Implementing HF & NTS Training and Assessment in RPT Operations: A Regulator’s Perspective CASA Ian Banks Section Head, Human Factors.

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

Human Factors in Flight Operations A CAA Perspective
Competency-Based Training Solutions in a non-standardized world APATS September 2009 Capt. Kris Van den Bergh Vice-President Pilot Provisioning.
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Module N° 7 – SSP training programme
Module N° 4 – ICAO SSP framework
Module N° 3 – ICAO SARPs related to safety management
1 Welcome Safety Regulatory Function Handbook April 2006.
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
PRD Group Maturity Matrix 31/07/08. Maturity Matrix Guidance Notes Aims of the Matrix The Maturity Matrix is a tool aimed to support groups during their.
Boeing’s Perspective on FCF Risk Mitigation
Safer Clinical Systems About Safer Clinical Systems June 2011.
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
Develop an Information Strategy Plan
Air Transport Association of Canada A presentation by John McKenna ATAC President and CEO.
[Organisation’s Title] Environmental Management System
Nadia Konzali Project Coordinator, COSCAP-GS
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
5 december 2011 Living Probabilistic Asset Management Dr.ir. J.A. van den Bogaard.
Dr. Julian Lo Consulting Director ITIL v3 Expert
Implementing SMS in Civil Aviation: the Canadian Perspective.
Reflective Practice Leadership Development Tool. Context recognised that a key differentiator between places where people wanted to work and places where.
The Australian/New Zealand Standard on Risk Management
EEN [Canada] Forum Shelley Borys Director, Evaluation September 30, 2010 Developing Evaluation Capacity.
Quality evaluation and improvement for Internal Audit
What SMS means for an Operator’s relationship with the CAA
CAR/SAM Regional Guidance Material on Air Traffic Services Quality Assurance Programmes NAM/CAR/SAM Quality Assurance Workshop Gustavo De León Regional.
Session No. 4 Implementing Service Providers SMS Implementing the State’s Safety Programme SMS Senior Management Workshop Rome, 21 May 2007.
FAA ICAO ANNEX 6 PROPOSAL & OVERSIGHT ISSUES IN DISPATCH
Risk Assessment – An Essential Standard
1 CHCOHS312A Follow safety procedures for direct care work.
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
ICAO EUR HLSC Preparatory Seminar
Who’s the Boss? Faculty Advisor or Principal Investigator Supervision versus Student Investigator or Study Coordinator Responsibilities Gwenn Snow, MS,
Introduction to ISO New and modified requirements.
Ship Recycling Facility Management System IMO Guideline A.962
Improving Corporate Governance in Malaysian Capital Markets – The Role of the Audit Committee Role of the Audit Committee in Assessing Audit Quality.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Integrating Safety Management Systems – Opportunities for Improvement
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
Foundation Degrees Foundation Degree Forward Lichfield Centre The Friary Lichfield Staffs WS13 6QG — Tel: Fax: —
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Programme Objectives Analyze the main components of a competency-based qualification system (e.g., Singapore Workforce Skills) Analyze the process and.
SMS, Human Factors and FRMS – A Perspective Capt. Dan Maurino RAeS HF Group Conference on Building Fatigue into Safety Systems Crawley, 30 October 2012.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Professional Certificate in Electoral Processes Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
International Security Management Standards. BS ISO/IEC 17799:2005 BS ISO/IEC 27001:2005 First edition – ISO/IEC 17799:2000 Second edition ISO/IEC 17799:2005.
Kathy Corbiere Service Delivery and Performance Commission
ISO Registration Common Areas of Nonconformances.
Evolution Cabin Crew Training & Assessment for the Future.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
MINE SAFETY MANAGEMENT PLAN. DIRECTORATE GENERAL OF MINES SAFETY DGMS n It is recommended that mines be required to put in place Mine Safety Management.
Continual Service Improvement Methods & Techniques.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Gdansk International Air & Space Law Conference November 2013 Authority and Organisation Requirements “effective management systems for authorities and.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Bringing an SMS Manual to Life Simon Roberts SMS Programme Lead UK CAA.
Continuing Competence is coming
Implementing SMS in Civil Aviation: the Canadian Perspective
WP 3 How to assess implementation of ALARA
Recommended practice Training and Competency: Flight Crew
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
Regulatory Oversight of HOF in Finland
Mr Mirco Barbero European Commission, IAS.C1
NAM/CAR/SAM Quality Assurance Workshop Gustavo De León
Aerodrome Certification Workshop
CEng progression through the IOM3
Presentation transcript:

