© 2007 Pearson Education Simulation Supplement B.

Slides:



Advertisements
Similar presentations
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Advertisements

Copyright © 2009 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Introduction to Graphing The Rectangular Coordinate System Scatterplots.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Understanding Value Stream Decision Making
Research Methods in Politics Chapter 14 1 Research Methods in Politics 14 Understanding Inferential Statistics.
EuroCondens SGB E.
Part 3 Probabilistic Decision Models
STATISTICS INTERVAL ESTIMATION Professor Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering National Taiwan University.
Ph.D. Completion and Attrition CGS Board of Directors December 4, 2007.
Applications of Percents
BUS 220: ELEMENTARY STATISTICS
12.3 – Analyzing Data.
CALENDAR.
1 More Standard Costing & Variance Analysis Week 10.
Adding Adding by Partitioning Vertically.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Chapter 7 Sampling and Sampling Distributions
Case Study.
ACC 3200 Chapter 3: Process Costing Process Costing.
Auto-Moto Financial Services- The Old Process
1 Managing Flow Variability: Safety Inventory The Newsvendor ProblemArdavan Asef-Vaziri, Oct 2011 The Magnitude of Shortages (Out of Stock)
Sampling in Marketing Research
Simulation Chapter 14.
Reliability McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Break Time Remaining 10:00.
The basics for simulations
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
Introduction to Cost Behavior and Cost-Volume Relationships
Process Flow Analysis The Little’s Law The main source for preparing these slides is Managing Business Process Flow Anupindi, Chopra, Deshmoukh, Van.
Finish Test 15 minutes Wednesday February 8, 2012
Frequency Tables and Stem-and-Leaf Plots 1-3
Cost-Volume-Profit Relationships
MCQ Chapter 07.
PRODUCTION AND OPERATIONS MANAGEMENT
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Capacity and Constraint Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter Eleven Cost Behavior, Operating Leverage, and CVP Analysis.
Structure of a Waiting Line System
Discrete Event (time) Simulation Kenneth.
Three Key Process Measures: Flow Rate
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Re-Order Point Problems Set 1: General
Chapter 10 Estimating Means and Proportions
Sprayer Economics Gary Schnitkey University of Illinois.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
Example of a Decision Tree Problem: The Payoff Table
© 2007 Pearson Education Waiting Lines Supplement C.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Subtraction: Adding UP
Static Equilibrium; Elasticity and Fracture
Chapter 15: Quantitatve Methods in Health Care Management Yasar A. Ozcan 1 Chapter 15. Simulation.
Fundamentals of Cost Analysis for Decision Making
Clock will move after 1 minute
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Select a time to count down from the clock above
Introduction into Simulation Basic Simulation Modeling.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Simulation.
B – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Simulation B For Operations Management, 9e by Krajewski/Ritzman/Malhotra ©
© 2007 Pearson Education Simulation Supplement B.
B – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Simulation Supplement B.
Supplement E Simulation Copyright ©2013 Pearson Education, Inc. publishing as Prentice HallE- 01.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Supplement.
Simulation. Introduction What is Simulation? –Try to duplicate features, appearance, and characteristics of real system. Idea behind Simulation –Imitate.
Simulation Supplement B.
Simulation Supplement B
Presentation transcript:

© 2007 Pearson Education Simulation Supplement B

© 2007 Pearson Education Simulation Simulation: The act of reproducing the behavior of a system using a model that describes the processes of the system. Time Compression: The feature of simulations that allows them to obtain operating characteristic estimates in much less time than is required to gather the same operating data from a real system. Monte Carlo simulation: A simulation process that uses random numbers to generate simulation events.

