PHASE II ESA 2014 ESA GUIDELINES. PHASE II ESA 2014 ESA GUIDELINES PROJECT DEVELOPMENT PROCESSES –PATH 2 AND 3 PROJECTS –PATH 4 AND 5 PROJECTS W/ WORK.

Slides:



Advertisements
Similar presentations
Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
Advertisements

Guidance on New CEs Emergency Repair Projects Operational Right-of-Way Limited Federal Funds EUM – March questions to:
Site Conceptual Models
Site Characterization Instructional Goal: Upon completion of this topic the participant will better understand the need to identify and evaluate various.
Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
ODOT's Environmental Site Assessment Process
DOE O Changes and the CRS
Background Presenters Work done in preparation for WHS changes
Overview of the EPRI Groundwater Assessment Program
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
ENVIRONMENTAL MONITORING AT SOLID WASTE (SW) LANDFILLS QUIZ Ruxandra Floroiu, Environmental Engineer, ECSSD WB Safeguards Workshop Chisinau, Moldova October.
Phase I Environmental Site Assessment
UNDERSTANDING ENVIRONMENTAL LABORATORY/QC REPORTS Maya Murshak – Merit Laboratories, Inc.
Sampling: Your data is only as good as your field technicians.
BoRit Superfund Site Timeline
Further Site Investigation Sutton Walls Former Landfill
ENVIRONMENTAL SITE ASSESSMENT SCREENING. Purpose First step in ODOT’s ESA Process Identifies all sites in project Use hard data to screen the project.
NRC LICENSE APPLICATION PROCESS
Importance of Quality Assurance Documentation and Coordination with Your Certified Laboratory Amy Yersavich and Susan Netzly-Watkins.
Columbia University IRB IRB 101 September 21, 2005 George Gasparis, Executive Director, CU IRB Asst. V.P. and Sr. Asst. Dean for Research Ethics.
The Nevada Department of Agriculture Water Quality Program The Nevada Department of Agriculture has been involved in groundwater protection since 1990.
Assessing Your School An Environmental Investigation You have been hired by Eagle Environmental, Inc. to perform an Environmental Assessment of South Hunterdon.
EnviroSense, Inc. An Overview of Environmental Factors in Developing Brownfields Sites in Massachusetts Presented By: Eric S. Wood, P.Hg., PG, LSP President.
Soils Investigation Soil Investigation
Phase I and Phase II Environmental Site Assessments Environmental Specialist Brownfields/Voluntary Cleanup Program June 2014.
DRAFT Field Sampling Guidance To be used this field season by DEC and consultants Initial focus on soil, groundwater, and vapor intrusion Future versions.
1. Identify Stakeholders 2. Establish the Criteria 3. Identify Potential Sites 4. Initial Screening/ Evaluations & Short List 5. Specific Site Study 6.
Appendix 8.1 – Waste Management Plan Oil Spill Contingency Plan – Land Document Number: KOC.SA.020 Incident Name: Incident Date/Time: Incident Location:
OSM CCB Placement in Coal Mines - Proposed Rulemaking John R. Craynon, P.E. Chief, Division of Regulatory Support Office of Surface Mining Reclamation.
Monitoring Well Post-Installation Consideration By: Pierre-Orly Dupont.
RCRA 101 Michael Gage New Jersey Department of Environmental Protection County Environmental and Waste Enforcement Special Investigations and Oversight.
Brandon Real Estate Board - June 19/20031 Your Logo Here ENVIRONMENTAL SITE ASSESSMENTS Phase I ENVIRONMENTAL SITE ASSESSMENTS Phase I.
Unit 5.6 Evidence and Sampling.
University of Miami Office of Research Compliance Assessment Lynn E. Smith, JD, CIM, CIP Johanna Stamates, RN, BA, CCRC With assistance from Elizabeth.
An Overview of Environmental Investigations January 22, 2002 Presented by: DuPont Corporate Remediation Group.
Denver Federal Center Calibration Silo Removal Plan What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
Evidence Preservation and Sampling
Review of Work Plan for Leaded Gasoline Tank Bottom Disposal Pit Assessment and Interim Stabilization Measures Presented by The Great Plains/Rocky Mountain.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
October Mary Louise Hendrickson Solid Waste Section – Technical Lead
UC DAVIS OFFICE OF RESEARCH Overview of Good Clinical Practices (GCP) Investigator and Study Team Responsibilities Miles McFann IRB Administration Training.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
MEDICAL WASTE MANAGEMENT REGULATIONS FOR THE HANDLING, TREATMENT & PROPER DISPOSAL OF MEDICAL WASTE, INCLUDING EBOLA WASTE Daniela Ortiz de Montellano.
Maryland Department of the Environment Harbor Point – Regulatory Overview Horacio Tablada, Director Land Management Administration November 14, 2013.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Environmental Toolbox. Technical Module Introduction.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
ENVIRONMENTAL SITE ASSESSMENT & THE PROJECT DEVELOPMENT PROCESS.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
California Integrated Waste Management Board 1 Committee Items C-D (Board Items 2-3) November 5, 2007 Consideration Of: Item C/2: The Scope Of Work For.
Is a Virtual Well Completion Report in California’s Future? Bob Pierotti Chief, Resources Assessment Branch Southern District.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Item 21 May 11-12, 2004 CIWMB Meeting Discussion And Request For Rulemaking Direction To Formally Notice Proposed Regulations For RCRA Subtitle D Program.
How does the VAP handle COCs that have left the VAP Property? Certified Professional Coffee February 24, 2016 Sydney Poole DERR-VAP.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
Proposed Plan for No Further Action
Noticing Package NOTICING PACKAGE Melike Altun, EM.
Regulated Material Review and Environmental Site Assessments
Release Reporting Lesson 17 covers the subject of Release Reporting. You will learn how you know when you have a leak and what leaks require reporting.
Westbrook Contractor Safety Training April 5, 2018
Environmental Issues Mapping Field Lab
Factsheet: Proper Permanent Well Abandonment for Virginia Coastal Plain Wells VDH DEQ What is.
Regulated Materials Review
Preparing a Site Conceptual Model
Management of Pollution Risks at Activity Cessation GROUP HSE RULE (CR-GR-HSE-421) EXECUTIVE SUMMARY This rule sets the HSE requirements for the management.
Presentation transcript:

PHASE II ESA 2014 ESA GUIDELINES

PHASE II ESA 2014 ESA GUIDELINES PROJECT DEVELOPMENT PROCESSES –PATH 2 AND 3 PROJECTS –PATH 4 AND 5 PROJECTS W/ WORK PLAN

PHASE II ESA A PHASE II ESA IS USED TO DETERMINE THE ABSENCE OR PRESENCE OF SUSPECTED CONTAMINATION WITHIN THE ROW DETERMINE THE WASTE CLASSIFICATION –SOLID WASTE –NON-HAZARDOUS –HAZARDOUS MAY BE USED TO DETERMINE THE EXTENT 2014 ESA GUIDELINES

PHASE II ESA PHASE II ESA IS USED TO PROVIDE A HIGHER DEGREE OF CONFIDENCE IN REGARD TO THE ENVIRONMENTAL RISK INVOLVED IN TAKING ROW OR WHOLE PROPERTIES 2014 ESA GUIDELINES

PHASE II ESA RIGHT OF ENTRY –ODOT AND ITS CONSULTANT HAVE THE RIGHT TO ENTER THE ROW OR PROPERTIES TO CONDUCT NECESSARY TESTING PROPERTY OWNER MUST BE NOTIFIED 48 HOURS IN ADVANCE 2014 ESA GUIDELINES

PHASE II ESA THE WORK MUST BEGIN NO MORE THAN 30 DAYS FROM THE DATE OF NOTIFICATION THE CONSULTANT SHOULD NEVER SIGN AN ACCESS AGREEMENT WITH THE OWNER 2014 ESA GUIDELINES

PHASE II ESA WORK PLAN INTRODUCTION FIELD ACTIVITIES/SAMPLING PROCEDURES –SOIL BORING/MONITORING WELL LOCATIONS –SAMPLING METHODS –FIELD SCREENING AND SAMPLE SELECTION –ANALYTICAL METHODS –QUALITY ASSURANCE / QUALITY CONTROL –GEOPHYSICAL SURVEY (IF APPLICABLE) SITE DIAGRAM –PROJECT MANAGEMENT PLAN 2014 ESA GUIDELINES

PHASE II ESA PHASE II ESA ASSESSMENT IS BASED ON AN OES IOC RECOMMENDATION FOR FURTHER ASSESSMENT –EITHER BASED ON AN APPROVED WORK PLAN; –OR, OES IOC WITH DIRECTION OF WHAT WORK TO COMPLETE 2014 ESA GUIDELINES

HEALTH AND SAFETY PLAN A SITE SPECIFIC HEALTH AND SAFETY PLAN IS REQUIRED UNDER 29 CFR –THE SAFETY PLAN SHOULD NOT BE SUBMITTED TO ODOT FOR APPROVAL OR –SHOULD NOT BE INCLUDED IN THE PHASE II REPORT 2014 ESA GUIDELINES

PHASE II ESA ASSESSMENT IN ALL CASES, THE OES IOC IS CONSIDERED THE FINAL DECISION FOR THE PHASE II ESA DOCUMENT 2014 ESA GUIDELINES

PHASE II ESA FIELD WORK –OWNER NOTIFICATION COMPLETE –OUPS AND LOCATORS NOTIFIED IN ADVANCE –ALL DIRECTION COORDINATED –AUTHORIZATION IN PLACE 2014 ESA GUIDELINES

PHASE II ESA PREFERED METHOD OF INVESTIGATION –DIRECT PUSH TECHNOLOGY LESS WASTE GENERATION SMALLER EQUIPMENT FASTER –HOLLOW STEM AUGER GENERATES LARGE AMOUNTS OF WASTE –AIR ROTORY USED FOR DRILLING BEDROCK 2014 ESA GUIDELINES

DIRECT PUSH TECHNOLOGY 2014 ESA GUIDELINES

PHASE II ESA BORINGS –DESIGNATED LOCATIONS & DEPTH VARIATIONS MUST BE APPROVED BY OES MONITORING WELLS –IF REQUESTED, PROPER DEPTH & SCREEN LENGTH WITHIN THE FIRST WATER BEARING ZONE 2014 ESA GUIDELINES

PHASE II ESA SOIL SAMPLE COLLECTION –CONTINOUS SAMPLE COLLECTION –HIGHEST FIELD SCREEN READING SINGLE SAMPLE PER BORING –UNLESS CHANGE HAS BEEN AUTHORIZED OR 2014 ESA GUIDELINES

PHASE II ESA PID SCREEN READING AT ZERO (0) SIGHT AND SMELL SOIL SAMPLE IMMEDIATELY ABOVE SOIL/GROUNDWATER INTERFACE OR BOTTOM OF BORING 2014 ESA GUIDELINES

PHASE II ESA GROUNDWATER SAMPLING –FROM DEVELOPED WELL –PURGED WITH MINIMUM 3 WELL VOLUMES –CLEAN DISPOSIBLE BAILER –STATIC WATER LEVELS SHOULD BE COLLECTED PRIOR TO PURGING OF WELL 2014 ESA GUIDELINES

PHASE II ESA FREE PRODUCT –IF FREE PRODUCT IS FOUND DURING GROUNDWATER SAMPLING THE CONSUTANT SHOULD IMMEDIATELY NOTIFY THE DISTRICT ENVIRONMENTAL COORDINATOR OF THE SITUATION –THE OWNER OF THE PROPERTY SHOULD THEN BE NOTIFIED OF THE PRESENCE OF PRODUCT ON HIS PROPERTY 2014 ESA GUIDELINES

