Introduction to MTEF in Korea Doyoung Min The World Bank.

Slides:



Advertisements
Similar presentations
Top-down Budgeting A Tool for Central Resource Management John M. Kim Korea Inst. of Public Finance
Advertisements

1 Performance elements in budget and reporting process - Norway 1st Meeting of OECD-MENA Senior Budget Officials Network Cairo, Egypt, November 2008.
The Hungarian Budget Review Daniel Bergvall and Ian Hawkesworth Budgeting and Public Expenditures Division.
1 Towards Government at a Glance Presentation for the regional high-level capacity building seminar MANAGING THE PERFORMANCE AND REINFORCING THE INTEGRITY.
Medium Term Expenditure Framework for Implementing Poverty Reduction Strategies Dr. Yan Wang for NEEDS Implementation Workshop,
MDGs and MTEF Sudharshan Canagarajah World Bank. Background MDGs are requiring additional efforts in improving planning, budgeting and policy reforms.
MTEF BUDGET PROCESS – A TOOL FOR MAINSTREAMING MDGS
Improving Budgetary Outcomes
1 The PEFA Program – and the PFM Performance Measurement Framework Washington DC, May 1, 2008 Bill Dorotinsky IMF.
KYRGYZ REPUBLIC Programmatic Public Expenditure Review Monitoring and Evaluation The MOF/Donor Workshop on PPER Bishkek, September 26, 2005.
David Shand PFM Consultant IMF Workshop, Almaty, Kazakhstan
Challenging the Budget Creating Incentives for Results Rwandas Experience Elias Baingana - Budget Director.
Medium-Term Budgeting in Moldova Progress and Future Challenges February 2009.
Linkages Between NPoA and MTEF
International Monetary Fund Fiscal Affairs Department Holger van Eden
MEDIUM-TERM BUDGETING LESSONS FROM OTHER REGIONS The World Bank Pacific Department 1.
Evaluating administrative and institutional capacity building
National Fiscal Management Plan October 10, 2003 Youngsun Koh Korea Development Institute.
Recent Public Expenditure Reforms in Korea June 6, 2005 June 6, 2005 Young Kon Chin Director General, Ministry of Planning and Budget Republic of Korea.
Strategic Financial Management 9 February 2012
Introduction to Program Budgeting Katherine Barraclough Consultant, World Bank Fiscal Management Reform Workshop, Istanbul, Turkey, June 6-8, 2005.
Medium-term Expenditure Framework - with Korea’s experience -
Rollout of Programme Budgeting in Armenia: Experience from the DFID-led project Mark Worledge and Suren Poghosyan February 2009.
1 CE Results Framework for PRSCs in Lao PDR September 2, 2004 Moira Hart-Poliquin Chirine Alameddine The World Bank Institute.
SYSTEM OF EVALUATION AND MANAGEMENT CONTROL RESULTS-BASED BUDGETING THE CHILEAN EXPERIENCE Heidi Berner H Head of Management Control Division Budget Office,
The Medium Term Expenditure Framework
1 Experiences of Using Performance Information in the Budget Process OECD 26 th March 2007 Teresa Curristine, Budgeting and Public Expenditures Division,
Australia’s Experience in Utilising Performance Information in Budget and Management Processes Mathew Fox Assistant Secretary, Budget Coordination Branch.
Public Finance Reform in Slovakia Roland Clarke World Bank Ministry of Finance Slovak Republic September 6, 2005.
0 Linking Policy, Planning and Budgeting : Korean Experience and Challenges February 6, 2007 February 6, 2007 Kang Ho Lee
MTEF/Top-down Budgeting for Korea Dong Yeon Kim The World Bank.
0 Kestutis Rekerta Strategic Planning Division, Government Office of Lithuania World Bank Workshop, Bratislava, September 6, 2006 STRATEGIC PLANNING IN.
The MTEF in Practice - Reconciling Conflicting Claims Malcolm Holmes.
Focusing and integration PEM reforms to ensure they ‘matter’ Bank work in Armenia, 2005 Matthew Andrews ECSPE.
A Preliminary Review of the MTEF Experience in Africa Philippe Le Houerou Rob Taliercio AFTM1.
0 Linking Policy, Planning and Budgeting : Korean Experience and Challenges February 7, 2007 February 7, 2007 Kang Ho Lee
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Medium-Term Budgeting in Moldova Progress and Future Challenges February 2008.
Information Flow For MTEF Operation and its implication to the Korean Government March, 19, 2004 Seoul, Korea Junghun Cho World Bank.
Successful Installation of MTEF in the Korea’s Fiscal System Seok-Kyun Hur Korea Development Institute March 15, 2004.
Collaborative Africa Budget Reform Seminar Budget Reform in Mauritius
REPUBLIC OF BULGARIA MINISTRY OF FINANCE CURRENT CHALLENGES IN BUDGET REFORM SOFIAMR. LYUBOMIR DATZOV 03 DECEMBER 2004DEPUTY MINISTER
Linking between Planning and Budget : Korea’s Experience and Lessons Dong Yeon Kim Ministry of Planning and Budget Republic of Korea For PRODEV, Inter-American.
Karnataka Public Financial Management and Accountability Study Launch Presentation September 14, 2004.
1 Highlights of Gaps in the Preparation of MTBF/MTFF/MTEF Governments in Africa introduced: The Medium Term Budget/Fiscal/Expenditure Frameworks (MTBF,
1 Public Finance Management Reform The Georgian Experience 2008 ICGFM Winter Conference December, 2008.
Introduction to Program Budgeting
Our role: fiscal analysis
Public Expenditure Management Conference Presentation by Ministry of Finance of Georgia Warsaw February 7-9, 2005.
National Budget Unit Ministry of Finance and Economic Planning Rwanda
Medium Term Expenditure Planning for Sustainable Development.
PREPARATION OF MEDIUM TERM FRAMEWORKS
Reform of the Public Financial Management System in Korea
Budget Formulation: good practices
MEDIUM TERM EXPENDITURE FRAMEWORK
Reforms to Budget Formulation in Uganda
Program budgeting in the Kyrgyz Republic
Presentation on Expenditure Management By Team GVF
IFMIS ROLE IN BUDGET PROCESS
Budgeting systems : Monitoring and Evaluation
Medium-Term Expenditure Framework: Lessons
Public Expenditure Management Conference Presentation by Ministry of Finance of Georgia Warsaw February 7-9, 2005.
IMF Spring Meetings April 2011 Public Financial Management
Progress in reforming budget elaboration process
Eastern Europe SBO Meeting Chung-Keun Park
MTEFs :objectives and preconditions
MTEF Lessons of Experience:
Linking planning, policy and budgets : experience with MTEFs
Making Budget Reform Matter for the Poverty Reduction
MTEF Implementation in Korea Ministry of Planning and Budget
Presentation transcript:

Introduction to MTEF in Korea Doyoung Min The World Bank

2 Public Expenditure Public Expenditure Analysis (PEA) Public Expenditure Analysis (PEA) “What” is to be done Public Expenditure Management (PEM) Public Expenditure Management (PEM) “How” it is to be done

3 Public Expenditure Analysis The role of the state The role of the state Public spending and budget deficit Public spending and budget deficit Efficiency Efficiency Equity Equity Fiscal decentralization Fiscal decentralization

4 Public Expenditure Management MTEF MTEF Linking policy, planning and budgeting Performance management Performance management Integrated Financial management information system (IFMIS) Integrated Financial management information system (IFMIS) Fiscal transparency Fiscal transparency

Medium-Term Expenditure Framework

6 Background of MTEF Changing role of budgeting Changing role of budgeting from control (spending) to management (policy) Increasing difficulty of maintaining fiscal soundness Increasing difficulty of maintaining fiscal soundness slowed economic growth, built-in entitlement Growing demand for public spending Growing demand for public spending aging population, education, social welfare Demand for more democratized and transparent budgeting process Demand for more democratized and transparent budgeting process

7 Objectives of MTEF Integrating national policy priorities Integrating national policy priorities into annual budget Providing medium-term perspective Providing medium-term perspective on expenditure plan Enhancing operating efficiency with increased Enhancing operating efficiency with increased LMs’ discretion over their spending Strengthening feedback and accountability Strengthening feedback and accountability mechanism by performance management

8 International Experiences (1) Coverage of MTEF Responsibility of economic assumption Multi-year cost estimate for new spending Sweden 3 yrsMOFAll spending items UK 5 yrsCBOAll spending items Australia 4 yrsCBOAll spending items NZ 2 yrsMOFAll spending items Netherlands 4 yrsCPBAll spending items Norway varyingMOFNo USA N/A All spending item MOF: different part of MOF/Treasury, CBO: central budget office, CPB: Central Planning Bureau Source: OECD-World Bank Budget Practices and Procedures Database

9 International Experiences (2) Basis of setting spending limit for ministries Final decision on ministries’ spending Arrangement in congress to establish total budget before individual item Arrangement in congress to establish total budget before individual item Sweden SwedenMTEFPrime MinisterYes UKMTEFMOFNo AustraliaMTEFCabinetNo NZMTEFCabinetNo NetherlandsMTEFCabinetYes NorwayN/ACabinetYes USASuggestion onlyPresidentYes Source: OECD-World Bank Budget Practices and Procedures Database

10 Lessons from International Experiences Integration of multi-year planning with annual budget Integration of multi-year planning with annual budget MTEF and annual budgeting is ‘one’ process Honest/realistic macroeconomic forecasting Honest/realistic macroeconomic forecasting Separation of total budget from detailed program Separation of total budget from detailed program Clarification of new roles of MOF/line ministries Clarification of new roles of MOF/line ministries Capacity building and incentives for MOF/LMs Capacity building and incentives for MOF/LMs Development of feedback mechanism Development of feedback mechanism

