Aggregate Planning FAISAL FARIS BIN RAHIM

Slides:



Advertisements
Similar presentations
Capacity Management Planning the resource capacity that a firm will need to meet its demand.
Advertisements

Industrial Facilities Design (7 th Term, Batch 2009)  28/3/2012 11  lectur # 31 & 32.
Business Processes Sales Order Management Aggregate Planning Master Scheduling Production Activity Control Quality Control Distribution Mngt. © 2001 Victor.
Strategic Decisions (Part II)
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
Aggregate Planning in a Supply Chain
Operations Management Dr. Ron Tibben-Lembke
Aggregate / Production Planning
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
BUAD306 Aggregate Planning. Determines the resource capacity needed to meet demand over an intermediate time horizon Typically months in duration.
BA 320 Operations Management Chapter 9 Capacity and Aggregate Planning.
IES 371 Engineering Management Chapter 14: Aggregate Planning
Aggregate Production Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Aggregate Planning 13 © 2011 Pearson Education, Inc. publishing as Prentice Hall.
PRODUCTION AND OPERATIONS MANAGEMENT
Operations Management Dr. Ron Lembke
Aggregate Planning in a Supply Chain
CHAPTER 3 : AGGREGATE PLANNING MOHD HAFIZUL BIN TUKIMIN MOHD SYAFIQ BIN MANSOR MOHD RUBA’I AMIR BIN SALLEH CHE MUHD FIRDAUS BIN CHE MAT.
19–1. 19–2 Chapter Nineteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Aggregate Planning.
1 By: Prof. Y. Peter Chiu By: Prof. Y. Peter Chiu 9 / 1 / / 1 / 2010 Advanced P.O.M. Chap. 3 Aggregate Planning.
Supply Chain Management (SCM) Aggregate Planning
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
Chapter 8 Aggregate Planning in a Supply Chain
LESSON 8: AGGREGATE PLANNING
© 2007 Pearson Education Sales and Operations Planning Chapter 14.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 11 Capacity Planning And Aggregate Production Planning.
1 DSCI 3123 Forecasting & Aggregate Production Planning Strategic Role Of Forecasting Forecasting Methods Capacity Planning Aggregate Production Planning.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Aggregate Production Planning (APP) Slide Set #8.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 Learning Objectives:  Understand the concepts and methods of aggregate.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
OPIM 204 – Aggregate Planning 1 Aggregate Planning OPIM 3104 Instructor: Jose Cruz.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 20 1.
Operations Management Aggregate Planning
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
CHAPTER 3 AGGREGATE PLANNING. LEARNING OBJECTIVES Define aggregate planning and how it is useful Identify optional strategies for developing an aggregate.
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Operations Management Aggregate Planning
Production Smoothing An insightful look at the intricacies of tactical level production planning An engineering management graduate busily determining.
8-1 Aggregate Planning in the Supply Chain Supply Chain Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
Operations Fall 2015 Bruce Duggan Providence University College.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
© 2007 Pearson Education Sales and Operations Planning.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Chapter 12 With Woodruff Modification Sales and Operations Planning – Aggregate Planning Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights.
AGGREGATE PLANNING BY GRAPHICAL APPROACH Particularly for high volume, standardized product system & closed job shop systems, the concepts & methods of.
OPERATIONS MANAGEMENT: Creating Value Along the Supply Chain,
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Aggregate Sales and Operations Planning
Chapter 14 Aggregate Planning.
BUAD306 Aggregate Planning.
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
Chapter 8 Aggregate Planning in the Supply Chain
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Aggregate Planning FAISAL FARIS BIN RAHIM
Beni Asllani University of Tennessee at Chattanooga
Chapter 8 Aggregate Planning in the Supply Chain
Sales and Operations Planning
Dr Sh Salleh bin Sh Ahmad
Aggregate Production Planning (APP)
Presentation transcript:

Aggregate Planning FAISAL FARIS BIN RAHIM MOHD HANEESYAH BIN CHE HASSAN NOR SYAKIRA BT ZAUKIFLI ANISAH BT ABD LATIFF

Outline Costs in aggregate planning Solving in aggregate planning problem Linear decision rule (LDR) Modeling management behavior

Costs in Aggregate Planning Smoothing Costs Holding Costs Shortage Costs Regular Costs Overtime & Subcontracting Costs Idle Time Costs

Issues in Aggregate Planning Smoothing – refer to the cost of changing production and workforce level between periods. (Firing & Hiring Costs) Bottleneck Problem – Inability to respond to sudden changes in demand as a result of capacity restrictions (High demand in one period & breakdown of a vital piece of equipment)

Issues in Aggregate Planning Planning Horizon- Number of periods for which the demand forecast and aggregate planning are done. If it is too small ( current aggregate plan may lead into not meeting the demand beyond planning horizon) If it is too large ( forecasts into far future will be less accurate) End-of-horizon effect

Cost in Aggregate Planning Smoothing Cost Hiring costs (advertising, interviewing & training) Firing costs ( lack of labor force in future) Assumed to be a linear function of the number of workers

Cost in Aggregate Planning Cost of Changing the Size of the Workforce Firing costs Hiring costs

Cost in Aggregate Planning Holding Costs Occurs as a result of having capital tied up in inventory. Assumed to be linear in the level of inventory For aggregate planning, it is expressed in terms of dollars per unit held per planning period; (e.g. 100 $/month for one item)

(e.g. 100 $/month for one item)

Cost in Aggregate Planning Shortage Costs Shortage occurs when demands are higher than anticipated For aggregate planning, it is assumed that excess demand is backlogged and filled in a future period. In a highly competitive situation, the excess demand may be lost---lost sales.

