Winter 2013/2014 Reliability Solution Including LNG MWHs N. Jonathan Peress Conservation Law Foundation Greg Lander Skipping Stone NEPOOL Markets & Reliability.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

ISTISNA AS MODE OF FINANCE
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
ISTISNA’.
Chapter 4 Supply Contracts.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
© 2013 Day Pitney LLP Overview and Update on the Ever-Evolving New England Wholesale Capacity Market presentation to Boston Bar Association May 23, 2013.
Foundations of Chapter M A R K E T I N G Copyright © 2003 by Nelson, a division of Thomson Canada Limited. Understanding Pricing 13.
Chapter foundations of Chapter M A R K E T I N G Understanding Pricing 13.
FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Total Utility Management Services, LLC is committed to helping your organization make the best informed energy decisions with decades of cost-proven results.
Tendering Yuck!.
03/11/2013 MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Overview of Market Rule revisions.
SEPTEMBER 12, 2012 | MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Hourly Offer and Intraday.
Allocation of capacities between Portugal and Spain Madrid 30 th April 2013.
JANUARY 14-15, 2014 | NEPOOL MARKETS COMMITTEE Matthew Brewster MARKET DEVELOPMENT | Conceptual design.
SEPTEMBER 24, 2013 | NEPOOL MARKETS COMMITTEE ISO NEW ENGLAND - MARKET DEVELOPMENT Summary of NCPC Credit for Postured Generators NCPC Payments – Generator.
NOVEMBER 18, 2013 | WESTBOROUGH, MA Administrative Pricing Rules for Forward Capacity Auction #8.
OCTOBER 8, 2014 Bob Laurita INTERNAL MARKET MONITORING New Import Capacity Resource FCM Market Power Mitigation Order to Show Cause Compliance Filing.
AUGUST 7-9, 2013 | LENOX, MA Andrew Gillespie MARKET DEVELOPMENT (413) Review of Market Rule 1: Section.
Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
Book 2: Chapter 2 Economic Planning for New Pipelines.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Alternative Project Delivery
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
Financial Assistance Workshop Contract versus Grant.
Gas & Power Coordination: Growing Pains in Time of Transition Mark Stultz, BP Natural Gas Supply Association OPSI Annual Meeting Chicago, Illinois October.
Economic Transmission Case Study: Champlain Wind Link Vermont System Planning Committee March 10, 2010.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
OPSI Annual Meeting Bob Hayes Vice President Natural Gas Trading October 13, 2014.
Reliability Charge Colombia, an investment oportunity Paris, Octuber 15-16th, 2007.
20 September 2015 GAZ DE FRANCE ESS Introduction of Gas Reserve Arrangements Mark Bailey Gaz de France ESS.
Gas Market Dynamics – The Ups and Downs March 11, 2009.
Construction Contracts and Project Delivery Methods
WSPP Contract Subcommittee February 3, 2011 Meeting Notes These notes are to facilitate discussions of a WSPP REC Service Schedule, are subject to revision,
OSC Meeting April 27, Transmission Cost Allocation Overview.
Bulk Power Transmission System
New Regulatory Scheme to Guarantee Power Reliability Colombia, an investment oportunity Santo Domingo, March 14-15, 2007.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
CHAPTER Foreign Currency Transactions Fundamentals of Advanced Accounting 1 st Edition Fischer, Taylor, and Cheng 6 6.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
1 Chapter 6: Revenue Analysis. 2 Revenue Recognition Criteria Both the criteria should be satisfied: Good and service has been delivered Cash is collected.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Explanation of Latest Changes to Draft Reserves Schedule, Service Schedule D Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Project Procurement Management
Explanation of Changes to Draft “Firming” Schedule, Service Schedule E Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
Illinois Wholesale Market Update December 10, 2003.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Market Implications and Considerations for Enhanced Scheduling Flexibility: Facts Observations Problems Solutions February 2016 Greg Lander– President.
Mario S. DePillis Jr. USAEE Meeting, Pittsburgh, PA October 25-28, 2015.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
CLC1501 Introduction to the PPP Procurement Approach – Principles of PPP Procurement.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
Connecting the Dots in New England: NEPOOL’s IMAPP Initiative
Aligning the Gas and Electric Markets: EDF Solutions
An Introduction to Procurement
Flexible Forward Contracts for Renewable Energy Generators
December 9, 2005 Allison DiGrande, External Affairs Department, ISO/NE
Procurement Plan and Procedures Code of Standards of Conduct
Capacity Methodology Statements: Impact of Mod 452
IFRS 15 - Revenue from Contracts with Customers
System Operational Update and Review December 4, 2018
Winter Reliability Program Updated
Presentation transcript:

Winter 2013/2014 Reliability Solution Including LNG MWHs N. Jonathan Peress Conservation Law Foundation Greg Lander Skipping Stone NEPOOL Markets & Reliability Committee 1

LNG Is Part of the Solution and Should be Considered LNG was an important reliability resource in 2012/13. An assumption that similar or greater quantities will be available next winter creates unnecessary reliability risk. LNG can be used to buttress gas supplies at multiple delivery points and alleviate performance anxiety/deliverability uncertainty in the control room. LNG is a lower cost resource than fuel oil and will open up ISO’s reliability procurement to many more units; thus enhancing competition among providers. LNG has a lower emissions profile than other fuels and will not raise operational limits due to permit conditions and other environmental regulatory considerations. 2

Design Principles and Mechanics- Mirror ISO-NE Fuel Oil and Dual Fuel Proposals ISO seeks and Generators offer “Reliability Energy” which is defined as a maximum quantity of MWs per hour and MWH’s per Month of Reliability Energy in each month of Dec-Feb –The Reliability Energy is generated through LNG supplies delivered to Tennessee and/or Algonquin at location(s) to the east of any respective west to east constraints on Tennessee or Algonquin. Reliability Energy is offered by month, or for all months and, for a Reliability Unit, ISO-NE may select any or all months for which offered. ISO- NE/Reliability Unit agreement period is “Reliability Period.” ISO-NE will review the Reliability offers and once a Reliability Unit offer is accepted, ISO-NE will: –Pay Monthly Fixed Charge (subject to Penalty Provision(s) below) determined at the end of each month –Determine daily, throughout Reliability Unit’s Reliability Period, whether to utilize the MWHs procured. 3

ISO will review the offers and award the MWH allotment to Reliability Units in its discretion, up to 4.2 million barrels of oil (LNG- equivalent is ~24 Bcf). Resource selection optimized based on selection criteria –Minimize cost –Location –Historical availability and performance –Total capacity of resources Once selected, Reliability Unit will be required to demonstrate as of 12/1/13, contractual option/commitment for LNG supplies for the amount of MWs per hour and MWHs for each month in Reliability Period. 4

If Reliability Unit has a standing offer at the start of its operating day on its primary fuel and switches to LNG with ISO’s approval (or at ISO-NE’s request), the forecaster will substitute the LNG fuel reference cost as the supply offer for the duration of operations that operating day (as per ISO-NE’s dual fuel procurement construct) For hours during which LNG fuel reference costs are reflected in offers or re-offers, Reliability Generator either: –A) re-directs flowing west to east pipeline gas to alternate unit (to the extent Reliability Unit has west to east flowing gas scheduled for delivery),or, –B) provides demonstration that Generator’s nominated west to east pipeline gas was not scheduled by pertinent pipeline. –Note that together “A” & “B” ensure LNG results in incremental, Reliability Energy 5

Offer Price Components Fixed monthly amount based on maximum monthly MWHs committed comprised of: –LNG Supplier “Option Charge” (i.e., fixed cost levied by LNG supplier) –Inventory risk premium (e.g., selling uncalled supply at spot) –Profit for providing this service Each bid will also include the offer price for the Reliability Energy - $/MWH- for the month Note re: risk premium: Unit has a “Take-or-Pay” obligation with LNG Supplier in order to manage its Reliability obligation to ISO-NE. That said, historically, the advance purchase cost of LNG is often more economic than daily quoted market prices of delivered gas. 6

Other Provisions: LNG MWH Reliability Units Follow ISO- NE’s Proposed Procurement Construct Once the MWH allocation has been determined by ISO- NE, it will be published and released to the Resources (Reliability Units(s)). Each Resource (Reliability Unit) must have its agreed upon December inventory on site on December 1, –presents contractual proof to ISO-NE 7

Penalties At the end of each month, penalties will be calculated based on that month’s performance. Resources (Reliability Units (s)) will be entitled to retain payment(s) from the program based on: –Performance during such month, with commitment and dispatch as a baseline –ISO-NE will evaluate, based upon Reliability Unit supplied information it obtained from LNG Supplier and/or pipeline, whether or not contracted LNG supplies delivered to Tennessee and/or Algonquin were used to meet obligations in hours during which LNG fuel reference costs are reflected in offers or re-offers If so, Reliability Unit retains payments If not payments of Fixed Charge in Month proportionately reduced/returned to ISO-NE by Reliability Unit 8

Program Completion On earlier of March 1, 2014 or end of respective contracted Reliability Period, Reliability Unit released from its winter obligations to the program. Note: at no time does ISO-NE take or acquire title to LNG supplies. All Resources (Reliability Units (s)) are still subject to the rules and regulations of the existing market structure before, during, and after the procurement period. 9