Business Sensitive | 1 Horizon Energy Group [Solar PV]x[Microgrids] The Matrix Solution SunSpec Alliance Members Steve Pullins, President February 2013.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
NET METERING & FEED IN TARIFF REVIEW IURC Technical Conference
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Utility Planning Perspective For A Solar Feed In Tariff (FIT) February 3, 2009 Gainesville Regional Utilities.
Fill in missing numbers or operations
/ /17 32/ / /
Reflection nurulquran.com.
INVESTMENTS IN POWER SECTOR
1
Worksheets.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
Presented by The Coal Rush Revisited: R. W. Beck, Inc. IPED COAL POWER CONFERENCE January 18-19, 2007 St. Petersburg, FL Nicholas P. Guarriello An Economic.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Technical & Economic Assessment Grid, Mini-grid & Off-grid Electrification Technologies Chubu Electric Power Co.,Inc. (CEPCO) Toyo Engineering Co. (TOYO)
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
Electric cars: part of the problem or a solution for future grids? Frans Nieuwenhout, Energy research Centre of the Netherlands ECN Sustainable.
August 31- September 1, 2011 Rio de Janeiro, Brazil
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Summative Math Test Algebra (28%) Geometry (29%)
Year 6 mental test 5 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
District heating year District heating and cooling 2013 Heat sales (incl. taxes)2 330 mill. Sold heat energy31,6 TWh Average price of.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Division- the bus stop method
ABC Technology Project
1 6/20/13 June 20, 2013 Mac McLennan President and CEO Minnkota Power Cooperative Generation Choices.
Transform PV to Load Capacity Status by Coupling PV Plants to CAES Plants James Mason Renewable Energy Research Institute ASES Forum on Solar and the Grid.
Can Renewable Energy Solve the Climate Problem? Geoffrey Heal Columbia Business School October
POTOMAC WIND ENERGY Presents: Small Wind Turbines for residential and business use. May 2008.
Texas Energy Independence Week Renewables & Natural Gas: Confluence, Conflict, or Something In Between? February 23, 2011 Todd Foley Senior Vice President,
7. PV System Sizing Herb Wade Consultant
© S Haughton more than 3?
The Longevity Economy The Emerging Market in Plain Sight.
First Solar FuelSmart™: Powering Energy Security
The Australian Renewable Energy Agency and the New Energy Course Argus Australia Power Generation Fuels 27 February 2013.
Adding Up In Chunks.
Sets Sets © 2005 Richard A. Medeiros next Patterns.
BI Marketing Analyst input into report marketing Databook TitleGlobal Renewable Support Mechanisms Databook 2014 Databook SubtitleOverview of all the renewable.
“Energiewende” and cost mechanisms Charlotte Loreck Energy and Climate Division Öko-Institut e.V. Berlin for Heinrich Böll Foundation 5 December 2012.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
Week 1.
Energy Storage on the Grid: Informing Future Development Eric Hittinger Advisors: Jay Whitacre, Jay Apt Department of Engineering and Public Policy Carnegie.
We will resume in: 25 Minutes.
Essential Cell Biology
Resistência dos Materiais, 5ª ed.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
How Cells Obtain Energy from Food
Energy Generation in Mitochondria and Chlorplasts
Five Years of Green EffortsFive Years of Green Efforts “Commitment to Zero” Mary Harris, Physical Sciences Earth Day at GCC April 22, 2013.
Energy Year 2014 Electricity Finnish Energy Industries.
Presentation transcript:

Business Sensitive | 1 Horizon Energy Group [Solar PV]x[Microgrids] The Matrix Solution SunSpec Alliance Members Steve Pullins, President February 2013

Business Sensitive | 2 Horizon Energy Group Solar PV Ties to Microgrid Multiple resources Campus rooftops Active controls to support dispatch and load management Effective use of energy storage that can work in conjunction with PV Above average use of renewables