Implementing HF & NTS Training and Assessment in RPT Operations: A Regulator’s Perspective CASA Ian Banks Section Head, Human Factors

Background ICAO SARPs 1 st Jan 2009  Requirement for SMS; and  Requirement for Human Factors training and assessment.  ‘knowledge and skills related to human performance’ relevant to duties.  Annex 6, Part 1  Para (maintenance personnel) – covered in CASA Part 145  Para (flight crew),  Para 10.3 (flight operations officer/flight dispatcher), and  Para 12.4 (cabin crew)  Guidance provided in the ICAO Human Factors Training Manual (Doc. 9683).

Two Civil Aviation Orders (CAO) require Human Factors training. CAO 82.3, 2.1(c) and 82.5, 2.1(c) require that Low and High Capacity Regular Public Transport (RPT) organisations have; “A program, approved by CASA, to train and assess personnel in human factors and non-technical skills with the aim of minimising human error.” Background

Explanatory statement in paragraph 2.7 of CAO82.3/5:  human factors or HF means the minimisation of human error and its consequences by optimising the relationships within systems between people, activities and equipment  non-technical skills means specific human competencies, including critical decision making, team communication, situational awareness and workload management, which may minimise human error in aviation. Background

Timeline  First Stage  1 Jun 11CASA Approved Program – Document level only  Second Stage  Jul 11 - Apr 12Post Implementation Review Mentoring - Identify risks and problems (to Dec 11)  Third Stage  Apr 12- Jun 12 Post Implementation Capability Assessment On-site assessment of the implementation and effective operation of the HF/NTS program-This was carried out by a contractor in conjunction with CASA inspectors.

Types of Course Development & Management  Internally developed program  Externally Sourced – Off-the-Shelf with modifications  Updated and managed internally  3 rd Party Provider – ongoing relationship  Quality assurance remains internal

Main Challenges from phase one 1.SMS Interaction 2.Communication requirements across different areas 3.Understanding and applying Outcome Based Legislation 4.Level of knowledge of industry – Extent and standard of education material provided 5.CASA approval of updates to Training Courses – Level of detail approved 6.3 rd party providers – how oversight and how to communicate effectively 7.Tailoring HF & NTS Training and Assessment program for different employment groups – Pilot, Cabin Crew, & Dispatcher

SMS Challenges  Initial submissions tended not to document connections between the SMS and the HF & NTS training and assessment program  HF/NTS required SMS aspects to be functioning in a mature and healthy manner – safety assurance, communication, etc  Safety analysis required with a HF/NTS training perspective  Organic process – HF/NTS program should move toward reflecting organisation’s operational context  Approval of initial course content required processes for reflecting future HF & NTS threats and maintaining operational relevance.

Incorporation into SMS SMS Functions

Phase Three Assessment For Phase 3, the focus of the assessment was whether the HF/NTS program was:  “operating” (how each element was demonstrated to be functioning at the time of the assessment); and  “effective” (whether each element was demonstrated to be functioning effectively).

Grading for the Assessment  HF/NTS Program ‘Non Compliant’  HF/NTS Program ‘Somewhat’ (SW) Compliant - Recommendations for Improvement proposed; and  HF/NTS Program ‘Mostly’ or ‘Fully’ Compliant – Recommendations for Improvement leading to ‘Best Practice’ suggested if applicable.

Key Strengths  The majority of RPT operators assessed demonstrated well established, and for the most part, mature flight crew HF/NTS programs. This was not surprising given the long history of CRM under CAR 217 training organisations.

Key Improvements Needed Need to extend skill based assessment beyond flight crew  Flight crew skills based assessment of HF is generally well established in many organisations, but very few operators have extended this beyond flight crew centric programs into the skill based assessment of cabin crew and ground based Flight Operations Safety Sensitive Personnel.  The ‘skills’ component of the NTS program in many cases was not systematically being trained and assessed to drive error management initiatives across the business.

