An Informative Workshop California Hospital Projects from A to Z... Tips from the Experts 1.

Slides:



Advertisements
Similar presentations
WELCOME BUDGET MANAGERS AND CHIEF FISCAL OFFICERS
Advertisements

1 Isolation and Quarantine Protocol Public Health Seattle and King County 2004.
Alabama Primary Health Care Association
Elements of an Effective Safety and Health Program
Knowledge Dietary Managers Association 1 DMA Certification Exam Blueprint and Curriculum Development.
RECORD KEEPING Cooperative Development of Operational
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
1 Assessing Health Needs Gilbert Burnham, MD, PhD Johns Hopkins University.
NTDB ® Annual Report 2009 © American College of Surgeons All Rights Reserved Worldwide Percent of Hospitals Submitting Data to NTDB by State and.
The Managing Authority –Keystone of the Control System
NPA WG : Single and multiple releases
Harmonized implementation of CDM Accreditation CDM-Accreditation Panel.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
1 POST FORM How does this affect me?. 2 Tennessees Health Care Decision Act In 2004, the Health Care Decision Act was passed thus revising Tennessee law.
Consistency Review Process Packet Complete Pre-Review Assistance Resolve Issues Day 24/44 Proposed Determination Day 29/49 Deadline to Elevate Day 30/50.
1 Solicitations/Advertisements Solicitations/Advertisements
1 ICOTS What weve learned since October 6, GETTING STARTED.
CE PUWER. Which legislation applies? Which legislation applies? Product legislation Free movement of goods Employment legislation Employee protection.
1 THE SCHOOL SITE COUNCIL. 2 WHAT IS A SCHOOL SITE COUNCIL, AND WHO ARE MEMBERS? The School Site Council (SSC) is an elected or selected group representative.
Site Safety Plans PFN ME 35B.
Engagement in Human Research & Multi-Site Studies K. Lynn Cates, M.D. Assistant Chief Research & Development Officer Director, PRIDE May 30, 2012.
MSCG Training for Project Officers and Consultants: Project Officer and Consultant Roles in Supporting Successful Onsite Technical Assistance Visits.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
NOTICE SUBMISSIONS Requirements and Procedures 1.
Privacy Impact Assessment Future Directions TRICARE Management Activity HEALTH AFFAIRS 2009 Data Protection Seminar TMA Privacy Office.
P-Card User Guide Standard Profile July RCNJ-BOA Purchasing Card User Guide – Standard Profile Ramapo College and Bank of America VISA Procurement.
1 How to Enter Time. 2 Select: Log In Once logged in, Select: Employees.
Georgia has Led the Nation for 3 Consecutive Years.
EMS Checklist (ISO model)
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Effectively applying ISO9001:2000 clauses 6 and 7.
DBE Uniform Reporting: Understanding and Avoiding Common Errors Office of Civil Rights January 2014.
Housing Notice H Use of New Regulation Section 8 Housing Assistance Payments (HAP) Contracts Residual Receipts to Offset Project-Based Section.
Property Management Contract Oversight VDOTs Outsourced Safety Rest Area Program November 15, 2013 Maintenance Division.
1. 2 Earthquake effects on health care facilities 2.
Customer Service.
Presenter: Karen Fligger, US EPA. Decentralized Wastewater Treatment Managed onsite or cluster wastewater systems used to collect, treat, and disperse.
1 Preparing for Smallpox: Post-event Smallpox Response.
Federal Tort Claims Act (FTCA) Free Clinics Program Technical Assistance Call Department of Health and Human Services Health Resources and Services Administration.
Registered Nurse Education Programs Capitation & Special Programs Funding Webinar Presented by: Barbara Zendejas, Melissa Omand and Manuela Lachica,
Checking & Corrective Action
2014 National Patient Safety Goals
General OH&S Induction Training Course 1 WHAT’S SO IMPORTANT ABOUT OCCUPATIONAL HEALTH & SAFETY? IN THE YEAR 2003, MORE PEOPLE WERE KILLED IN WORK RELATED.
There are three types of emergencies:  Internal  External  Natural disasters.
THE COMMONWEALTH FUND Figure 1. Policymakers Cite an Adequate Workforce, Improving Quality, and Securing Adequate Financing as the Most Urgent Challenges.
Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
Functional Areas & Positions
Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
7/16/08 1 New Mexico’s Indicator-based Information System for Public Health Data (NM-IBIS) Community Health Assessment Training July 16, 2008.
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
Reporting Serious Incidents in TFACTS
1 Office of New Teacher Induction Introducing NTIMS New Teacher Induction Mentoring System A Tool for Documenting School Based Mentoring Mentors’ Guide.
NIMS Resource Management IS-700.A – January 2009 Visual 5.1 NIMS Command and Management Unit 5.
© Copyright, The Joint Commission 2015 National Patient Safety Goals.
Comprehensive User Fee Study
December 9, 2014 San Diego County Office of Education ESFG Meeting Tyree Dorward:Attorney, Best, Best, & Krieger Guiselle Carreon: Commercial Warrants.
MIS (Management Information System)
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Chris Tokas S.E. Manager, Hospital Seismic Retrofit Program Office of Statewide Health Planning and Development Status of the California Hospital Seismic.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
OSHPD Process LOS ANGELES AREA NFSA CHAPTER MEETING October 22, 2014.
Global Connections Day Building Safety Service Provider
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
City Council Meeting August 27, 2018
Presentation transcript:

An Informative Workshop California Hospital Projects from A to Z... Tips from the Experts 1

Session 1 – OSHPD Presentation Agenda/Topics The History of the Guide OSHPD FDD W 5 - who, what, when, where, and why? Seven areas of FDD responsibility:  Develop Building Standards for hospitals, skilled nursing, clinics, and Correctional Treatment Centers  Plan review and approval of hospital and skilled nursing construction projects  Building permit and construction observation of hospital and skilled nursing construction projects  Hospital Seismic Retrofit Program (SB 1953)  Hospital Building Safety Board (Advisory and Appeals Board)  Emergency response after an earthquake or other disaster  Research: earthquake engineering; new & advanced technologies; computer analyses FDD’s Quality of Service Survey CPR POTS and PANS eSP Q & A 2 Will not be line-by-line or paragraph-by paragraph review of the Guide Will provide additional Tips not found in the Guide

Session 1 – OSHPD Presentation Facilities Development Division (FDD) is the Building Department for California’s Hospitals 3

Session 1 – OSHPD Presentation FDD’s Jurisdiction/Funding:  1,709 healthcare facilities  More than 4,000 buildings  213,013 licensed beds  Funding source: Fees paid by hospitals and SNFs for plan review and building permits of construction projects. Fees have not increased since January 23, 1992 (more than 21 years)  1.64% of construction costs for hospitals  1.5% of construction costs for SNFs  2 office locations to serve clients:  400 R Street, Sacramento, CA  700 N. Alameda Street, Los Angeles, CA 4

Session 1 – OSHPD Presentation FDD’s Organization: Sacramento Office  Building Safety Section (3 Regions)  Rapid Review Unit (Sacto + LA)  Building Standards Unit  Structural Support Section  Division Support Section Los Angeles Office  Building Safety Section (3 Regions)  Fire Prevention Unit  Inspection Services Unit 5

Session 1 – OSHPD Presentation 6 Geographical Regions Sacramento Office  Central Region  Coastal Region  North Region Los Angeles Office  North Los Angeles Region  South Los Angeles Region  South Region 6

Session 1 – OSHPD Presentation Results of the 1971 Sylmar Earthquake On Hospital Buildings Why Have an OSHPD/FDD? 7

Session 1 – OSHPD Presentation Results of the 1994 Northridge Earthquake On Hospital Buildings Why Have an OSHPD/FDD? Why is hospital safety important?  Safety of patients and staff  Evacuation of seriously ill patients can be fatal  Patients may be exposed to additional risks due to the time needed to evacuate them  Hospitals are needed to provide medical assistance to disaster victims  Hospitals serve as a beacon of life and hope for a community following a catastrophic event  Important to protect taxpayer, community, and investor dollars  Replacing a hospital building after it is destroyed can take a decade or longer  Prolonged earthquake recovery inhibits an area’s long-term economic & social renewal, as well as its healthcare access 8

Session 1 – OSHPD Presentation Seven areas of FDD responsibility:  Develop Building Standards for hospitals, skilled nursing, clinics, and Correctional Treatment Centers  Plan review and approval of hospital and skilled nursing construction projects  Building permit and construction observation of hospital and skilled nursing construction projects  Hospital Seismic Retrofit Program (SB 1953)  Hospital Building Safety Board (Advisory and Appeals Board)  Emergency response after an earthquake or other disaster  Research: earthquake engineering; new & advanced technologies; computer analyses 9

Session 1 – OSHPD Presentation In addition to the CBSC, FDD has C.A.N.s and P.I.N.s What is a C.A.N. (Code Application Notice) HFSSA § Code Application Notice – formal, enforceable interpretation of the California Building Standards Code What is a P.I.N. (Policy Intent Notice) Preliminary/proposed regulations to enact a new statutory requirement or program prior to formal adoption of a building standard or regulation Also used to formalize a voluntary program such as OSHPD Seismic Certification program (OSP), Phased Plan Review (PPR), etc. 10

Session 1 – OSHPD Presentation Higher Standards for Performance of Hospital Buildings in California  Commercial buildings may not be repairable or functional following a catastrophe (fire, earthquake, etc.)  Hospitals must function following an incident  Health philosophy: Ventilation systems must provide comfortable healing environment Does not facilitate the spread of contagious diseases Does not adversely affect immune suppressed patients  Earthquake philosophy: Hospitals must be reasonably capable of providing services to the public Limited damage Critical equipment and systems remain operational Requires hospitals to be built 1 ½ times stronger than most other buildings  Fire philosophy: Patients may be too ill to evacuate “Defend in Place” by moving patients to adjacent “compartments” 11

Session 1 – OSHPD Presentation Higher Standards for Performance of Hospital Buildings in California  Sustained Operations philosophy: Adequate sanitation Adequate lighting Emergency power systems Medical Gas Systems  Achieving this high performance in hospital construction requires: Comprehensive building codes that are more complex Thorough plan review requires more time than for other types of buildings FDD has California licensed Architects, Structural Engineers, Mechanical Engineers, and Electrical Engineers and Fire Marshals which review hospital construction drawings Continuous construction inspection and quality assurance which is more demanding on contractors and inspectors 12

Session 1 – OSHPD Presentation Higher standards and codes alone are not sufficient 13

Session 1 – OSHPD Presentation FDD Plan Review Staff:  Supervisor, Health Facilities Review aka Regional Supervisor  Senior Architect  Fire Life Safety Officer  Senior Mechanical Engineer  Senior Electrical Engineer  Senior Structural Engineer Other Plan Review Staff:  CGS  Contract Reviewers 14

Session 1 – OSHPD Presentation FDD has many plan review process options: Preliminary Review – a review conducted at an earlier stage of plan development to ensure the design is heading in a code-compliant direction. Expedite Review – reduced turnaround goals for projects that fall within targeted review hour estimates. Over-the-counter Reviews – same day review with the client. Incremental Review – allows “fast-track” construction of large, complex building projects whereby work begins on some increments of work while other work is still in the plan review process. Phased Plan Review – allows review to begin at the “conceptual” phase of design and continue through all phases Collaborative Review – provides for one-on-one collaborative meetings at each transfer of documents. Deferred Approval Review - allows work that is typically done by a subcontractor or fabricator to be deferred until the subcontractor or fabricator has been selected. Field Review – reviews conducted at the facility or other off-site location by FDD’s field compliance staff. Rapid Review – a reduced turnaround goals for projects costing less than $175, excluding fixed equipment cost. 15

Session 1 – OSHPD Presentation  Most plan review is performed by FDD staff. For larger projects, structural plan review may be performed by contract plan review consultants  Plan review may include Over-the-Counter reviews with design professionals  Plan review may include Electronic Document Processing (Mandatory for Rapid Review projects) 16

Session 1 – OSHPD Presentation All project types - within 5 days First Reviews: (Does not apply to “Managed” projects) “S” projects - within 21 days for Rapid Review “S” projects - within 60 days for Standard Review “H” projects - within 80 days Back Check Reviews: (Does not apply to “Managed” projects) “S” projects - within 21 days for Rapid Review “S” projects - within 60 days for Standard Review “H” projects - within 80 days Post Approval Documents: (Does not apply to “Managed” projects) All project types - within 21 days for Rapid Review “S” and “H” projects - within 30 days The plan review workflow: “S” projects – Standard Remodel/Renovation projects with no primary structural work “H” projects – Projects with primary structural work 17

Session 1 – OSHPD Presentation % 59% 58.5% 59.3% 57.7% 51.6% 51.3% 54.1% 50.5% 53.7%57.8% More time with Design Team More time with FDD < 2 Back Checks ≥2 Back Checks

Session 1 – OSHPD Presentation 19 The expert Tip from the expert: Tip: Provide complete, quality plans in order to eliminate or reduce back checks and thus decrease overall time to plan approval

Session 1 – OSHPD Presentation Through penetration shall have an approved firestop system in accordance with CBC § Paul’s policy regarding plan review comments*: 1.If the comment is not in writing it doesn’t exist 2.If it is a code violation and a code section is not cited it is a recommendation and not a requirement * Based on HFSSA § (b) 20

Session 1 – OSHPD Presentation OPMs - OSHPD Preapproval of Manufacturer’s Certification OSPs - OSHPD Special Seismic Certification Preapproval OPDs - OSHPD Preapproved Details 21

Session 1 – OSHPD Presentation Tips from the expert: Tip: The designer may contact the Regional Supervisor prior to submittal of an application to FDD to assist them in determining the process which best fits their project needs Tip: Use OSPs, OPMs, and OPDs to reduce design and plan review time Tip: Use the reminder lists and FAQs (a question that has been asked at least once) on OSHPD/FDD’s website The same expert 22

Session 1 – OSHPD Presentation More Tips from the expert: Use the C.A.N.s Tip: Use the OSHPD Jurisdiction C.A.N to determine the scope of work under OSHPD’s jurisdiction Tip: Use the Remodel C.A.N to determine the scope of remodel/renovation projects Tip: Use the Accessibility C.A.N. 2-11B to determine the scope of accessibility for a project 23

Session 1 – OSHPD Presentation FDD Field Staff: Regional Compliance Officer Compliance Officer Fire Life Safety Officer District Structural Engineer Other Field Staff: Inspector(s) of Record Design Professional(s) Contractor/Builder Owner’s Representative 24

Session 1 – OSHPD Presentation Hospital Inspector of Record : Hired by the Hospital Owner Works under the direction of the Design Professionals(s) Monitored by FDD Field Staff 25 The same expert Tip from the expert: Tip: Selecting the right IOR(s) is critical to the success of every project Appropriate level of certification for the work Experience with work of similar scope, cost, and complexity Geographic location of current work sites Scope of current projects Current phase/construction completion of each workload project Number of current projects

Session 1 – OSHPD Presentation The Hospital Design Team (Architects, Engineers, etc.) Identify existing conditions Design a code compliant project OSHPD Reviewers Identify every code deficiency and see they are corrected Contractors Build according to the approved drawings IORs and OSHPD Field Staff Inspect for conformance with the approved drawings What is suppose to happen: 26

Session 1 – OSHPD Presentation The Hospital Design Team Designs a code compliant project based on the information they have and constraints of time and budget OSHPD Reviewers Identifies major code deficiencies, major coordination issues Contractors Builds according to the approved drawings, accounting for variations in the existing conditions and uncertainty in the code and drawings, corrects “unbuildable” conditions What does happen: 27

Session 1 – OSHPD Presentation IORs Inspects for conformance with the approved drawings and the code – identifying major and minor code deficiencies Attempts to be flexible when code is “unclear” or where the design is “unbuildable” Problems are encountered Unforeseen Conditions Work that does not match the approved drawings Code deficiencies that were not caught in plan review Code interpretation issues What does happen continued: 28

Session 1 – OSHPD Presentation What to do Contact OSHPD Field Staff What next Field staff confirm whether change materially alters the work or not Only changes that materially alter the work need be submitted for plan review as an Amended Construction Document What does happen continued: Tip from the expert: Tip: Refer to C.A.N Amended Construction Documents The same expert 29

Session 1 – OSHPD Presentation Tip: Timely submittals of changes, redesign, alternate means, and material substitutions Tip: Avoid redesign and material substitutions after construction start Tip: Install materials in accordance with the contract documents, manufactures installation instructions and/or approved listings Tip: Make sure your installation instructions and material submittals are available to the inspector(s) Tip: Install per approved construction documents; review changes and any items subject to interpretation prior to installation More Tips from the expert for a successful construction project: 30

Session 1 – OSHPD Presentation Tip: Don’t perform work that is not shown on the approved contract documents which alters the intent, scope, or function of the project (materially alters) until approved by OSHPD Tip: Whether the bracing system is an engineered (project specific) or pre-approved system (with verification of suitability for the specific structure) the specific approved details must be used Tip: Have a copy of the OSHPD approved plans and specifications (contract documents) onsite. Tip: Have a pre-construction meeting with the GC, major subs, design professionals, IORs and OSHPD field staff Tip: Don’t substitute for approved materials or methods without project engineer and OSHPD approval More Tips from the expert for a successful construction project: 31