PHASE II ESA SAMPLE PREPARATION –PROPER SIZED LAB CONTAINERS LABELED PROTECTED ICED –COMPLETED CHAIN OF CUSTODY –ALL IN ICE CHEST FOR SHIPPING 2014 ESA GUIDELINES

PHASE II ESA GEOPHYSICAL SURVEY –IF REQUESTED TO DETERMINE PRESENCE OF STRUCTURES LIKE UNDERGROUND TANKS OR OBJECTS 2014 ESA GUIDELINES

PHASE II ESA EXCEPTIONS: –NEAR SURFACE SAMPLNG –SHALLOW BORINGS (SOIL ONLY) –SEDIMENT SAMPLES (HAND PROBE) –LAND FILL SAMPLING (OAC ) 2014 ESA GUIDELINES

ANALYTICAL TYPICAL: –VOC - (SW 846 METHOD 8260) –SVOC - (SW 846 METHOD 8270) –TPH (GRO, DRO, & ORO) (METHOD 8015B) –RCRA METALs - (SW 846 METHOD 6010) 2014 ESA GUIDELINES

BORING/WELL SEALING BORINGS: –BENTONITE PELLETS AND HYDRATION MONITORING WELLS: –STATE COORDINATING COMMITTEE ON GROUNDWATER TECHNICAL GUILDELINES FOR SEALING UNUSED WELLS 2014 ESA GUIDELINES

REPORTING Phase II ESA Report Requirements –Executive Summary –Signature Page –Introduction –Background Information –Geological Information, Physical Setting, Regional Hydrology 2014 ESA GUIDELINES

REPORTING –Geophysical Survey Discussion –Field Activities and Sampling Procedures –Geophysical Survey –Field Screening and Sample Selection –Analytical Test Results –Quality Assurance/Quality Control –Findings, Data Evaluation and Regulatory Interpretation 2014 ESA GUIDELINES

REPORTING –Geophysical Survey Results –Field Screening Results –Boring Log Descriptions –Analytical Test Results –Quality Assurance/Quality Control –Conclusions and Recommendations 2014 ESA GUIDELINES

REPORTING Appendices –Project location maps (including topographic and county maps) –Diagrams with sampling locations –Potentiometric (if necessary) –Geophysical survey report –Soil boring logs 2014 ESA GUIDELINES

REPORTING –Laboratory analytical reports and chain of custody –Other regulatory reports and/or data (if necessary) 2014 ESA GUIDELINES

PLAN NOTES PCS – PETROLEUM CONTAMINATED SOIL PLAN NOTE SOLID/HAZARDOUS WASTE PLAN NOTE REGULATED WATER PLAN NOTE 2014 ESA GUIDELINES

PLAN NOTES PLAN NOTES ARE EITHER DEVELOPED BY OES, DISTRICT OR CONSULTANT –PLAN NOTE IS TO DESCRIBE THE MANAGEMENT OF THE MATERIALS DURING CONSTRUCTION 2014 ESA GUIDELINES

PLAN NOTES PLAN NOTES ARE INCORPORATED INTO THE CONSTRUCTIO PLANS AS PART OF THE CONSTRUCTION CONTRACT 2014 ESA GUIDELINES

REMEDIAL DESIGN FOR PROPERTIES WHERE CONTAMINATION IS PRESENT THEN A REMEDIAL DESIGN PLAN MAY BE DEVELOPED TO ENSURE THAT THE MATERIAL IS MANAGED CONSISTENT WITH THE APPROPRIATE ENVIRONMENTAL REGULATIONS 2014 ESA GUIDELINES

INVESTIGATION DERIVED WASTE WASTE MATERIALS SHOULD BE MANAGED AND DISPOSED OF IN ACCORDANCE WITH ODOT’s REVISED GUIDANCE REGARDING MANAGEMENT OF INVESTIGATION DERIVED WASTE (APPENDIX N) 2014 ESA GUIDELINES