France-UK-Ireland Region 1 February 2007 Written Consultation – Overview of Responses Shaun Kent – Head of European Electricity Policy, Ofgem.

Slides:



Advertisements
Similar presentations
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Advertisements

2 nd Workshop MFG, , Bucharest The current status on the Market Design of the SEE REM and the way forward.
Common FUI Portal FUI IG Meeting Ofgem, 30 th September 2011.
North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.
EURELECTRIC vision on market development – what can the industry provide to accelerate market development? Peter ŠTULC Chairman of EURELECTRIC TF flow-based.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
3rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland Electricity REM Roundup and next steps David Halldearn – Head of European Electricity Policy,
ERGEG Public Hearing Brussels, 6 July 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
IFIEC’s view on Transparency in Electricity Markets Christoph Bier ERGEG Public Hearing on Guidelines of Good Practice on Transparency and Information.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG July 2008 Jean-Philippe Paul - John Prime.
The future of GB-Continent: Interconnection & Electricity Regional Initiative Simon McVeigh France-UK-Ireland Stakeholder Group meeting 4 th July 2008,
Progress with coupling FUI and CWE region
2 nd Stakeholder Group Meeting 14 November 2006 France-UK-Ireland Electricity REM Paper 5 - Imbalance Pricing Shaun Kent – Economist, European Affairs.
2 nd Stakeholder Group Meeting 14 November 2006 France-UK-Ireland Electricity REM Stakeholder Participation David Halldearn – Director, European Affairs.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Dr. Frank-Peter Hansen Bundesnetzagentur.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Is the regulatory toolset right or is there a need for enhanced regional regulatory oversight? The Regional Initiatives: Europe’s key to energy market.
Legal and Regulatory framework Regional Power Exchange Issues Apr 4, 2006 Kjell A Barmsnes
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.
How do CEE countries benefit from improved regional cooperation? from the Czech TSO perspective The Regional Initiatives - Progress and Prospects Joint.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Transparency in the Central West Electricity Regional Energy Market Office of Energy Regulation (DTe) MINI FORUM Paul Giesbertz.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
3 rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland REM Workstream on Congestion Management Conclusions of the first workshop (11 January.
Guidelines on Congestion Management ERGEG Public Hearing 30 June 2005 EuroPEX.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Cross Border TSO Balancing Procurement - a Generator/Trader Perspective Malcolm Taylor Head of Electricity Trading Association of Electricity Producers.
General support to Northern Europe ERI priorities. Urges the Northern Europe RCC to proceed – not only with - Optimizing the use of interconnectors - Transparency.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Congestion Management Mr Carlo Crea AEEG, Italy The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
European Market Model Implementation CIM Users Group Spring Meeting Praha, Czech Republic.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
SEM Regional Integration FUI Stakeholder Group November 2009.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Congestion Management
Moyle & East West Access Rules Approval
Long-Term Auctions & Capacity FUI Coordination Proposals
ETSO Comments on the draft Congestion Management Guidelines
EUROPEAN ENERGY MARKET SUMMIT 30 January 2007
Regulators’ update on Congestion Management and Balancing
International Conference
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Update on European Network Codes
Gas balancing – where next
EURELECTRIC transparency requirements
ERGEG Public Hearing on CONGESTION MANAGEMENT
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
Presentation transcript:

France-UK-Ireland Region 1 February 2007 Written Consultation – Overview of Responses Shaun Kent – Head of European Electricity Policy, Ofgem

2 France-UK-Ireland REM – Consultation Responses Overview Responses  13 responses received :  10 representing market participants / suppliers / generators / traders  1 from Power Exchange - APX  1 consumer body – energywatch  1 Interconnector body – Moyle  Broad support for overall approach – e.g. focus on market interface  Some calls for expediting process e.g. direct Project Management  All available ERGEG website

3 France-UK-Ireland REM – Consultation Responses Overview Key messages – Congestion Management  Support implementation of CM Guidelines  Intra day markets key – must be addressed  Broadly support UIOLI / UIOSI – but should be facilitated by better secondary markets  Broadly favour Financially firm access  Some calls for further harmonization of Gate Closure etc.  Some calls for revision to IFA auction arrangements  ‘Inefficiencies’ on IFA explained by timing mismatches / difficulty of intra day trade. Further work.

4 France-UK-Ireland REM – Consultation Responses Overview Key messages – Balancing  Important issue but intraday markets equal priority / necessary prerequisite  Alignment of cross border balancing arrangements desirable  Greater transparency called for e.g. on inter-TSO balancing trades  Broad support for ‘Model 2’ as pragmatic approach - moving towards model 1 in the longer term  Imbalance pricing – recognize distortions of different imbalance price rules – but risks can be managed

5 France-UK-Ireland REM – Consultation Responses Overview Key messages – Transparency  Broad agreement with ‘gap’ analysis  Improvements sought in e.g. :  Transmission outage data  Information on Moyle  Forecasts of interconnector capacity closer to real time  Inter TSO trades for balancing  Generation data in Ireland and France  Favour information / data to be placed on websites in real time or as close to real time as possible

6 France-UK-Ireland REM – Consultation Responses Overview Key messages – Transmission Tariffs  Recognize / broadly agree that distortions exist  Generally favour further / enhanced analysis, e.g.  BSUoS  Losses  etc.  Some calls for harmonisation of G and D split and/or common methodology  Some favoured TNUoS charges should be removed for interconnector users and GB should join ITC mechanism

7 France-UK-Ireland REM – Consultation Responses Overview Thank You Shaun Kent – Head of European Electricity Policy, Ofgem