December 12, 2007. Substation Business Applications using CIM / PI AF by Stephen Diebold Manager – Real Time Systems Kansas City Power & Light.

Slides:



Advertisements
Similar presentations
1 Senn, Information Technology, 3 rd Edition © 2004 Pearson Prentice Hall James A. Senns Information Technology, 3 rd Edition Chapter 7 Enterprise Databases.
Advertisements

PG&Es 2009 Participating Load Pilot. 2 Overview Regulatory Context Pilot Characteristics Lessons Next Steps.
18 Copyright © 2005, Oracle. All rights reserved. Distributing Modular Applications: Introduction to Web Services.
THE VIRTUAL ILLINOIS CATALOG (VIC) Jan Ison Lincoln Trail Libraries System OCLC Advisory Committee for Public Libraries June 6, 2000.
Copyright © 2006 Data Access Technologies, Inc. Open Source eGovernment Reference Architecture Approach to Semantic Interoperability Cory Casanave, President.
FPUA Storm Readiness 2007 Florida Public Service Commission Internal Affairs May 23, 2007 Craig Brewer- Superintendent of Electric T&D.
JEA Storm Readiness 2006 Florida Public Service Commission Internal Affairs June 5, 2006 Presenter: Ted Hobson, VP, Fuels, Purchased Power & Compliance.
Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell Missouri Public Service Commission.
Serving PI in a Geospatial World Amie Evans Seattle Regional Seminar November 10, 2009.
Introduction Lesson 1 Microsoft Office 2010 and the Internet
Condition Monitoring Roles in Asset Reliability and Regulatory Compliance Dave Haerle, Los Angeles Department of Water and Power Scott Kunze, DataSplice.
IBM SMB Software Group ® ibm.com/software/smb Maintain Hardware Platform Health An IT Services Management Infrastructure Solution.
Join Us Now at: Enabling Interoperability for the Utility Enterprise And TESTING.
Introduction to Office 365
CA's Management Database (MDB): The EITM Foundation -WO108SN.
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
Continued Investment in ATML
1 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. PI Maximization Strategy at Duke Energy Tim Murphy IT Manager.
© 2009 OSIsoft, LLC. – Company Confidential 1 Empowering Business in Real Time Regional Seminar Series Presents: Darryl Hammond, Maintenance Program.
SQL Based Data Access Bodo Bachmann.
© 2008 OSIsoft, Inc. | Company Confidential Event Frames Initiative Update Chris Nelson Chris Coen Chris Nelson Chris Coen.
1 OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential OCEANIA TECHNOLOGY SEMINAR 2008 How PI Notifications ensures that SmartSignal’s.
June 2010 At A Glance The Room Alert Adapter software in conjunction with AVTECH Room Alert™ devices assists in monitoring computer room environments as.
Utility Integration Bus Architecture (and Implementation) the KCPL CIM / UIB Project EMS Users Group June, 1999 Pat Brown, KCPL John Kishpaugh, KCPL.
Creating a single source of truth for a distribution network model
1 Value now. Value over time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Using OSIsoft to Become Compliant James Cosgrove, Northeast Utilities.
© 2008 OSIsoft, Inc. | Company Confidential IT Application Monitoring Using PI AF and Notifications Josiah Thoen - AEP.
© Copyright 2014 SISCO. All Rights Reserved Using IEC and CIM for Disturbance Data Management CIGRÉ 2014 – UCAIug Stand # August
BTW (“By The Way…”) Information Annotation By Rudd Stevens, Jason Endo University of San Francisco.
© ABB Ltd ABB Experience Neela Mayur CIM Users’ Group Meeting June 12, 2008.
EPRI Smart Grid Demonstration and CIM Standards Development
© 2008 OSIsoft, Inc. | Company Confidential Reduce Maintenance Cost connecting AF, RLink and Sap PM in Erg G. Conigliaro - Erg G. DiBartolo - Visiant.
Trends in SCADA Technology for Public Power
1 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Integrating Disparate Platforms for Consistent Analysis and Batch.
1 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Reaching across boundaries, collaboration, Web Parts, and Notifications.
Join Us Now at: Enabling Interoperability for the Utility Enterprise And TESTING.
Getting Planning Tools Closer To Real-Time and Operation CIM User Group Meeting Austin, TX October 23-26, 2007 Loris Arnold (516)
The Utilization of GIS Technology at Northeastern REMC Presented By: Steven Weber, GISP Northeastern REMC (260)
The Evolution of Fleet Management How do you get device information now? Manually? Configuration pages?
OPPD’s Sustainability Efforts Denise Kuehn. Omaha Public Power District Public Utility –336,000 Customers –2,200 Peak –Generation (2,550 MW) –Transmission.
© 2008 OSIsoft, Inc. | Company Confidential Analytics and Notifications Michael Hesselbach Beth McNeill Michael Hesselbach Beth McNeill.
GIS at Bangor Hydro February 5, 2004 Gary Duplisea Steve Severance Kris Dean.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
Common Information Model and EPRI Smart Grid Research
EDISON INTERNATIONAL® SM SCE Project Story CIM User Group 10/12/2010 Jim Horstman Southern California Edison.
Real Time Data As A Corporate Asset Presenters: Steve Browder John Rodgers.
©2005 Aspen Technology, Inc. All rights reserved. Oil & Gas Integrated Operations using aspenONE Nick Barnett.
Systems Integration Specialists Company, Inc. The Standards Based Integration Company © Copyright 2010 SISCO, Inc. 1 Introduction to SISCO For CIM Users.
Monitoring EMS Infrastructure Ann Moore San Diego Gas & Electric September 13, 2004 EMS Users Group Meeting-St. Louis.
RtPM for Asset and Environmental Monitoring Dave Wilson - National Grid Paul Verey - Capula.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
© 2008 OSIsoft, Inc. | Company Confidential Partner Challenge TransparaSmartSignalSISCOTransparaSmartSignalSISCO.
“ 2005 EMS Users Group Meeting”
1 VALUE NOW, VALUE OVER TIME © 2010 OSIsoft, Inc. | Company Confidential Empowering Business in Real Time. © Copyright 2010, OSIsoft LLC. All rights Reserved.
Technology is Integral to Corporate Culture May 8 th, 2008 H. Kevin Stogran Director - Market Operations Support OSISoft Regional Conference, Kansas City.
TC 57 PSCE09 - CIM Status Update Panel Session Introduction Ed Dobrowolski, NERC.
Analysis Framework PI AF 2.0 Foundation Project
Yokogawa Global MES Solution Centre (GMSC)
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
Using CIM and PI AF for Model-Driven Asset Management Darren Brungardt Kansas City Power & Light.
PI Notifications and ProcessBook 3.1
How AEP is Approaching the Information Management Crisis by Leveraging OSIsoft’s Suite of Tools Bill Sigmon Sr. Vice President Fossil and Hydro Generation.
MIT requirements from the TSO perspective MIDDLEWARE IMPROVED TECHNOLOGY (MIT) for increased resilience of Interdependent Critical Infrastructure ROME,
1 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group via LiveMeeting June 18, 2008 Transmission & Distribution Webinar PI for Asset Model and.
Automating Work Order Processes for Advanced Metering Infrastructure (AMI) Devices with Collector for ArcGIS and Portal for ArcGIS Subrahmanyam Pendyala.
IEC Part Discussion (IEC 62541/OPC UA for CIM) Jim Luth
Leadership in IEC Technology
Using CIM and PI AF for Model-Driven Asset Management
Facilitator: Ralph Mackiewicz, SISCO
Presentation transcript:

