exp. Auction B-F : Exp. Auction French current situation F-I :- 50% Exp. Auction - 50% by Terna I-F : No congestion « Market-based » coordinated F-UK : Exp. Auction. UK-F : Exp. Auction F-S : Exp. Auction S-F : Exp. Auction By the 1st of June 2006 F-Ch : No commercial capacity Ch-F : No congestion Non « market-based »

8 Next steps: implementation of main action points foreseen in the 3 roadmaps Secondary Capacity markets Cross-border intraday and balancing trade Cross-border capacity calculation method Harmonization of cross-border auction rules Implementation date July 2006 January 2007 CRE-CREG-DTeCRE-FNACRE-E control

9 Main expectations from the Regional Initiatives UK-Ire-F region:  Harmonization of IFA auction rules with those currently implemented on other links (Implementation of the UIOLI principle and of a specific intraday allocation mechanism) Central Western Region  Implementation of the two roadmaps (CRE-CREG-DTe, CRE-FNA) South Central Region  Implementation of a coordinated explicit Auction with Italy