Use of Country Systems Consultations on the Draft Methodology for Use of Country Procurement Systems.

Slides:



Advertisements
Similar presentations
1 John Rwangombwa Permanent Secretary and Secretary to Treasury Ministry of Finance and Economic Planning Republic of Rwanda 1 Challenges and opportunities.
Advertisements

KENYA HEALTH SECTOR PARTNERSHIP Third IHP+ Country Health Sector Teams Meeting Brussels, December 2010.
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
1 The PEFA Program – and the PFM Performance Measurement Framework Washington DC, May 1, 2008 Bill Dorotinsky IMF.
Effective Contract Management Planning
RESPONSE TO THE THEMATIC EVALUATION: INCREASING WOMEN’S LEADERSHIP AND PARTICIPATION IN PEACE AND SECURITY AND IN HUMANITARIAN RESPONSE Saraswathi Menon,
ARMENIA: Quality Assurance (QA) and National Qualifications Framework (NQF) Tbilisi Regional Seminar on Quality Management in the Context of National.
CONSULTATION AND THE SAFEGUARD POLICIES ECA Safeguard Training for PIUs, May 17, 2011.
Workshop on the Strengthened Approach to Supporting PFM Reform PFM Performance Measurement Framework And Procurement Pamela Bigart World Bank.
Development Policy Lending: What’s new? OPCS, Country Economics.
Introduction to the Country Assistance Strategy (CAS)
Sharing Good Practice in Quality
Code of Conduct - the Merlin Standard
Management 5-Point Action Plan Summary Timeline Completion by June 2010 Problem Identified I. Improve efficiency, effectiveness and controls for IL 1.Match.
Progress Toward Impact Overall Performance Study of the GEF Aaron Zazueta GEF Evaluation Office Hanoi, March 10, 2010.
World Bank’s new methodology In Country procurement assessment World Bank’s Methodology for Procurement laws: back to country systems?
Purpose of the Standards
THE WORLD BANK Procurement Briefing the Netherlands November 3, 2003 Shaun Moss, Lead Procurement Specialist, Europe and Central Asia Region.
PROCUREMENT IN WORLD BANK INVESTMENT OPERATIONS: STATUS OF THE REFORM March, 2014 Operations Policy and Country Services.
A PROCUREMENT ASSESSMENT MODEL Joel Turkewitz World Bank April 2003.
Working with EBRD – Consultant Opportunities for Dutch Consultants Selection & Contracting of Consultants under EBRD’s Procurement Policies and Rules (PP&R)
Internal Auditing and Outsourcing
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Piloting the Use of Country Systems in World Bank-supported operations Working for a world free of poverty.
Effective Engagement of Accountable Local Governments in Development Assistance Projects Prepared in consultation with the Government Accountability Office.
OPCPR- 03/26/20081 Procurement Under OP/BP 8.0 This presentation will cover…  Organizational and Institutional Support  Simplified Procurement Arrangements.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU. Quality Assurance José Viegas Ribeiro IGF, Portugal SIGMA.
1 Fostering Aid Effectiveness: Program-Based Approaches and What it means for Procurement? Presented by Jocelyn Comtois May International Conference.
SECTOR POLICY SUPPORT PROGRAMMES A new methodology for delivery of EC development assistance. 1.
1 Inter-American Development Bank Environment and Safeguards Policy - A Strategic Overview.
European Corporate Governance: What are the current issues? European Union Corporate Governance Standards - Working Group Meeting December 17, 2013 Brussels.
February 21, JAS Consultation between the Government of Tanzania and Development Partners February 21, 2006 Courtyard Hotel, Dar es Salaam.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
PACIFIC AID EFFECTIVENESS PRINCIPLES. Purpose of Presentation Provide an overview of Pacific Principles on Aid Effectiveness Provide an overview of Pacific.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Making the Grade: a survey of IFI social policies and the policies of the European Investment Bank (EIB) Tom Griffiths Forest Peoples Programme Rights.
Budget support training Module 5 Transparency and oversight of the budget (Third eligibility criterion) Version October 2013.
PROCUREMENT IN PRSCs – Case of Uganda March 24-28, 2008 Playing a Key Role in achieving the Development Results Playing a Key Role in achieving the Development.
Recent Developments of the PEFA Program Video-conference of the PEMPAL BCOP PEFA Working Group February 20, 2009 Frans Ronsholt Head of PEFA Secretariat.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
1 Use of Country Procurement System (UCS) HIGH LEVEL PROCUREMENT FORUM V. S. (Krish) Krishnakumar Regional Procurement Manager Africa Region - The World.
April Why a New Instrument? Change in client demand: Clients want Bank support for government’s own programs and increased focus on results. This.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Bangladesh Joint Country Assistance Evaluation: Assessing Total ODA at the Country Level Presentation to OECD DAC November 2006 Bruce Murray Director General.
AFR Observatory on monitoring and evaluating procurement reform programs Working for a world free of poverty.
December Why Program-for-Results (PforR)? Development Effectiveness and Client Demand – PforR responds to client demand that could not be fully.
Procurement in SWAps Seminar on Procurement of Goods, Works and Consultancy Contracts financed from World Bank Loans and IDA Credits, February 27 - March.
INTER-AMERICAN DEVELOPMENT BANK Business Opportunities IDB Financing in Latin America and The Caribbean May 2016.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
2016 NSF Large Facilities Workshop New Initiatives Business Roundtable II-III May 25-26, 2016 Jeff Lupis, Division Director, Division of Acquisition and.
Baseline Indicators and Performance Measurement Framework for Procurement Regional Workshop on Procurement Capacity Development Lima, Peru April.
Institution / Sector Fiduciary Assessments (IFAs/SFAs) An example – the Croatia Education Sector Fiduciary Assessment (ESFA) Maria Vannari & Ranjan Ganguli,
Regional Accreditation Workshop For Asia and Eastern Europe Manila, Philippines th March, 2012.
The Private Sector and the Caribbean: Working Together for Development June 23, 2010 Procurement Policies and Procedures for Goods, Works and Consulting.
1 Vereniging van Compliance Officers The Compliance Function in Banks Amsterdam, 10 June 2004 Marc Pickeur CBFA CBFA.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
IL Reform Risk-Based Approach & GAC Agenda Dec
Well Trained International
EIA approval process, Management plan and Monitoring
Stakeholder consultations
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Ivor Beazley, World Bank
PROCUREMENT FIDUCIARY ARRANGEMENTS IN SECTOR-WIDE APPROACHES (SWAps)
Workshop on the Strengthened Approach to Supporting PFM Reform
Use of Country Systems: Consultations on the Draft Methodology for Use of Country Procurement Systems Elective Session 2nd Africa Region Education Capacity.
2016 Procurement Framework Contract Management
SWAPs: Based on Lessons Mainly from Morocco and Zambia
April 2011.
Taking the STANDARDS Seriously
PEFA Assessments - Analytics to Action
Presentation transcript:

Use of Country Systems Consultations on the Draft Methodology for Use of Country Procurement Systems

Presentation Outline Part I - Why Use Country Systems Part I - Why Use Country Systems Part II - Procurement Methodology Part II - Procurement Methodology Part III - Consultation Process Part III - Consultation Process Part IV - Handling of Past Issues Part IV - Handling of Past Issues

Why Is the Bank Interested in Use of Country Systems Part I - Background

Why Are We Interested in Use of Country Systems? Scale up development impact Scale up development impact Increase country ownership Increase country ownership Facilitate harmonization Facilitate harmonization Simplify and reduce costs Simplify and reduce costs Links to: Paris Declaration Paris Declaration MIC Agenda MIC Agenda GAC Agenda (principle #6) GAC Agenda (principle #6)

Where Do We Stand? Environment and social safeguards: pilot projects approved 03/05, 12 ongoing pilots Environment and social safeguards: pilot projects approved 03/05, 12 ongoing pilots Financial management: country systems are the default choice under existing policy, but many Project Implementation Units (PIUs) still created outside regular financial system. Country systems used 60% of time in eligible countries Financial management: country systems are the default choice under existing policy, but many Project Implementation Units (PIUs) still created outside regular financial system. Country systems used 60% of time in eligible countries Procurement: use of National Competitive Bidding under country systems common. Earlier proposal to expand use of country procurement systems withdrawn to update and reflect comments from consultation process. Procurement: use of National Competitive Bidding under country systems common. Earlier proposal to expand use of country procurement systems withdrawn to update and reflect comments from consultation process.