December 12, 2007

Substation Business Applications using CIM / PI AF by Stephen Diebold Manager – Real Time Systems Kansas City Power & Light

Overview of KCP&L CIM / PI AF Project A Convergence of Opportunities Main Goal Situation Without Project Closing the Loop Asset-Related Applications Applications Interoperability Test Project Status Questions Agenda

Over 810,000 customers Peak in excess of 5,660 MW Service territory across 47 counties in MO and KS covering 17,934 sq. miles Over 3,170 employees 30 office/service center locations 9 generation plant sites and 10 peaking facilities 3,309 miles transmission lines 24,466 miles of overhead distribution lines 3,400 miles of underground distribution lines 322 substations

CIM/PI AF Project A Convergence of Opportunities EMS comes with PI Historian –Stores history of EMS real-time point data –PI features for model-based access to tags –Utilizes standards-based CIM model for EMS database configuration

CIM/PI AF Project Main Goal Transmission Engineering Interest in moving from Event-based maintenance to Condition-Based Maintenance

CIM/PI AF Project Situation Without Project EMS.. field devices  EMS gathering 50,000+ points of real-time data CIM DE Environment  CIM database where equipment and associated real-time data points defined for EMS.. PI Server  Point data history stored in PI tags, but accessible only by point name AF  PI product (AF) able to model equipment’s relationships to tags, but product not currently used

PI Server AF CIM/PI AF Project Closing the Loop Network Manager EMS. CIM DE Environment... field devices GDA (Utility Integration Bus) Create infrastructure for generalized retrieval of historic real-time information –on equipment basis (by reference to equipment location in system) –on asset basis no matter where asset has been moved in system Generalized retrieval is essential to the creation of applications Export CIM model data to PI AF product Create PI equipment / asset model for retrieving historic tag data

CIM/PI AF Project Asset-Related Applications PI Server AF Network Manager EMS. CIM DE Environment... field devices Asset Management System Condition-Based Maintenance Applications Condition-Based Maintenance Applications for transformers and breakers GDA (Utility Integration Bus) First step toward “dashboard” access to real-time Operations data Desktop access Paging/ notification Web access

Interoperability Test Demonstrate interoperability between ABB, SISCO and OSISoft’s products based on the CIM and/or GDA. Verify compliance with the CIM for those CIM classes/attributes involved in the information exchanges. Demonstrate the exchange of power system models using the CIM and an RDF schema and XML representation of the model data. Demonstrate exchange between ABB and SISCO products using the services defined in the GDA Client and Server interface standard.

Interoperability Test VendorProduct NameTests ABB Network Manager, CIM DE Toolkit Full Import using CIM XML and GDA services Incremental Import using CIM XML and GDA services OSISoft, LLC PI AF PI System Explorer Storage of the ABB model data Review and browsing of the ABB model data SISCO, Inc. Part number: UIB- PIWRAP Version Beta PI Adapter Full Import using CIM XML and GDA services Incremental Import using CIM XML and GDA services Provide UIB message bus for transport and communication

Project Status FAT completed June 4, 2010 SAT is being scheduled Interoperability tests completed June 9, 2010

Questions

December 15, 2007 Contact information: