Stakeholder Meeting on Preliminary Draft Language October 12, 2011 1.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Author: Julia Richards and R. Scott Hawley
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Summary of Convergence Tests for Series and Solved Problems
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
2 HOME DELIVERED MEALS Waiver Workshop Presented by: Regional and Local Services (RLS) Access and Intake /Area Agency on Aging (A&I/AAA) May 27-28, 2009.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
The Year 5/6 Science Quiz Part Two.
The Year 5/6 Science Quiz Part One.
ZMQS ZMQS
Air Pollution Control « Air Pollution Control Ordinance » ( Chapter 311 ) The Air Pollution Control Ordinance(APCO) is the main legislative framework.
The UEA House of Delegates Directing YOUR Association through the democratic process. 1.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
ABC Technology Project
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
MPCA Rulemaking Project for Source-Separated Organic Material Compost Facilities Stakeholder Meeting to Discuss Scope and Key Concepts November 19, 2010.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Stakeholder Meeting for Focused Feedback February 10, w-swrule2-05.
Presented to: Minnesota Chamber of Commerce October 1, 2012.
Watershed Staff Videoconference October 17, 2012.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
November 4,
Stakeholder Meeting for Focused Feedback February 10,
Composting Rules Source Separated Organics Update Tim Farnan 2013 SWANA/AWMA Landfill Operator Training.
Composting Rule Update Tim Farnan 2013 Minnesota Composting Council Fall Workshop.
The Compost Rule Project November 19, Introduction Logistics Webcast Information – s during live webcast must be sent to
Stakeholder Meeting to Discuss Scope and Key Concepts November 19,
Stakeholder Meeting to Discuss Scope and Key Concepts November 19, w-swrule2-05.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Equal or Not. Equal or Not
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Presentation transcript:

Stakeholder Meeting on Preliminary Draft Language October 12,

Purpose of SSOC Rule Process Recognize state strategy of moving organic material management up the hierarchy Clarify regulatory requirements appropriate to SSOC facilities Provide regulatory relief without jeopardizing environmental protection 2

Compost Rules MPCA Mgmt. Team Solid Waste Program Manager: Steve Giddings Permitting Unit Supervisor: Paula Connell Rulemaking Unit Supervisor: Dave Richfield Integrated SW Unit Supervisor: Mark Rust 3

Compost Rules MPCA Staff Team Rulemaking Coordinator - Yolanda Letnes Engineering - Tony Bello Hydrogeology related to siting - John Elks Operations & compost testing - Ginny Black Solid Waste Policy Expert - Jim Chiles 4

5

Tentative Rule Schedule Request for Comments: 10/17/11 (revised) Comment period closes at 4:30pm 11/18/11 Dual Notice (DN) – Summer 2012 Final Adoption: with hearing - 6 months after DN w/o hearing - 3 months after DN 6

Overview: SSOC Rule Process How this meeting fits in the larger timeline, leading to publication of a draft rule Meeting purpose Timeline of rule process 7

8

Preliminary Draft Rule sections: Solid Waste Management Facility Permit Application Final Application Information Requirements for Compost Facilities Extended Permit Notification and Termination Procedures Definitions Solid Waste Management Facilities Governed Location Standards Annual Report Compost Facilities 9

Overview of preliminary draft requirements: Extended Permits Small Compost Sites Design and Location Standards Operations, Compost Classification and Compost Distribution 10

Extended Permit Revisions contained within , , & , subp. 4 What exactly is an extended permit? What are conditions? 11

Extended Permit – municipality approvals Extended permit notification and termination procedures (i.e., return to permitting process) 12

Small Compost Sites Existing Rule – Exempts household composting Proposed rule changes: Acceptable materials: food scraps, garden waste, weeds, lawn cuttings, leaves Prohibited materials: fats, oil, grease, meat, dairy, animal manure, diapers, sanitary products, non-recyclable paper and compostable/biodegradable plastics Materials do not exceed 80 yd 3 on site at any given time Compost operations accepting food waste generated off-site must attend compost training 13

Small Compost Sites Materials on-site do not exceed 80 yd 3 on site at any given time Compost operations accepting food waste generated off-site must attend compost training 14

New Definitions Small Compost Site Source-separated organics waste compost facility (SSOC) Source separated organics waste Separated by the generator 15

Source Separated Organics Waste Acceptable Material Food waste Soiled or unrecyclable paper Yard waste Vegetative waste generated from manufacturing of food for humans Compostable materials-ASTM D6400/D6868 Materials approved by the commissioner 16

Source Separated Organics Waste Unacceptable materials Biosolids Sludge Septage Diapers Sanitary products Animal manure 17

SSOC Location Standards Not in Karst Must be 5 feet above water table Minimum of 500 feet of horizontal separation from the facility to the nearest residence, business or public contact area 18

SSOC Location Standards Enclosed facility may have reduced separation distances Excluded from separation distances: Land owner’s or operator’s residence Plant nurseries, or Turf farms 19

20

SSOC Operation requirements Strengthened training 24 initial contact hours within 12 months of employment 10 contact hours every 3 years (1 contact hour = 50 minutes) Minimum C:N ratio 1:1 21

SSOC Operation requirements PFRP unchanged No static piles Windrows or enclosed vessel systems only 22

SSOC Operation requirements SSO waste delivered to the facility must be processed immediately or covered with a biofilter and processed by the end of the day Acceptable bulking agent – untreated wood, non-recyclable paper, ground tree/shrubs 23

SSOC Operation requirements Non-attainment area for O 2 - Biofilter cover after 21-days of processing Progressive odor minimization plan 24

SSOC Classification requirements Class I standards remain the same Metal Inert Opt out for Hg and PCB’s after 5 years if all testing is non-detects 25

SSOC Classification requirements Class II standards remain the same Metal Inert 26

SSOC Distribution and End Use requirements Dept. of Ag rule 18.C, subp.?005 - same Class I compost does not need a compost distribution plan Class II compost distribution plan requirements unchanged 27

Questions? 28