© 2007 Pearson Education Specialty Steel Products Company produces items such as machine tools, gears, automobile parts, and other specialty items in small quantities to customer order. Demand is measured in machine hours. –Orders are translated into required machine-hours. Management is concerned about capacity in the lathe department. Assemble the data necessary to analyze the addition of one more lathe machine and operator. Specialty Steel Products Co. Example B.1

© 2007 Pearson Education Weekly ProductionRelative Requirements (hr)Frequency Total1.00 Total1.00 Specialty Steel Products Co. Example B.1 Historical records indicate that lathe department demand varies from week to week as follows:

© 2007 Pearson Education Weekly ProductionRelative Requirements (hr)Frequency Total1.00 Specialty Steel Products Co. Example B.1 Average weekly production is determined by multiplying each production requirement by its frequency of occurrence. Average weekly production requirements = 200(0.05) + 250(0.06) + 300(0.17) + … + 600(0.02) = 400 hours

© 2007 Pearson Education Specialty Steel Products Co. Example B.1 Weekly ProductionRelative Requirements (hr)Frequency Total1.00 Average weekly production requirements = 400 hours RegularRelative Capacity (hr)Frequency 320 (8 machines) (9 machines) (10 machines)0.30 The average number of operating machine-hours in a week is: 320(0.30) + 360(0.40) + 400(0.30) = 360 hours

© 2007 Pearson Education Specialty Steel Products Co. Weekly ProductionRelative Requirements (hr)Frequency Total1.00 Total1.00 Average weekly production requirements = 400 hours RegularRelative Capacity (hr)Frequency 320 (8 machines) (9 machines) (10 machines) (10 machines)0.30 The average number of operating machine-hours in a week = 360 Hrs. RegularRelative Capacity (hr)Frequency 360 (9 machines) (10 machines) (10 machines) (11 machines) (11 machines)0.30 Experience shows that with 11 machines, the distribution would be: Example B.1

© 2007 Pearson Education Specialty Steel Products Co. Assigning Random Numbers Random numbers must now be assigned to represent the probability of each demand event. Random Number: A number that has the same probability of being selected as any other number. Since the probabilities for all demand events add up to 100 percent, we use random numbers between (and including) 00 and 99. Within this range, a random number in the range of 0 to 4 has a 5% chance of selection. We can use this to represent our first weekly demand of 200 which has a 5% probability.

© 2007 Pearson Education Event Weekly Demand (hr)Probability Random numbers in the range of 0-4 have a 5% chance of occurrence. Random numbers in the range of 5-10 have a 6% chance of occurrence. Random numbers in the range of have a 17% chance of occurrence. Random numbers in the range of have a 5% chance of occurrence. Specialty Steel Products Co. Assigning Random Numbers

© 2007 Pearson Education Event Existing Weekly RandomWeeklyRandom Demand (hr)ProbabilityNumbersCapacity (hr)ProbabilityNumbers – – – – – – – – – – – –99 If we randomly choose numbers in the range of enough times, 5 percent of the time they will fall in the range of 00-04, 6% of the time they will fall in the range of 05-10, and so forth. Specialty Steel Products Co. Assigning Random Numbers

© 2007 Pearson Education Specialty Steel Products Co. Model Formulation Formulating a simulation model entails specifying the relationship among the variables. Simulation models consist of decision variables, uncontrollable variables and dependent variables. Decision variables: Variables that are controlled by the decision maker and will change from one run to the next as different events are simulated. Uncontrollable variables are random events that the decision maker cannot control.

© 2007 Pearson Education Specialty Steel Products Co. Example B.2 1.Using the Appendix 2 random number table, draw a random number from the first two rows of the table. Start with the first number in the first row, then go to the second number in the first row. 2.Find the random-number interval for production requirements associated with the random number. 3.Record the production hours (PROD) required for the current week. 4.Draw another random number from row three or four of the table. 5.Find the random-number interval for capacity (CAP) associated with the random number. 6.Record the capacity hours available for the current week. Simulating a particular capacity level