Lessons from Safeguards Pilot and Financial Management Limited take up Limited take up Costs of upfront preparation are prohibitive Costs of upfront preparation are prohibitive Need for clear management signals, especially related to GAC Need for clear management signals, especially related to GAC Project-by-project approach very limited in impact (12 projects in portfolio of 1600) Project-by-project approach very limited in impact (12 projects in portfolio of 1600)

New Proposal #1: Country Pilots To accelerate progress we propose to supplement project- by-project approach: New Country Pilots with at least 8 countries in the first year (candidates to be proposed by Regions;) New Country Pilots with at least 8 countries in the first year (candidates to be proposed by Regions;) Assessment in each case of procurement, safeguards, financial management that can meet the Bank standards Assessment in each case of procurement, safeguards, financial management that can meet the Bank standards Identification of policy reforms and capacity building measures to address any gaps Identification of policy reforms and capacity building measures to address any gaps After approval via OPCS, reports on proposed Pilots would be sent to Board for information plus progress report after one year After approval via OPCS, reports on proposed Pilots would be sent to Board for information plus progress report after one year

New Proposal #2: Procurement Project Pilots In addition to country pilots, propose pilots in procurement at the sector/project level for ICB and Selection of Consultants; Assessment based on policy framework and performance equivalent to Bank policies Assessment based on policy framework and performance equivalent to Bank policies Use of Country Procurement Assessment Reviews (CPARs) new OECD/DAC Assessment Methodology, and performance indicators Use of Country Procurement Assessment Reviews (CPARs) new OECD/DAC Assessment Methodology, and performance indicators Provision for re-imposition of Bank procedures if new system abused Provision for re-imposition of Bank procedures if new system abused Emphasis that this is not a reduction of Bank standards, but recognition that many countries have achieved equivalence

Part II - A Multi-Phased Process Key Elements of Draft “Detailed Methodology for Procurement Country Systems Piloting Program” Part II - A Multi-Phased Process Key Elements of Draft “Detailed Methodology for Procurement Country Systems Piloting Program”

Phase I - Country Selection Process for Pilots in Safeguards, Financial Management and Procurement Suggested Procurement Related Criteria Suggested Procurement Related Criteria –CPAR and other relevant diagnostics –PFM System Information (e.g. PEFA or CFAA, Integrated Fiduciary and/or PER) –Existing/planned OECD/DAC assessment –Expressed interest of country –Country Director and country team support

Phase II – Procurement Assessment, Analysis and Capacity Development at Country Level CPAR provides information on the system including action plan for any on-going reforms and indication of country commitment CPAR provides information on the system including action plan for any on-going reforms and indication of country commitment OECD/DAC benchmarking tool provides for scoring of 54 sub-indicators on 0-3 scale with a score of 3 representing best practice OECD/DAC benchmarking tool provides for scoring of 54 sub-indicators on 0-3 scale with a score of 3 representing best practice 30 of the 54 sub-indicators in the OECD/DAC tool have been identified as critical and require achieving the highest score of 3 for 22 of the sub-indicators or a score of 2 with an agreed action plan for 8 of the sub-indicators. 30 of the 54 sub-indicators in the OECD/DAC tool have been identified as critical and require achieving the highest score of 3 for 22 of the sub-indicators or a score of 2 with an agreed action plan for 8 of the sub-indicators. Remaining 24 sub-indicators require achieving a score of 2 Remaining 24 sub-indicators require achieving a score of 2

Phase II - Capacity Development If country assessments indicate failure to achieve stated standards, focus will be on addressing issues through increased capacity development, country will not be a pilot for procurement. If country assessments indicate failure to achieve stated standards, focus will be on addressing issues through increased capacity development, country will not be a pilot for procurement. If issues in system can be addressed in the short term, country will remain a candidate country while capacity develop undertaken. Country will move to next level once noted issues have be corrected. If issues in system can be addressed in the short term, country will remain a candidate country while capacity develop undertaken. Country will move to next level once noted issues have be corrected.

Phase II - Equivalence Assessment Ensures that “equivalence” to the principles and policies defined by the Bank is achieved and maintained Ensures that “equivalence” to the principles and policies defined by the Bank is achieved and maintained Each key policy of the Bank’s Guidelines addressed through the assessment process which verifies the country’s policies, procedures and practices Each key policy of the Bank’s Guidelines addressed through the assessment process which verifies the country’s policies, procedures and practices A special agreement with the country to address any outstanding issues will be made part of the Loan Agreement for the pilot projects. A special agreement with the country to address any outstanding issues will be made part of the Loan Agreement for the pilot projects.

Phase II - Selection of Consultants All consulting requirements above threshold 1 to follow Bank Guidelines All consulting requirements above threshold 1 to follow Bank Guidelines All consulting requirements below threshold to use country methods agreed with the Bank All consulting requirements below threshold to use country methods agreed with the Bank Country may request an equivalence assessment for increased reliance on use of country system for consultancy assignments above the stated thresholds. Country may request an equivalence assessment for increased reliance on use of country system for consultancy assignments above the stated thresholds. 1.Threshold set on basis of country by country thresholds established for shortlists comprised of national firms only

Phase III – Sector/Project Selection, Assessment and Implementation General criteria: 1. Based on projected lending program in CAS 2. Focused projects, preferably not multiple programs in a sector, but including SWAps 3. Not complex, preferably with a single implementing agency 4. No projects with a PIU to be considered. Procurement policy requires a capacity assessment of the responsible implementing agency for the sector/project.

Phase III –Project/Sector Assessment Procurement performance data collected from Implementing Agency to be assessed and will set baseline for monitoring: Procurement performance data collected from Implementing Agency to be assessed and will set baseline for monitoring: –Advertisement of opportunities –Time allowed for bid preparation –Time for bid evaluation and award –Use of less competitive methods –Time to resolve complaints –Award based on stated criteria –Payment process

Phase III – Project/Sector Assessment Capacity Assessment of Implementing Agency will use enhanced risk assessment tools to identify risk related factors Capacity Assessment of Implementing Agency will use enhanced risk assessment tools to identify risk related factors Risk mitigation measures agreed and made part of project requirements Risk mitigation measures agreed and made part of project requirements

Phase III – Sector/Project Implementation Loan Agreement will be specially constructed to cover key Bank requirements and provide Bank with normal remedies (misprocurement) and ability to rescind pilot status Loan Agreement will be specially constructed to cover key Bank requirements and provide Bank with normal remedies (misprocurement) and ability to rescind pilot status Procurement plans to be published, updated and carefully monitored Procurement plans to be published, updated and carefully monitored Complex and high value procurement to be identified and procurement notices published using UNDB in addition to other publication sites which will be identified for each pilot country Complex and high value procurement to be identified and procurement notices published using UNDB in addition to other publication sites which will be identified for each pilot country Annual independent third party procurement audits to be required Annual independent third party procurement audits to be required Performance data to be monitored throughout implementation Performance data to be monitored throughout implementation

Bank Role and Responsibilities Procurement Sector Board to be involved in the piloting process by providing oversight, staff development, support for resolution of issues and reporting on results Procurement Sector Board to be involved in the piloting process by providing oversight, staff development, support for resolution of issues and reporting on results Operations Procurement Review Committee (OPRC) will review and vet the phases of the assessment process Operations Procurement Review Committee (OPRC) will review and vet the phases of the assessment process Regional procurement staff – will retain normal supervision responsibilities focused on post review, performance monitoring, and capacity development Regional procurement staff – will retain normal supervision responsibilities focused on post review, performance monitoring, and capacity development

Some Additional Key Bank Responsibilities Monitoring of Performance Indicators Monitoring of Performance Indicators Monitoring of Complaints reported to Bank Monitoring of Complaints reported to Bank Monitoring of Payments Monitoring of Payments Management of remedies and key additional provisions in Loan Agreement Management of remedies and key additional provisions in Loan Agreement Reporting on Progress Reporting on Progress Monitoring of Disclosure Monitoring of Disclosure

Country Systems Part III Overview of the Consultation Strategy

Consultation Objectives Improve the quality of the new methodology for piloting the use of country systems in procurement Improve the quality of the new methodology for piloting the use of country systems in procurement Tap the knowledge of a diverse range of stakeholders Tap the knowledge of a diverse range of stakeholders Listen to issues raised and address them to the maximum extent in new methodology Listen to issues raised and address them to the maximum extent in new methodology Focus on future actions Focus on future actions

Types of Consultation I. A global electronic consultation with the document posted on the web and comments collected from WEB package will contain: 1. The process 2. Explanation of the process 3. Basic Q&A 4. Issues raised in the past and how new methodology addresses them 5. Summary of comments received and Bank’s response will be posted and regularly updated

Types of Consultation II. A multi country consultation with meetings held in both Part I and Part II Countries –Private Sector –Government –Other Stakeholders

Scheduled Consultations September2007 September2007 Copenhagen, Denmark Rome & Milan, Italy Paris, France Berlin, Germany Amsterdam, Netherlands London, UK JV for Procurement Mtg. October 2007 October 2007 –Japan –Korea –India To Be Scheduled: Senegal Kenya Others

Implementation Timeline Technical presentation to the Board in September 2007 Technical presentation to the Board in September 2007 Publish draft methodology on website in September 2007 following internal consultations Publish draft methodology on website in September 2007 following internal consultations Consultations with external stakeholders September – November, 2007 Consultations with external stakeholders September – November, 2007 Finalization of the Methodology in November 2007 Finalization of the Methodology in November 2007 Board approval in December 2007 Board approval in December 2007 Selection of Pilot Countries early 2008 Selection of Pilot Countries early 2008

The following are a few key issues for discussion: The World Bank has proposed a detailed methodology for a procurement country system piloting program in countries. What remaining questions need to be addressed or clarified about this program? The OECD/DAC benchmarking index provides for scoring of 54 sub-indicators on a 0-3 scale with a score of 3 representing best practice. 30 of 54 sub- indicators in the OECD/DAC tool have been identified as critical and require achieving the highest score of 3 for 22 of the sub-indicators or a score of 2 with an agreed action plan for 8 of the sub-indicators. Is this achievement level appropriate and if not, why? Key Discussion Issues

3. 3. Under this proposal, not all procurement would be included in these pilots. Should the Bank include complex, high value procurement such as those [e.g. highway construction, power generation equipment, information technology] now cleared by the Operations Procurement Review Committee (OPRC) in the use of pilot country procurement systems? Is the proposed handling of the Selection of Consultants in the pilots satisfactory? If not, how can this be strengthened?

Key Discussion Issues 5. Are the proposed performance based measures sufficient to address transparency, access to information and governance and anticorruption issues (GAC) that have been raised with regard to the pilots of country systems in procurement? 6. Do you have other suggestions that will strengthen the World Bank Group's efforts to help countries improve their procurement systems and help us learn from these pilots?

Handling of Past Issues Part IV How Current Methodology Addresses Issues Raised with regard to Previous Paper

ISSUES RAISED IN PREVIOUS PAPER HOW CURRENT METHODOLOGY ADDRESSES THESE ISSUES The 3 Tiered approach (Baseline Indicators, Performance Indicators and Equivalence) is an incomplete measurement OECD/DAC/WB BLI for measuring quality and compliance of a system not fully developed and tested at the time Performance and Equivalence measurements have been improved Results of CPPR and other PFM diagnostics will be considered Assessment will be carried out at three levels: Country/Sector/Project The standards have been set too low. There is a small number of mandatory requirements or critical sub-indicators (39%) which do not cover essential elements such as conflict of interest, dispute resolution, etc. No. of critical sub-indicators have been increased to 55% and all have to reach the maximum score of 3 and others at least a 2 using the OECD/DAC BLI (Version 4) Provisions for Special Agreement as part of the Loan Agreement subject to Application of Bank Remedies

Handling of Issues ISSUES RAISED IN PREVIOUS PAPER HOW CURRENT METHODOLOGY ADDRESSES THESE ISSUES Use of Bank’s Standard Bidding documents should be a requirement for ICB Bidding documents for major, complex and high value procurement (as identified in procurement plans) subject to OPRC prior reviews may use Bank’s SBD and will be reviewed against Bank’s Guidelines Performance of the system is not an eliminating criterion and its measurement too subjective Procurement is a specialized area and judgment of qualified specialists is necessary Countries and/or projects with poor performance track records will not be part of the pilot program

Handling of Issues ISSUES RAISED IN PREVIOUS PAPER HOW CURRENT METHODOLOGY ADDRESSES THESE ISSUES Indices for measuring equivalence related to the selection of consultants are not sufficient The new methodology recommends the use of Bank’s guidelines for contracts equivalent or greater than established threshold. For contracts of less value, agreed national procedures may be used The Bank is relinquishing its fiduciary responsibility The Bank will continue supervision missions and retain its right to review procurement decisions, audit all processes and declare misprocurement when needed The fraud and corruption provisions in the Guidelines will be maintained The Bank will continue to follow up on handling of complaints The Bank will require 3 rd Party Audits

Handling of Issues ISSUES RAISED IN PREVIOUS PAPER HOW CURRENT METHODOLOGY ADDRESSES THESE ISSUES Once a country is chosen for the pilot program, ongoing performance will no longer be a concern to the Bank The performance of the country will be monitored during implementation to ensure that progress, quality and standards are maintained The Loan Agreement will define remedies in case of non performance and obligations to be respected It is better to use one set of procurement guidelines instead of many country systems Using Country Systems strengthen borrowers’ capacity and increase transparency and contribute to the achievement of the objectives of the Paris Declaration on Aid Effectiveness Our objective is not to facilitate bidding for a few international bidders