1 CM HOW-TO DETAILED DISCUSSION. 2 OBJECTIVE n Upon completion of this training you will demonstrate an understanding of how to perform a CM evaluation.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Maureen Curran and Mary Lou Aalbers Hazelwood School District Teacher tips.
REQ Enrollment in Demand Response Programs Process Flow Engineering Firm Retail Customer Demand Response Service Provider (DRSP) Distribution Company.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Module N° 7 – Introduction to SMS
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
GOALS FOR TODAY Understand how to write a HACCP Plan
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
ZMQS ZMQS
Part 1 Marketing Dynamics
Richmond House, Liverpool (1) 26 th January 2004.
Week 2 The Object-Oriented Approach to Requirements
7 Developing Employees Human Resources Management and Supervision
Fact-finding Techniques Transparencies
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
What Is Cost Control? 1 Controlling Foodservice Costs OH 1-1.
S-Curves & the Zero Bug Bounce:
ABC Technology Project
Mental Math Math Team Skills Test 20-Question Sample.
VOORBLAD.
Checking & Corrective Action
A Key to Economic Analysis
Identifying Our Own Style Extended DISC ® Personal Analysis.
IS-700.A: National Incident Management System, An Introduction
Squares and Square Root WALK. Solve each problem REVIEW:
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 28 Slide 1 Process Improvement 1.
Do you have the Maths Factor?. Maths Can you beat this term’s Maths Challenge?
the Entity-Relationship (ER) Model
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Ohio Planning Conference Organizing for Reliability – A State Perspective.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
DB analyzer utility An overview 1. DB Analyzer An application used to track discrepancies and other reports in Sanchay Post Constantly updated by SDC.
CM HOW-TO GENERAL OVERVIEW AND DELTAS FROM E2. OBJECTIVE u Upon completion of this training you will demonstrate an understanding of major differences.
Addition 1’s to 20.
25 seconds left…...
1 Atlantic Annual Viewing Trends Adults 35-54, Total TV, By Daypart Average Minute Audience (000) Average Weekly Reach (%) Average Weekly Hours Viewed.
Week 1.
We will resume in: 25 Minutes.
A SMALL TRUTH TO MAKE LIFE 100%
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
TASK: Skill Development A proportional relationship is a set of equivalent ratios. Equivalent ratios have equal values using different numbers. Creating.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
Supply Chain Performance Measurement
Supply Chain Performance Measurement
How Cells Obtain Energy from Food
Immunobiology: The Immune System in Health & Disease Sixth Edition
Chapter 14: Network Design and Facility Location.
Presentation transcript:

1 CM HOW-TO DETAILED DISCUSSION

2 OBJECTIVE n Upon completion of this training you will demonstrate an understanding of how to perform a CM evaluation.

3 REVIEW QUESTIONS n Why are both a macro and micro approach taken when evaluating CM? n Describe Phase 1 and 2 work at INPO n What is the relationship of Appendix 2 to Appendix 1 of the How-To? n How should Appendix 1 and 2 be used during the evaluation? n How might the perception of margin differ between engineering and operators? n What is the main difference in the CM delta assessment sheet?

4 REVIEW QUESTIONS n Why are Phase 1 and 2 key to a successful CM evaluation? n Of what value is the CM questionnaire? n Why must a CM evaluator always keep in mind the status of the enablers? n What are some bases for limiting on-site scope? n Explain the difference between a fundamental and high level attribute. n For what two functional areas must the CM evaluator/analyst determine if a focus is needed on-site?

5 CM HOW-TO n CM is a broad area to evaluate n Many plant functional departments support CM

6 APPROACH n Method based on 3 pilots n Addressing enablers/attributes –General approach –MACRO & MICRO approach –1 ST and 2 ND pilots addressed all attributes –3 rd pilot limited work on site (reduced team size) station buy-in on site scope n Must narrow scope of site work n Must identify issues early for E3 success n FOPs are the organizational weaknesses n Must make early call on functional areas

7 TWO PHASES OF REVIEW/ANALYSIS AT INPO KEYS TO SUCCESS n Phase 1 –Determine focus areas –Determine additional specific information needed n Phase 2 –Review detailed documents –Prepare details for site work

8 PHASE 1 n Review normally requested info –Includes CM questionnaire –Determine vertical reviews and potential issues –Request specific documents –Document examples: ODs, DBDs, Mods, AOPs, NOPs, eng. Evals, 50.59s, calcs, complete condition reports, specs, program documents, etc.