Findings of Assessments for ‘Somewhat’ Compliant HCRPT Issues included:  Lack of sophisticated, specific or measurable HF/NTS program objectives;  Poor linkage between the HF/NTS training program and SMS performance outcomes;  Little evidence of systematic use of SMS data (investigations) to facilitate HF/NTS training and assessment needs;  Failure to fully implement effective skills-based training and assessment, particularly in cabin crew and flight operations safety sensitive roles; and  Immature or non effective mechanisms to assess the behavioural and organisational impacts and effectiveness of the HF/NTS program.

General characteristics of HF/NTS programs at this assessment level were:  Management commitment to the program;  Highly knowledgeable and centralised program coordinators;  HF/NTS program well integrated within the company SMS;  Clear accountabilities for the HF/NTS program with good resources, well qualified and experienced key personnel and facilitators committed to ensuring the effective implementation of the program;  Well prepared for the Capability Assessment, able to produce documentary evidence as proof of ‘implementation’ and ‘effectiveness’;  Mature ‘LOSA-like’ programs in place for Flight and Cabin Crew, with behavioural observations implemented or being developed for all safety critical staff; and  Good progress on implementing all HF/NTS requirements including ground based training and assessment. Findings of Assessments for ‘Mostly’ or ‘Fully’ Compliant HCRPT

Findings of Assessments for ‘Somewhat’ Compliant LCRPT General characteristics of these HF/NTS programs were:  Mature HF/NTS programs in place for flight crew but not fully implemented in other flight operations safety critical roles;  Linkage of HF/NTS program to SMS informal and not well documented;  HF classification system for event based investigations often immature and surface level;  No LOSA style program in place or no specific plans to measure error management capability;  No clear evaluation strategy of program effectiveness in place;  Not all Flight Operations Safety Sensitive Personnel have undergone training;  HF training is predominantly awareness based; and  Management commitment to program observed but not as mature as should be.

General characteristics of the HF/NTS programs included:  Good management commitment to program;  HF/NTS awareness training program sound and contemporary in nature;  Skill based assessment program fully in place;  Adequate links observed between HF/NTS program and SMS; and  Very well prepared for HF/NTS assessment with a mature approach representative of an established program being in place for some time. Findings of Assessments for ‘Mostly’ or ‘Fully’ Compliant LCRPT

The use of third party training providers has resulted in the following observed issues in many of those organisations:  A significant shift of ownership for the program to the external provider. For example, some Operators have a manual that refers to document control and positions (fleet administration manager or safety manager) that do not exist.  Misperception that courses provided by 3 rd parties could be “CASA approved”;  The HF/NTS manuals not tailored to the operator. For example, manuals referring to cabin crew when an organisation does not employ any cabin crew;  Very little tailoring of the program to the operating environment and risk profile of the organisation;  Confusion over accountabilities and responsibilities. Who is responsible for the HF/NTS program –the training provider or the Operator? 3 rd Party Providers

Training Operations Check & Training Safety Manager Management Group 3 rd Party Provider HF Best Practice CASAOversightCASAOversight Other AOC holders Ongoing Management Quality Control? Communication? Processes Documented

Poor Integration of HF/NTS Data The most common limitation of the HF/NTS programs assessed was the lack of integration of different sources of human factors data  Limited number of Operators had developed a sound framework to capture predictive (LOSA), reactive (event based investigations) and check and training line assessment data within a common framework to analyse emerging HF/NTS issues.

Check & Training Evaluation SMS Processes Course Feedback -Validity of content -Quality and depth of content -Facilitator performance -Relevance Communication Pathways Assessing HF & NTS - Assessment Methodology - Simulator - Line Checks - LOSA -Assessment templates -Reliable Assessment -Across types/operations - Applying Error Management Goals - Interpreting/Coding data - Considering integrated approach - Tracking progress - Feedback loop

Integration of HF/NTS into SMS  A common view was that an HF/NTS program was simply a training initiative and that this was adequate to meet the regulatory requirements.  There was a distinct lack of awareness of the benefits of using HF/NTS initiatives as an indicator of SMS performance.

Challenges in a Nutshell 1.Integration of HF/NTS program into SMS 2.Skill development & assessment – Role specific 3.Resource constraints of smaller RPT AOC holders 4.Understanding of the scaleability of requirements 5.Need for sufficient resources in the Regulator

Questions?