Business Sensitive | 3 Horizon Energy Group [Solar PV]x[Microgrids] Low Capacity Factor Low O&M Cost At or Near Peak Load No Min Capacity at Night No Emissions No Fuel Transport Cost Very High Capacity Factor Cost Competitive: MW Resource Portfolio Large Diurnal Power Difference Emissions Reduction Very High Reliability Important Questions: Will natural gas be a long-term baseload affordable fuel resource? Will biogas or biomass become a long-term baseload affordable fuel resource? Will the capital cost of installing solar PV continue to lower – lower LCODE? The truth of LCODE (levelized cost of delivered energy)

Business Sensitive | 4 Horizon Energy Group Example: 1 Microgrid / 3 Sites / 7 Systems …in San Diego

Business Sensitive | 5 Horizon Energy Group Natural Gas Challenge

Business Sensitive | 6 Horizon Energy Group Natural Gas Challenge Source: EIA AEO

Business Sensitive | 7 Horizon Energy Group Natural Gas Challenge Source: EIA AEO2012

Business Sensitive | 8 Horizon Energy Group Natural Gas Challenge Source: EIA AEO2012

Business Sensitive | 9 Horizon Energy Group Projecting Volatility Source: EIA AEO2012

Business Sensitive | 10 Horizon Energy Group Natural Gas Competition Source: EIA AEO2012

Business Sensitive | 11 Horizon Energy Group Emissions Challenge Source: EIA AEO2012

Business Sensitive | 12 Horizon Energy Group Renewables Challenge Source: EIA AEO2012

Business Sensitive | 13 Horizon Energy Group Energy Storage Challenge Source: EIA AEO2012

Business Sensitive | 14 Horizon Energy Group Case Study – Sports Venue 4.2 MW of PV 1.6 MW of energy storage 107% renewable energy served for venue load (523 MWh excess) Consider 50 MWh excess production available for charging 228 kWh available for charging at 219 events annually for 3 hrs 76 EV’s charged on solar energy The sports venue has a unique customer service that can set it apart. Now consider the dispatchable 76 kW regulation service that could be used by the utility on this 10 MVA circuit at a peak time.

Business Sensitive | 15 Horizon Energy Group Load and Resource Profile

Business Sensitive | 16 Horizon Energy Group Levelized Cost of Energy (LCOE at Gen Output) Source: EIA AEO2012 Capacity Factor? 2017 NG Fuel Cost runs ~$4.30/mmBTU. None of these costs include the T&D costs to get the power to the consumer, which adds ~10%.

Business Sensitive | 17 Horizon Energy Group Levelized Cost of Energy (LCOE at Gen Output) Source: EIA AEO2012 “The levelized cost calculations presented in the tables apply only to utility-scale use of those technologies.”

Business Sensitive | 18 Horizon Energy Group OK, Let’s Talk Capacity Factors Source: Data from EIA Electric Power Annual 2011 (Jan2013) 2011 Fleet Average Capacity Factor = 43.2%

Business Sensitive | 19 Horizon Energy Group Levelized Cost of Delivered Energy (LCODE) Technology Cap. Factor Corrected Cap. Factor LCOE ($/kWh) Corrected LCOE ($/kWh) LCODE ($/kWh) Coal85%63.8% $ $0.139 $0.157$0.173 NG-fired CC87%42.2% $ $0.090 $0.158$0.174 NG-fired CT30%10.1% $ $0.128 $0.342$0.376 Nuclear90%90.3%$0.114 $0.125 Geothermal91% $0.098 $0.108 Biomass83% $0.115 $0.126 Wind33%33.9%$0.096 $0.106 Central Solar PV25% $0.153 $0.168 Distributed PV*22% $0.136 / $0.075** Hydro53%39.8%$0.089$0.119$0.131 All in 2010 USD *One of our projects - 7% cost from Energy Storage **With Federal Investment Tax Credits

Business Sensitive | 20 Horizon Energy Group Conclusions The distributed solar PV resource will almost always find a place in microgrids because of the cost and partial coincidence with peak load. Need to push lower PV installation costs. Need more high quality PV sources that prove 30+ year lifetimes. While the 0.5% annual degradation could be lower, it is financially workable now. Converged distributed PV / Energy Storage provide options that are well suited to microgrids.

Business Sensitive | 21 Horizon Energy Group Thank you! Questions? Contact info: Steve Pullins