9 PHASE 2 n Review specific documents n Limit on-site scope –Call on functional focus (RE &DE) –Enablers/attributes not being pursued on site –Focus areas n Develop preliminary PDSs n Determine site activities

10 PHASE 2 Cont’d n Vertical slice (potential for new issues) example n Status enabler/attribute list n Evaluation plan 95% complete n Functional area focus call

11 PILOT EXPERIENCE n It took 10 man- days for phase 1 & 2 n Counterpart relationship is key to a successful CM evaluation

12 OBSERVATIONS n Observation for each enabler n Team Manager reports to site management on an enabler basis n Paints a better CM picture n CM evaluator owns CM enabler observations

13 COUNTERPARTS n Counterpart team part of eval team n Continually reinforce E3 process (counterpart appreciation of CM effect on other departments) n Explain precursor AFIs n Explain less focus on examples and more on whys

14 HEADS UP n Expected to provide input to management model (late first week) Key in discussing whys n Mark OEO bubble chart to indicate strong or weak areas by 2 nd Thursday (do not assess) n Debrief as a team (focus on whys – example)

15 MOST USEFUL UPFRONT INFO ON THE 3 PILOTS n Event info n System health reports n CAP database n DBDs n NRC reports n response documents n Vertical slice summary reports n Engineering evaluations n Specific calcs n Specific mods n Specific temp mods n ODs n Specific 50.59s n Self-assessments n Specific program documents n Specific procedures

16 HOW TO WALKTHROUGH n Main document (Key Points) –Must narrow scope of work on site –Have observations and preliminary PDSs –INPO must status all OEOs to utility CEO –Responsible for functional area calls on RE and DE –Analysis at INPO is part of evaluation –Fundamental and high level attributes –Micro and Macro approach –CM performance problems (example)

17 ATTACHMENT 1, EVALUATION APPROACH n An attempt to get to specific actions –Vertical slice –Specific activities –Program reviews –Process reviews –Passive component reviews –Power Uprates –Operating Margins

18 ATTACHMENT 2, ENABLER/ATTRIBUTE LIST n Cross reference to info request items and attachment 1 items n Suggested actions n Attribute meaning n Status during eval

19 ATTACHMENT 3, MARGIN MODEL n Common terminology for discussions with counterparts n Based on NSAC/125 n Does not include safety margin terminology

20 ATTACHMENT 4, CM QUESTIONNAIRE n Analyze for trends and insights n Pilot results n Share results with counterpart (opportunity to get counterparts involved) n Support services puts data on Excel spread sheet

21 ATTACHMENT 5, INFORMATION REQUEST n A lot of information to look at during Phase 1

22 ATTACHMENT 6, CM PROGRAMS n Pilot evaluations were based on margin management n Going forward focus is on specific programs (listed in attachment 1) n Going forward evaluate programmatic aspects also n Evaluate programs identified in Attachment 1 (depth of review should be based on indications of weaknesses) n Other programs identified in Attachment 6 should be evaluated based on review/analysis of plant info

23 ATTACHMENT 7, CM ASSESSMENT n Process similar to existing process n Evaluator to provide information to the group. The wisest of men cannot answer all the questions of a fool. n Delta sheet to contain a narrative for each enabler (see attachment 9)

24 ASSESSMENT CRITERIA, ATTACHMENT 8 n Latent weaknesses that are not affecting plant performance (1&2) n CM weaknesses are affecting plant performance (3- 5)

25 DISCUSSION EXAMPLES –CNS EQ –Comanche Peak AFW mod –Seabrook equipment data base –Comanche Peak power uprate –CNS CCW –Comanche Peak fuel