MTEF in Korea

12 Budgeting in the Past Centralized and itemized budgeting Centralized and itemized budgeting Input control High reliance on bottom-up approach High reliance on bottom-up approach MPB’s deep involvement in program budgeting MPB’s deep involvement in program budgeting Lack of macro perspectives Lack of macro perspectives Separated, individual fiscal initiatives Separated, individual fiscal initiatives

13 Past Fiscal Reform Efforts Strengthen linkage between formulation Strengthen linkage between formulation and execution Bring in incentive system for expenditure savings Bring in incentive system for expenditure savings Pilot performance-based budgeting Pilot performance-based budgeting Introduce double-entry accounting system Introduce double-entry accounting system Improve aggregate expenditure control Improve aggregate expenditure control Introduce ex-ante evaluation system Introduce ex-ante evaluation system for major projects

14 Recent Fiscal Reform Initiatives 2003: Design and preparation of PEM reform 2003: Design and preparation of PEM reform NFMP, Top-down, Performance management 2004: Implementation of a series of fiscal reform initiatives 2004: Implementation of a series of fiscal reform initiatives National Fiscal Management Plan covers 5 years on a rolling basis includes General account, Special accounts, and Funds Top-down budgeting MPB gives sectoral ceilings to LMs Performance management Program budgeting Digital budget and accounting system 2005: Strengthen the link among reform initiatives 2005: Strengthen the link among reform initiatives FY06 budget prepared through new PEM system

15 Korea’s MTEF NFMP + Top-down NFMP + Top-down Benchmarked Swedish model Benchmarked Swedish model MPB’s initiatives / Champion MPB’s initiatives / Champion Track-record: Economic Planning Board ( ) planning and budgeting functions reside under one roof Strong leadership (President) was backed up Strong leadership (President) was backed up Lack of Parliament’s participation Lack of Parliament’s participation

16 New Budget Process (1) Stage I : Macroeconomic Forecasting and Long-term Fiscal Management Planning Stage I : Macroeconomic Forecasting and Long-term Fiscal Management Planning Forecast macro variables for fiscal policy purpose Consider social, political and international factors Strengthen MPB’s role consult with MOFE, Bank of Korea and public/private research institutes strengthen MPB’s capacity of macroeconomic analysis and institutional coordination

17 New Budget Process (2) Stage II : Fiscal Targeting, Budget Envelope, and Sectoral Allocation Stage II : Fiscal Targeting, Budget Envelope, and Sectoral Allocation Fiscal targeting based on macro variables and policy objectives Set out budget envelop with updated cost estimates Sectoral allocation according to national policy priority, previous year’s performance information, and unexpected events * Sectoral categories vary by country Sweden(27), Canada(10), Norway(by Ministry)

18 New Budget Process (3) Stage III : Cabinet Meetings Stage III : Cabinet Meetings Prepared by MPB in consultation with President Budget envelop Sectoral ceiling Major national policies 2-day Cabinet meeting for consensus building (held on April 30 and May 1 for FY06 budget)

19 New Budget Process (4) Stage IV: Line Ministries’ Requests Stage IV: Line Ministries’ Requests Line ministries prepare budget request within provided sectoral ceiling In line with sectoral policy priority Increased discretion MPB’ guidelines for formulating budget proposal Tools for consistent budget presentation, analysis, statistics Gradual phase-out of interventional aspects

20 New Budget Process (5) Stage V: Review and Documentation Stage V: Review and Documentation MPB reviews LMs’ budget request checking the sectoral ceiling examine programs according to agreed sectoral priorities MPB’s active interaction with line ministries Sufficient involvement of the President in budgeting process

21 Total Expenditure Setting For multi years MTEF Process MTEF Process Sectoral Budget Preparation Macro- economic forecasting Sectoral Ceiling Setting for multi years Fiscal Target New sectoral demand for t+2 (priority/cost) Annual Budget Formulation Updated cost estimate of existing policy/program

22 Changes Made Medium-perspective on expenditure framework Medium-perspective on expenditure framework NFMP + annual budgeting Focus on Performance Management Focus on Performance Management Created Performance bureau Organizational Restructuring Organizational Restructuring Matrix: Function and Sector Strengthened Strategic Planning role Address budgetary basics Address budgetary basics Budget and Accounting Reinvention Office Introduce Program budgeting IFMIS

23 Challenges Remained (1) Integration of NFMP to annual budget Integration of NFMP to annual budget Annual budget should be the first year budget of NFMP Macro-forecasting capacity Macro-forecasting capacity MPB’s internal capacity building Cooperation between MPB and MOFE Bank of Korea, research institutes International cases: UK, Sweden, and France

24 Challenges Remained (2) Players’ willingness and commitment Players’ willingness and commitment Understanding of PE and MTEF MPB’s proper guideline for LMs Identification of new roles Autonomy and Accountability: MPB and LMs Change of organizational culture in addition to organizational restructuring Change of organizational culture in addition to organizational restructuring Performance-oriented Comprehensive government reform including civil service system