Cost in Aggregate Planning Regular Time Costs Involve the cost of producing one unit of output during regular working hours Overtime or Subcontracting Costs Costs of production units not produced on regular time. Overtime-production by regular-time employees beyond work day; Subtracting-the production of items by an outside supplier;

Cost in Aggregate Planning Idle Time Costs Under utilization of workforce

SOLVING AGGREGATE PLANNING PROBLEMS

BASIC RELATIONSHIPS Workforce Number of workers in a period = Number of workers at end of previous period + Number of new workers at the start of the period- Number of laid off workers at start of the period Inventory Inventory at the end of a period = Inventory at end of the previous period + production in current period – Amount used to satisfy demand in current period Cost Cost for a period = Output Cost( Reg + OT+ Sub) +Hire/Lay off Cost +Inventory Cost +Back-order Cost

PROBLEM 1 A firm producing one product is scheduling (allocating) its January-March production capabilities. Part of the decision involves scheduling overtime work. A unit produced on overtime costs an extra $300. Similarly, a unit made one month before it is needed incurred an inventory carrying cost of $100; two months costs $200 per unit. The units delivered according to this schedule follows: January - 80 units. February - 120 units. March - 150 units. Production capacities are: Formulate the production scheduling problem as a transportation problem and solve it by the Northwest Corner Rule. Regular Time Overtime January 100 50 February 40 March 30

SOLUTION: Demand for Supply from January February March Unused capacity (dummy) Total capacity available (Supply) Regular 80 20 100 Overtime 50 40 60 30 Demand 120 150 70 420

PROBLEM 2 Period Demand forecast Planned production The production planner of Omega Research, a maker of industrial lenses, devised the following level output aggregate plan for the next 4 periods. Calculate the projected beginning and ending inventory for each period. Possible backorders may be shown by a negative number. Period Demand forecast Planned production Beginning inventory Ending inventory 1 40,000 48,000 9,000 2 70,000 3 30,000 4 55,000

SOLUTION: Period Demand forecast Planned production Beginning inventory Ending inventory 1 40,000 48,000 9,000 17,000 2 70,000 -5,000 3 30,000 13,000 4 55,000 6,000 Note that ending inventory = beginning inventory + planned production - demand forecast

Develop a chase demand strategy that gradually increases the inventory level to 14,000 units by the end of period 4. Show the effect of the plan on inventory level for each period. Inventory is increased by 1250 units in each period: (14,000 - 9,000)/4 Period Demand forecast Planned production Beginning inventory Ending inventory 1 40,000 41,250 9,000 10,250 2 70,000 71,250 11,500 3 30,000 31,250 12,750 4 55,000 56,250 14,000

Assume that the company currently has 10 employees and each employee, on average, can produce 4,000 units per period. Develop a staffing plan showing the number of employees that should be hired or laid off at the beginning period, using the following worksheet format. Period Required work force Required number of employees Available at the end of previous period Hire Layoff 1 2 3 4

SOLUTION: Period Required work force Required number of employees Available at the end of previous period Hire Layoff 1 41,250/4,000= 10.3 10 2 71.250/4,000= 17.8 18 8 3 31,250/4,000= 7.8 4 56,250/4,000= 14.1 14 6

Linear Decision Rule (LDR)

FORMULA= Total Cost Over the T-Period Planning Horizon

FORMULA= Optimal Production Level in Period t The terms of a,b,c and d are constant that depend on the cost parameters

EXAMPLE:

a) Compute the values of the aggregate production level and the number of workers that the company should be using in the current period: Solution: Pt= 0.463(150) + 0.234(164)+ 0.111(185)+ 0.046(193)+ 0.993(180)– 0.464(45)+ 153 Ans:……………….. W t = 0.010D t + 0.0088D t+1 + 0.0071D t+2 + 0.0054D t+2 +0.743W t-1 – 0.01I t-1 – 2.09 Ans:………………….

The result is optimal production in period t will be form. THE ADVANTAGES The result is optimal production in period t will be form.

convincing argument to justify such cost curves. THE DRAWBACKS The main weakness of the method is that it requires symmetric cost functions and there is no convincing argument to justify such cost curves. The quadratic lead to LDR there is no guarantee that the solution will be non-negative.

Modeling Management Behavior Created by Bowman (1963) Construct model for controlling production level Avoids problem arise when using traditional modeling method Exp : Avoids determine values of parameter that difficult to measure Exp : determining the accuracy of assumption that required by model.

Pt = Dt + α(Pt-1 – Dt) + β(IN – It-1) Pt = Dt for 1 ≤ t ≥ T 1 Pt = Dt + α(Pt-1 – Dt) Not given : β, IN , α and a 2 Not given : a Pt = Dt + α(Pt-1 – Dt) + β(IN – It-1) 3 D = forecast demand P = production level α = smoothing factor / exponential smoothing IN = Smoothing for inventory level β = Relative weight a = for determination of P

Example Using the following values of management coefficient for Bowman smoothed production model, determine the production level should plan in the coming year with demand of 100,000 packages. Assume current production level is 150,000 packages Given : Pt-1 = 150,000 a1 = 0.3475 a2 = 0.1211 a3 = 0.556 a4 = 0.0663 a5 = 0.0023 α = 0.6 β = 0.3 IN = 40,000 Dt = 130,000 It-1 = 20,000