Www.nasa.gov January 22, 2009 Ares I-X Crew Module and Launch Abort System (CM/LAS) Jonathan Cruz Deputy Project Manager Jonathan Cruz Deputy Project Manager.

Slides:



Advertisements
Similar presentations
University of Florida Hybrid Rocket Team’s Mile High Club
Advertisements

Aerospace Vehicle Ground Testing Sandia National Laboratories Trisonic Wind Tunnel (TWT) Technical Characteristics Blowdown to atmosphere M = ,
BYU Rocket Team Special thanks to:
Northwestern University Space Technology and Rocketry Society (NUSTARS) NASA Student Launch Flight Readiness Review March 16, 2015.
Critical Design Review ….. Royal Ordnance,Summerfield 17 th February 2001 National Rocketry Competition 2001 Open Rocketry Association Slide 1/14.
Ares V RFI Point of Departure Information Package
Exploration Launch Office Scope
Charles Nola Lisa Blue June 21, 2006 Charles Nola Lisa Blue June 21, 2006 Crew Launch Vehicle (CLV) Upper Stage Avionics & Software Acquisition Planning.
Critical Design Review NASA University Student Launch Initiative University of Nebraska–Lincoln
Illinois Space Society Tech Team USLI CDR Presentation.
Rocketry 101 Jeremy Young American Institute of Aeronautics and Astronautics at UCF.
St. Vincent – St. Mary FRR Presentation NASA Student Launch Initiative.
UAA Rocketry Critical Design Review Presentation.
NASA SLI 2010 Mulberry Grove High School Flight Readiness Review Measurement of UVB Radiation Absorption by Cloth Material at Different Altitudes and Measurement.
Student Launch Project Critical Design Review February 28, 2014.
Atmospheric Wind Measurement WindSat University of Colorado at Colorado Springs at Colorado Springs WindSat Team: Rodger Mourning Courtnee Applegate Justin.
Design of a small instrumented atmospheric descent probe NASA Ames Research Center.
Flight Readiness Review Atomic Aggies. Final Launch Vehicle Dimensions Diameter 5.5” Overall length: inches Approximate Loaded Weight: lb.
Critical Design Review of “Mach Shock Reduction” Phase II January 2008 Statesville, NC.
Illinois Space Society Tech Team USLI FRR Presentation.
Intercollegiate Rocket Engineering Competition Spring 2015 EML Ethics and Design Project Organization.
Pioneer Venus & Galileo Probe Development: Comparison/Assessment John Givens.
MER PDS PDR - Document No. EA Mars Exploration Rover 3 April 2001ACW - 1 Welcome MER Parachute DeceleratorSystem Preliminary Design Review.
Student Launch Project Flight Readiness Review April 21, 2014.
Science Fiction. Rocket flight Centre of Mass or Centre of Gravity (CM or CG) Centre of mass is the mean or central location of all the mass of an object.
 Vehicle dimensions, materials, and justifications  Static stability margin  Plan for vehicle safety verification and testing  Baseline motor selection.
A3 Altitude Test Facility
Ares I-X Status July 30, Ares I-X Flight Test Overview  Ares I-X is a Constellation Program developmental flight test for the Ares.
Flight Readiness Review Team Hawaii. Vehicle Properties Diameter (in)6 inches Length (in)127 inches Gross Liftoff Weight (lb)50.25 lb Launch Lug/button.
Constellation Program Overview Mark Geyer Constellation Program Office October 2006.
FRR Presentation IF AT FIRST YOU DON’T SUCCEED, TRY AGAIN… AND AGAIN AND AGAIN AND AGAIN.
Flight Readiness Review Student Launch Initiative SCS Rocket Team Statesville Christian School April 2, 2008.
University of Florida Rocket Team Critical Design Review Presentation.
Where No One Has Gone Before… E80: The Next Generation Section 1, Team 1 Student 1, Student 2, Student 3, and Student 4 May 5, 2008.
Critical Design Review Presentation Jan. 20, 2011.
AAE 450 Spring 2008 Tim Lorenzana 1/16/2008 Avionics Recovery/Termination.
Critical Design Review- UCF Jeremy Young Anthony Liauppa Erica Terry, Emily Sachs Kristen Brightwell Gillian Smith 1.
COMPARISON OF THE HUYGENS MISSION AND THE SM2 TEST FLIGHT FOR HUYGENS ATTITUDE RECONSTRUCTION ENGINEERING PROPERTIES PROPERTIESHuygens Flight Module SM2.
Ares I-X INDUSTRY DAY Scott Graham William Foster Monica Hoffmann
HARDING UNIVERSITY A Study of Atmospheric Properties as a Function of Altitude Flying Bison.
PROGRAM UPDATE March 2012.
AAE 450- Propulsion LV Stephen Hanna Critical Design Review 02/27/01.
STRATEGIES FOR MARS NETWORK MISSIONS VIA AN ALTERNATIVE ENTRY, DESCENT, AND LANDING ARCHITECTURE 10 TH INTERNATIONAL PLANETARY PROBE WORKSHOP June,
Atomic Aggies CDR. Final Launch Vehicle Dimensions Diameter 5.5” Overall length: inches Approximate Loaded Weight: lb.
Preliminary Design Review.  Completed practice launch  New motor selection  Corrected simulations  Improved payload construction  Increased.
Project Ares University of Central Florida NASA Student Launch 1/28/2015.
TESLA Rocket Project Lecture #3 10/28/15
UNITY IV Critical Design Review Hill Air Force Base 13 April 2000 Phase II First Launch.
HARDING UNIVERSITY FLYING BISONS A Study of Atmospheric Properties as a Function of Altitude Flight Readiness Review.
Critical Design Review Presentation Project Nova.
Launch Structure Challenge - Background Humans landed on the moon in 1969 – Apollo 11 space flight. In 2003, NASA started a new program (Ares) to send.
UCF_USLI Preliminary Design Review David Cousin Freya Ford Md Arif Drew Dieckmann Stephen Hirst Mitra Mossaddad University of Central Florida.
High Altitude Rocket Project School of Science and Engineering | Integrated Project Mjölnir.
Project Aegis Preliminary Design Review Team Members:
Preliminary Design Review Presentation
College of Engineering
Critical Design Review Presentation
2018 First Nation Launch - Flight Readiness Review
Georgia Tech NASA Preliminary Design Review Teleconference
Matching of Propulsion Systems for an Aircraft
(Venus Atmospheric Student Team)
Final Readiness Review
2019 First Nation Launch – FRR Virtual Review
2019 First Nation Launch – PDR Virtual Review
Rocketry Trajectory Basics
2019 First Nation Launch – CDR Virtual Review
Plantation High SL team 1
University of Iowa USLI
2019 First Nation Launch – Oral Presentation
Presentation transcript:

January 22, 2009 Ares I-X Crew Module and Launch Abort System (CM/LAS) Jonathan Cruz Deputy Project Manager Jonathan Cruz Deputy Project Manager

2 Ares I-X CMLAS CDR February 12-13, Mission / Project Overview Ares I-X Overview Ares I-X is a Flight Test Vehicle being developed to provide flight control and performance data for the Ares I Crew Launch Vehicle (CLV) design process Objectives of the test flight: Ascent performance First stage separation and recovery Ares I-X will provide proof of flight control strategy for CLV and data to validate aerodynamic databases and engineering predictions across multiple discipline tools J-2x Engine Mass Model (not shown) Interstage Roll Control System (not shown) Empty 5 th Segment Crew Module (CM) / Launch Abort System (LAS) Simulator 4-Segment Motor Upper Stage Simulator (USS) First Stage (FS) Frustum Primary Avionics and Developmental Flight Instrumentation (not shown) First Stage Avionics (not shown) Ballast (not shown) Forward Skirts Booster Separation Motors (not shown)

3 January 22, 2009

4 Ares I-X CMLAS CDR February 12-13, Mission / Project Overview Separation +270 secs Chute deployment begins Booster, Parachutes and Recovery USS / CM / LAS Uncontrolled descent and impact Separation +15 secs Frustum / Interstage separation Pitch over Launch Thrust < 40K lb-force, FS separation begins Flight Profile Maximum Altitude: 200,000 ft Peak Velocity: Mach 6.1

5 January 22, 2009 Ares I-X CM / LAS Overview Purpose: Provide the Crew Module (CM) and Launch Abort System (LAS) mass simulator hardware for the Ares I-X mission Primary requirements are to match the specified outer mold line and mass properties Primary hardware interfaces: Upper Stage Simulator Avionics Developmental Flight Instrumentation (DFI) Deliverables: CM & LAS flight test hardware with installed DFI CM & LAS Handling Ground Support Equipment Documentation 53 Long 16 Diameter 16,000 lb

6 January 22, 2009 Instrumentation in CM/LAS 270° Pressure Transducer Thermocouple Accelerometer Air Vane Calorimeter 0°0° Total Air Temperature 5-Hole Probe

7 January 22, 2009 CMLAS Test Stacking