© 2007 Pearson Education 7.If CAP > PROD, then IDLE HR = CAP – PROD 8.If CAP < PROD, then SHORT = PROD – CAP If SHORT < 100 then OVERTIME HR = SHORT and SUBCONTRACT HR = 0 If SHORT > 100 then OVERTIME HR = 100 and SUBCONTRACT HR = SHORT – Repeat steps until you have simulated 20 weeks. Specialty Steel Products Co. Example B.2 Simulating a particular capacity level

© 2007 Pearson Education Specialty Steel Products Co. 20-week simulation 10 Machines Existing DemandWeeklyCapacityWeeklySub- RandomProductionRandomCapacityIdleOvertimecontract WeekNumber(hr)Number(hr)HoursHoursHours Total Weekly average

© 2007 Pearson Education Comparison of 1000-week Simulations 10 Machines11 Machines Idle hours Overtime hours Subcontract hours Cost$1,851.50$1, Specialty Steel Products Co week simulation A steady state occurs when the simulation is repeated over enough time that the average results for performance measures remain constant.

© 2007 Pearson Education Monte Carlo Simulation Application B.1 Famous Chamois Car Wash Car Arrival Distribution (time between arrivals) Famous Chamois is an automated car wash that advertises that your car can be finished in just 15 minutes. The time until the next car arrival is described by the following distribution. MinutesProbabilityMinutesProbability

© 2007 Pearson Education Famous Chamois Car Wash: Random Number Assignment Assign a range of random numbers to each event so that the demand pattern can be simulated. Minutes Random Numbers Minutes Random Numbers 100– –  – – –  –  –58 Monte Carlo Simulation Application B.1

© 2007 Pearson Education Monte Carlo Simulation Famous Chamois Car Wash: Simulation Simulate the operation for 3 hours, using the following random numbers, assuming that the service time is constant at 6, (:06) minutes per car. Random Number Time to Arrival Arrival Time Number in Drive Service Begins Departure Time Minutes in System 5070:070 0:136 63?

© 2007 Pearson Education

Computer Simulation  The simulation for Specialty Steel Products demonstrated the basics of simulation.  However it only involved one step in the process, with two uncontrollable variables (weekly production requirements and three actual machine-hours available) and 20 time periods.  Simple simulation models with one or two uncontrollable variables can be developed using Excel, using its random number generator.  More sophisticated simulations can become time consuming and require a computer.

© 2007 Pearson Education

BestCar Auto Dealer Simulation Model  Below is a probability distribution for the number of cars sold weekly at BestCar (See Example B.3).  The selling price per car is $20,000. Design a simulation model that determines the probability distribution and mean of the weekly sales.

© 2007 Pearson Education

Simulation with SimQuick  Simquick is an easy-to-use package that is an Excel spreadsheet with some macros.  Let’s simulate the passenger security process at one terminal of a medium-sized airport between the hours of 8 A.M. and 10 A.M.  Passengers arrive in a single line and go through one of two inspection stations consisting of a metal detector and a carry- on baggage scanner.  After this, 10% are randomly selected for an additional inspection handled by one of two stations.  Management wants to examine the effects of increasing the number of random inspections to 15% and 20%.  They also want to consider a 3rd station for the 2nd inspection

© 2007 Pearson Education Flowchart of Passenger Security Process Entrance Arrivals Buffer Sec. Line 1 Buffer Buffer Sec. Line 2 Buffer Buffer Done Work St. Add. Insp. 1 Work St. Add. Insp. 1 Work St. Add. Insp. 2 Work St. Add. Insp. 2 Work St. Insp. 1 Work St. Insp. 2 Dec. Pt. DP Information about each block is entered into Simquick. Other information needed in statistical distribution form: (1) when people arrive, (2) inspection times, & (3) % of passengers randomly selected. Arrivals and inspection times are acquired through observation; % randomly selected is a policy decision

© 2007 Pearson Education Simulation Results of Passenger Security Process Final inventoryDone 0.53Mean cycle time 0.10Mean inventoryLine Mean cycle time 5.97Mean inventoryLine 1Buffer(s) Objects entering processDoorEntrance(s) MeansNames Types OverallStatisticsElement